Table of Contents
Calculation Input ..................................................................................................................................................................... 2
Tedds Calculation ................................................................................................................................................................... 4
Retaining wall analysis ........................................................................................................................................................ 4
Retaining wall design......................................................................................................................................................... 12
STEM DESIGN FORCES...................................................................................................................................................... 19
STEM SERVICEABILITY MOMENT ...................................................................................................................................... 20
BASE DESIGN FORCE COMBINATION 1 ............................................................................................................................ 21
BASE DESIGN FORCES COMBINATION 2 .......................................................................................................................... 24
Final Base Design Forces ..................................................................................................................................................... 26
BASE SERVICEABILITY FORCES ....................................................................................................................................... 27
Project Job Ref.
CALCULATION INPUT
Project Job Ref.
TEDDS CALCULATION
Loading details
Variable surcharge load; SurchargeQ = 10 kN/m2
Project Job Ref.
- Distance to horizontal component; xmoist_h = (hmoist ´ (tbase + hsat + hmoist / 3) / 2 + (hsat + tbase)2/2) / (hsat +
tbase + hmoist / 2) = 1530 mm
Area of base soil; Apass = dcover ´ ltoe = 2 m2
- Distance to vertical component; xpass_v = lbase - (dcover ´ ltoe´ (lbase - ltoe / 2)) / Apass = 1000 mm
- Distance to horizontal component; xpass_h = (dcover + hbase) / 3 = 450 mm
Area of excavated base soil; Aexc = hpass ´ ltoe = 1 m2
- Distance to vertical component; xexc_v = lbase - (hpass ´ ltoe´ (lbase - ltoe / 2)) / Aexc = 1000 mm
- Distance to horizontal component; xexc_h = (hpass + hbase) / 3 = 283 mm
Sliding check
Vertical forces on wall
Wall stem; Fstem = gGf ´ Astem ´ gstem = 30.6 kN/m
Wall base; Fbase = gGf ´ Abase ´ gbase = 33.7 kN/m
Saturated retained soil; Fsat_v = gGf ´ Asat ´ (gsr' - gw') = 32 kN/m
Water; Fwater_v = gGf ´ Awater ´ gw' = 25.8 kN/m
Moist retained soil; Fmoist_v = gGf ´ Amoist ´ gmr' = 52.5 kN/m
Base soil; Fexc_v = gGf ´ Aexc ´ gb' = 20 kN/m
Project Job Ref.
Total; Ftotal_v = Fstem + Fbase + Fsat_v + Fmoist_v + Fexc_v + Fwater_v = 194.6 kN/m
Moments on wall
Wall stem; Mstem = Fstem ´ xstem = 89.9 kNm/m
Wall base; Mbase = Fbase ´ xbase = 87.5 kNm/m
Surcharge load; Msur = Fsur_v ´ xsur_v - Fsur_h ´ xsur_h = 32.7 kNm/m
Saturated retained soil; Msat = Fsat_v ´ xsat_v - Fsat_h ´ xsat_h = 125.4 kNm/m
Water; Mwater = Fwater_v ´ xwater_v - Fwater_h ´ xwater_h = 87.3 kNm/m
Moist retained soil; Mmoist = Fmoist_v ´ xmoist_v - Fmoist_h ´ xmoist_h = 148 kNm/m
Base soil; Mpass = Fpass_v ´ xpass_v - Fpass_h ´ xpass_h = 93.4 kNm/m
Total; Mtotal = Mstem + Mbase + Msat + Mmoist + Mpass + Mwater + Msur = 664.4
kNm/m
Check bearing pressure
Distance to reaction; `x = Mtotal / Ftotal_v = 2128 mm
Eccentricity of reaction; e = `x - lbase / 2 = 203 mm
Loaded length of base; lload = 2 ´ (lbase - `x) = 3443 mm
Bearing pressure at toe; qtoe = 0 kN/m2
Bearing pressure at heel; qheel = Ftotal_v / lload = 90.7 kN/m2
Project Job Ref.
