JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD - A41

Item: Analyzer House

A10-AS-5979
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-09- Dimension
201 Lifting and Mounting Details
Equipment Layout
Canopy
Labeling and Tagging
Cable Routing and Tie-in
Piping/Tubing Routing and Tie-in
Headers
Wall thickness of piping and tubing
Material Check
Tubing / ANSG261-09- Leak Check - D9
Piping 201 Headers
Sampling Systems
Random flushing piping and tubing
Electrical ANSG261-09- Continuity and Insulation - √
201 230VAC / 400VAC PDB √
Distribution Board and size of breaker √
All Wiring Integrity for The Circuit √
"Open" or "Close" In the Wires (Pairs) √
Continuity Less than 100 ohm √
500V Insulation Test Between cores √
Junction Box (Power and Signal) - √
Wiring √
Color Code and Core label √
Cable Gland √
Spare Terminal √
Alarm Panel - √
Wiring √
Color Code and Core label √
Cable Gland √
Spare Terminal √
Functional ANSG261-09- HVAC
201 Lightings/ Emergency Lightings
House Safety System
Detectors (Smoke, H2, O2, CO)
Switches (Press, Temp)
Beacons
Horns

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 196/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD - A42

Item: Probe

A10-AE-5979
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-00- Dimension
003 Labeling and Tagging
Tie-in Connection
Verify indicator for flow direction
Flange Size

A10-AE-5980A
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-00- Dimension
003 Labeling and Tagging
Tie-in Connection
Verify indicator for flow direction
Flange Size

A10-AE-5980B
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-00- Dimension
003 Labeling and Tagging
Tie-in Connection
Verify indicator for flow direction
Flange Size

A10-AE-5980C
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-00- Dimension
003 Labeling and Tagging
Tie-in Connection
Verify indicator for flow direction
Flange Size

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 197/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD -A43

Item: Sample Pre-Conditioning System

A10-PCS-5979
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-09- Dimension
301 Labelling and Tagging
Tie-in Connection
Tubing ANSG261-09- Leak Check D9
301
Electrical ANSG261-09- Continuity and Insulation - √
301 Signal √
Heater √
Functional ANSG261-09- Heater
301 Pressure Regulator
Pressure Indicator
Solenoid Valve
Filter

A10-PCS-5980A
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-09- Dimension
301 Labelling and Tagging
Tie-in Connection
Tubing ANSG261-09- Leak Check D9
301
Electrical ANSG261-09- Continuity and Insulation - √
301 Signal √
Heater √
Functional ANSG261-09- Heater
301 Pressure Regulator
Pressure Indicator
Solenoid Valve
Filter

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 198/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD - A43

Item: Sample Pre-Conditioning System

A10-PCS-5980B
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-09- Dimension
301 Labelling and Tagging
Tie-in Connection
Tubing ANSG261-09- Leak Check D9
301
Electrical ANSG261-09- Continuity and Insulation - √
301 Signal √
Heater √
Functional ANSG261-09- Heater
301 Pressure Regulator
Pressure Indicator
Solenoid Valve
Filter

A10-PCS-5980C
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-09- Dimension
301 Labelling and Tagging
Tie-in Connection
Tubing ANSG261-09- Leak Check
301
Electrical ANSG261-09- Continuity and Insulation - D9 √
301 Signal √
Heater √
Functional ANSG261-09- Heater
301 Pressure Regulator
Pressure Indicator
Solenoid Valve
Filter

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 199/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD - A44

Item: Sample Conditioning System

A10-SCS-5979
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-09- Dimension
301 Labeling and Tagging
Tie-in Connection
Routing
Insulation
Isolation and Drain Valves
Filters (Sample, Strainer)
Pressure regulator
Pressure gauge
Flow meter
Check valve
Lab take off sample
Tube ferrules and smooth of cutting
Temperature gauge
Switch valve
Relief valve
Tubing ANSG261-09- Leak Check D9
301 Flushing pipe and Tube
Electrical ANSG261-09- Continuity and Insulation -
301 JB - Power
JB - Signal
Grounding
Terminal connection and wire mark
Cable gland
Functional ANSG261-09- Indicators (Press, Flow, Temp)
301 Valves (Switching, Solenoid, Relief)
Switches (Press, Temp, Flow)
Press Regulators
Heat Exchanger (Heater, Cooler)
Heater
Sample Pump