Effective overburden pressure; q = (tbase + dcover) ´ gb' - (tbase + dcover + hwater) ´ gw' = 6.4 kN/m 2
Design effective overburden pressure; q' = q / gg = 6.4 kN/m2
Bearing resistance factors; Nq = Exp(p ´ tan(f'b.d)) ´ (tan(45 deg + f'b.d / 2))2 = 18.401
Nc = (Nq - 1) ´ cot(f'b.d) = 30.14
Ng = 2 ´ (Nq - 1) ´ tan(f'b.d) = 20.093
Foundation shape factors; sq = 1
sg = 1
sc = 1
Load inclination factors; H = Fsur_h + Fsat_h + Fwater_h + Fmoist_h + Fpass_h = 19.8 kN/m
V = Ftotal_v = 312.2 kN/m
m=2
iq = [1 - H / (V + lload ´ c'b.d ´ cot(f'b.d))]m = 0.877
ig = [1 - H / (V + lload ´ c'b.d ´ cot(f'b.d))](m + 1) = 0.822
ic = iq - (1 - iq) / (Nc ´ tan(f'b.d)) = 0.87
Net ultimate bearing capacity; nf = c'b.d ´ Nc ´ sc ´ ic + q' ´ Nq ´ sq ´ iq + 0.5 ´ (gb' - gw') ´ lload ´ Ng ´ sg
´ ig
nf = 392.9 kN/m 2
Factor of safety; FoSbp = nf / max(qtoe, qheel) = 4.334
PASS - Allowable bearing pressure exceeds maximum applied bearing pressure
Partial factors on actions - Table A.3 - Combination 2
Permanent unfavourable action; gG = 1.00
Permanent favourable action; gGf = 1.00
Variable unfavourable action; gQ = 1.30
Variable favourable action; gQf = 0.00
;Partial factors for soil parameters – Table A.4 - Combination 2
Angle of shearing resistance; gf' = 1.25
Effective cohesion; gc' = 1.25
Weight density; gg = 1.00
;Water properties
Design water density; gw' = gw / gg = 9.8 kN/m 3
Passive pressure coefficient; KP = sin(90 - f'b.d)2 / (sin(90 + db.d) ´ [1 - Ö[sin(f'b.d + db.d) ´ sin(f'b.d) /
(sin(90 + db.d))]]2) = 3.473
Sliding check
Vertical forces on wall
Wall stem; Fstem = gGf ´ Astem ´ gstem = 30.6 kN/m
Wall base; Fbase = gGf ´ Abase ´ gbase = 33.7 kN/m
Saturated retained soil; Fsat_v = gGf ´ Asat ´ (gsr' - gw') = 32 kN/m
Water; Fwater_v = gGf ´ Awater ´ gw' = 25.8 kN/m
Moist retained soil; Fmoist_v = gGf ´ Amoist ´ gmr' = 52.5 kN/m
Base soil; Fexc_v = gGf ´ Aexc ´ gb' = 20 kN/m
Total; Ftotal_v = Fstem + Fbase + Fsat_v + Fmoist_v + Fexc_v + Fwater_v = 194.6 kN/m
Moments on wall
Wall stem; Mstem = Fstem ´ xstem = 66.6 kNm/m
Wall base; Mbase = Fbase ´ xbase = 64.8 kNm/m
Surcharge load; Msur = Fsur_v ´ xsur_v - Fsur_h ´ xsur_h = 21 kNm/m
Saturated retained soil; Msat = Fsat_v ´ xsat_v - Fsat_h ´ xsat_h = 91.5 kNm/m
Project Job Ref.