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 200/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD - A44

Item: Sample Conditioning System

A10-SCS-5980A
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-09- Dimension
301 Labeling and Tagging
Tie-in Connection
Routing
Insulation
Isolation and Drain Valves
Filters (Sample, Strainer)
Pressure regulator
Pressure gauge
Flow meter
Check valve
Lab take off sample
Tube ferrules and smooth of cutting
Temperature gauge
Switch valve
Relief valve
Tubing ANSG261-09- Leak Check D9
301 Flushing pipe and Tube
Electrical ANSG261-09- Continuity and Insulation -
301 JB - Power
JB - Signal
Grounding
Terminal connection and wire mark
Cable gland
Functional ANSG261-09- Indicators (Press, Flow, Temp)
301 Valves (Switching, Solenoid, Relief)
Switches (Press, Temp, Flow)
Press Regulators
Heat Exchanger (Heater, Cooler)
Heater
Sample Pump

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 201/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD - A44

Item: Sample Conditioning System

A10-SCS-5980B
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-09- Dimension
301 Labeling and Tagging
Tie-in Connection
Routing
Insulation
Isolation and Drain Valves
Filters (Sample, Strainer)
Pressure regulator
Pressure gauge
Flow meter
Check valve
Lab take off sample
Tube ferrules and smooth of cutting
Temperature gauge
Switch valve
Relief valve
Tubing ANSG261-09- Leak Check D9
301 Flushing pipe and Tube
Electrical ANSG261-09- Continuity and Insulation -
301 JB - Power
JB - Signal
Grounding
Terminal connection and wire mark
Cable gland
Functional ANSG261-09- Indicators (Press, Flow, Temp)
301 Valves (Switching, Solenoid, Relief)
Switches (Press, Temp, Flow)
Press Regulators
Heat Exchanger (Heater, Cooler)
Heater
Sample Pump

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 202/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD - A44

Item: Sample Conditioning System

A10-SCS-5980C
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-09- Dimension
301 Labeling and Tagging
Tie-in Connection
Routing
Insulation
Isolation and Drain Valves
Filters (Sample, Strainer)
Pressure regulator
Pressure gauge
Flow meter
Check valve
Lab take off sample
Tube ferrules and smooth of cutting
Temperature gauge
Switch valve
Relief valve
Tubing ANSG261-09- Leak Check D9
301 Flushing pipe and Tube
Electrical ANSG261-09- Continuity and Insulation -
301 JB - Power
JB - Signal
Grounding
Terminal connection and wire mark
Cable gland
Functional ANSG261-09- Indicators (Press, Flow, Temp)
301 Valves (Switching, Solenoid, Relief)
Switches (Press, Temp, Flow)
Press Regulators
Heat Exchanger (Heater, Cooler)
Heater
Sample Pump

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 203/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD - A45

Item: Analyzer

A10-AT-5979
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-09- Labeling and Tagging
301 Isolation Switch
Isolation Valves
Cable Gland
Functional ANSG261-09- Calibration B33
301 Accuracy
Analog Input
Analog Output
Digital Input
Digital Output
Communication - PC (Analyzer Software)
Communication - DCS (Modscan)

A10-AT-5980A
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-09- Labeling and Tagging
301 Isolation Switch
Isolation Valves
Cable Gland
Functional ANSG261-09- Calibration B34
301 Accuracy
Analog Input
Analog Output
Digital Input
Digital Output
Communication - PC (Analyzer Software)
Communication - DCS (Modscan)

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 204/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD - A45

Item: Analyzer

A10-AT-5980B
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-09- Labeling and Tagging
301 Isolation Switch
Isolation Valves
Cable Gland
Functional ANSG261-09- Calibration B35
301 Accuracy
Analog Input
Analog Output
Digital Input
Digital Output
Communication - PC (Analyzer Software)
Communication - DCS (Modscan)