Concrete details - Table 3.1 - Strength and deformation characteristics for concrete
Concrete strength class; C30/37
Characteristic compressive cylinder strength; fck = 30 N/mm2
Characteristic compressive cube strength; fck,cube = 37 N/mm2
Mean value of compressive cylinder strength; fcm = fck + 8 N/mm2 = 38 N/mm2
Mean value of axial tensile strength; fctm = 0.3 N/mm2 ´ (fck / 1 N/mm2)2/3 = 2.9 N/mm2
5% fractile of axial tensile strength; fctk,0.05 = 0.7 ´ fctm = 2.0 N/mm2
Secant modulus of elasticity of concrete; Ecm = 22 kN/mm2 ´ (fcm / 10 N/mm2)0.3 = 32837 N/mm2
Partial factor for concrete - Table 2.1N; gC = 1.50
Compressive strength coefficient - cl.3.1.6(1); acc = 0.85
Project Job Ref.
Reinforcement details
Characteristic yield strength of reinforcement; fyk = 500 N/mm2
Modulus of elasticity of reinforcement; Es = 200000 N/mm2
Partial factor for reinforcing steel - Table 2.1N; gS = 1.15
Design yield strength of reinforcement; fyd = fyk / gS = 435 N/mm2
Cover to reinforcement
Front face of stem; csf = 40 mm
Rear face of stem; csr = 50 mm
Top face of base; cbt = 50 mm
Bottom face of base; cbb = 75 mm
Soil Parameters
KA = 0.333; KP = 4.977;
Loads and Dimensions
SurchargeQ = 10.0 kN/m2; gsr = 22.0 kN/m3; gmr = 20.0 kN/m3
gw = 9.8 kN/m3; hstem = 3500.0 mm; hsat = 1750.0 mm;
hwater = 750.0 mm
The Tedds calculation result is shown in brackets () after the calculated value
Design Shear force; Vdes_s = Fsur_hfs + Fsat_hs + Fwater_hs + Fmoist_hs = 87.46 kN/m; (87.5) P
Moment due to surcharge; Msur_hfs = Fsur_hfs ×hstem/2 = 30.59 kNm/m
Moment due saturated retained soil; Msat_hs = Fsat_hs × hsat/3 = 4.89 kNm/m
Moment due Water; Mwater_hs = Fwater_hs × hsat/3 = 11.83 kNm/m
Moment due moist retained soil; Mmoist_hs = Fmoist_hsa×(2×hsat +hstem)/3 + Fmoist_hsb × hsat/2= 56.22 kNm/m
Design moment; Mdes_s = Msur_hfs + Msat_hs + Mwater_hs + Mmoist_hs = 103.54 kNm/m; (103.6) P
Project Job Ref.
Soil Parameters
KA = 0.333; KP = 4.977;
Loads and Dimensions
SurchargeQ = 10.0 kN/m2; gsr = 22.0 kN/m3; gmr = 20.0 kN/m3
gw = 9.8 kN/m3; hstem = 3500.0 mm; hsat = 1750.0 mm;
hwater = 750.0 mm
Service Shear force; Vdes_s = Fsur_hfs + Fsat_hs + Fwater_hs + Fmoist_hs = 58.8 kN/m;
Values from Tedds calculation (see Tedds calculation above for working)
Distance to total reaction force (from front of base); `x = 2128 mm
Eccentricity of reaction; e = 203 mm;
within middle third hence full contact and trapezoidal pressure distribution
Total vertical load = total bearing pressure force; F v_comb1 = 312.2 kN/m
Length of base; Lb = lbase = 3850 mm
+
= ℎ
2
ℎ 2 +
=
3 +
Project Job Ref.
Since e is positive qh > qt hence let b = qh , a = qt , h = Lb and A = Fv. From above equations solving for qh and qt gives:
6 2
= −
3
6 1
ℎ = −
3
Bearing pressure at toe; qt = (6´ Fv_comb1 /Lb)´ (2/3 - `x /Lb) = 55.44 kN/m 2
Bearing pressure at heel; qh = (6´ Fv_comb1 /Lb)´ (`x /Lb - 1/3) = 106.75 kN/m2
Vertical Loads
Weight of toe; W toe = gG ×ltoe × tbase ×gbase = 23.63 kN/m
Weight of soil in front of wall; W soil_f = gG × ltoe ×dcover ´ gb = 54.00 kN/m
Resulting Moments
Moment due to toe weight; Mtoe_swt = W toe × ltoe / 2 = 23.63 kNm/m
Moment due to soil in front of wall; Msoil_f = W soil_f × ltoe/2 = 54 kNm/m
Vertical Loads
Weight of surcharge; W surv_s = gQ × SurchargeQ ´ lheel = 22.5 kN/m
Saturated retained soil; Fsat_v = gG ´ Asat ´ (gsr - gw) = 43.2 kN/m
Water; Fwater_v = gG ´ Awater ´ gw = 34.8 kN/m
Moist retained soil; Fmoist_v = gG ´ Amoist ´ gmr = 70.9 kN/m
Weight of heel; W heel1 = gG ×lheel × tbase ×gbase = 17.719 kN/m
Total Weight surchage, soil & heel; W total1 = W surv_s + Fsat_v + Fwater_v + Fmoist_v + W heel1= 189.1 kN/m
Vertical Loads
Weight of toe; W toe = gG ×ltoe × tbase ×gbase = 17.50 kN/m
Weight of soil in front of wall; W soil_f = gG × ltoe ×dcover ´ gb = 40.00 kN/m
Resulting Moments
Moment due to toe weight; Mtoe_swt = W toe × ltoe / 2 = 17.50 kNm/m
Moment due to soil in front of wall; Msoil_f = W soil_f × ltoe/2 = 40 kNm/m
Vertical Loads
Weight of surcharge; W surv_s = gQ × SurchargeQ ´ lheel = 19.5 kN/m
Saturated retained soil; Fsat_v = gG ´ Asat ´ (gsr - gw) = 32 kN/m
Water; Fwater_v = gG ´ Awater ´ gw = 25.8 kN/m
Moist retained soil; Fmoist_v = gG ´ Amoist ´ gmr = 52.5 kN/m
Weight of heel; W heel1 = gG ×lheel × tbase ×gbase = 13.125 kN/m
Total Weight surchage, soil & heel; W total2 = W surv_s + Fsat_v + Fwater_v + Fmoist_v + W heel1= 142.9 kN/m
TOE
(Note the unfactored base pressure result diagram shown above can be obtained from the calculation by un-ticking the
‘Calculate net ultimate bearing capacity’ option in Soil Details)
Vertical Loads
Weight of toe; W toe = ltoe × tbase ×gbase = 17.50 kN/m
Weight of soil in front of wall; W soil_f = ltoe ×dcover ´ gb = 40.00 kN/m
Resulting Moments
Moment due to toe weight; Mtoe_swt = W toe × ltoe / 2 = 17.50 kNm/m
Moment due to soil in front of wall; Msoil_f = W soil_f × ltoe/2 = 40 kNm/m
Toe serviceability bending moment ; Mdes_tc1 = Mtoe_p - (Mtoe_swt + Msoil_f ) = 33.28 kNm/m; (33.3) P
Heel Design Forces at face of stem:
heel length; lheel = 1500 mm
base pressure at toe/stem interface; qh_s = qh - lheel ´ mp= 64.44 kN/m2
Shear at stem due to base pressure; Vheel_p = (qh_s + qh)´ lheel /2 = 109.38 kN/m
Distance to centroid of this pressure area; xh = lheel - [(2´ qh_s + qh)/( qh_s + qh)]´ lheel/3 = 779 mm
Moment at stem due to base pressure; Mheel_p = Vheel_p × xh = 85.22 kNm/m
Vertical Loads
Surcharge load; Fsur_v = 15 kN/m;
Saturated retained soil; Fsat_v = 32 kN/m
Water; Fwater_v = 25.8 kN/m;
Moist retained soil; Fmoist_v = 52.5 kN/m
Weight of heel; W heel1 = lheel × tbase ×gbase = 13.125 kN/m
Total Weight surchage, soil & heel; W total1 = Fsur_v + Fsat_v + Fwater_v + Fmoist_v + W heel1= 138.4 kN/m
Heel serviceability bending moment; Mdes_hc1 = abs(Mheel_p – Mtotal1) = 14.06 kNm/m; (14.1) P