A10-AT-5980C
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-09- Labeling and Tagging
301 Isolation Switch
Isolation Valves
Cable Gland
Functional ANSG261-09- Calibration B36
301 Accuracy
Analog Input
Analog Output
Digital Input
Digital Output
Communication - PC (Analyzer Software)
Communication - DCS (Modscan)

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 205/240
JAZAN IGCC OXYGEN PACKAGE

ANALYZER CALIBRATION REPORT - B33

Make.: SERVOMEX Model: OXY1900

Tag: A10-AT-5979 Serial:

Range: 0-5 Vol% ( O2 ) Job No.: ANSG-261

Accuracy: ±1% full scale

Standard Measured Standard Measured Output


% error at range
(Vol%) (Vol%) Output (mA) (mA)

PC Communication ( )
DCS Communication ( )
AO Output ( )
DO Output ( )
Digital Input ( )

Standard Gas/Liquid information:


Supplier: LAB File:

Notes:

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 206/240
JAZAN IGCC OXYGEN PACKAGE

ANALYZER CALIBRATION REPORT - B34

Make.: SERVOMEX Model: OXY1900

Tag: A10-AT-5980A Serial:

Range: 0-5 Vol% ( O2 ) Job No.: ANSG-261

Accuracy: ±1% full scale

Standard Measured Standard Measured Output


% error at range
(Vol%) (Vol%) Output (mA) (mA)

PC Communication ( )
DCS Communication ( )
AO Output ( )
DO Output ( )
Digital Input ( )

Standard Gas/Liquid information:


Supplier: LAB File:

Notes:

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 207/240
JAZAN IGCC OXYGEN PACKAGE

ANALYZER CALIBRATION REPORT - B35

Make.: SERVOMEX Model: OXY1900

Tag: A10-AT-5980B Serial:

Range: 0-5 Vol% ( O2 ) Job No.: ANSG-261

Accuracy: ±1% full scale

Standard Measured Standard Measured Output


% error at range
(Vol%) (Vol%) Output (mA) (mA)

PC Communication ( )
DCS Communication ( )
AO Output ( )
DO Output ( )
Digital Input ( )

Standard Gas/Liquid information:


Supplier: LAB File:

Notes:

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 208/240
JAZAN IGCC OXYGEN PACKAGE

ANALYZER CALIBRATION REPORT - B36

Make.: SERVOMEX Model: OXY1900

Tag: A10-AT-5980C Serial:

Range: 0-5 Vol% ( O2 ) Job No.: ANSG 261

Accuracy: ±1% full scale

Standard Measured Standard Measured Output


% error at range
(Vol%) (Vol%) Output (mA) (mA)

PC Communication ( )
DCS Communication ( )
AO Output ( )
DO Output ( )
Digital Input ( )

Standard Gas/Liquid information:


Supplier: LAB File:

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 209/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD - C33

Item: Network Panel

A10-NCP-5984
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-09- Dimension
402 Lifting and Mounting Details
Equipment Layout
Labeling and Tagging
Wiring Routing and Tie-in Connections
Electrical ANSG261-09- Continuity and Insulation -
402 110VAC Power Supply (MCBs)
Analog/ Digital terminal Block
Functional ANSG261-09- Circuit Breaker
402 FCJ Gateway
RS232 to RS485 Converter
Patch Panel
Ethernet/ Fiber Optic hub
Thermostat (Temperature Alarm)
Power Supply units

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 210/240
JAZAN IGCC OXYGEN PACKAGE

DETECTOR CALIBRATION REPORT -C34

Tag: A10-AT-9516E Serial:


Type: OXYGEN DETECTOR Model: DM-700-02
Range: 0-25% Job No.: ANSG261

Standard Measured Standard Measured Output


Result
( % ) ( % ) Output (mA) (mA)

PASS / FAIL

PASS / FAIL

Tag: Serial:
Type: Model:
Range: Job No.:

Standard Standard Standard Measured Output


Result
( ) ( ) Output (mA) (mA)

PASS / FAIL

PASS / FAIL

Tag: Serial:
Type: Model:
Range: Job No.:

Standard Standard Standard Measured Output


Result
( ) ( ) Output (mA) (mA)

PASS / FAIL

PASS / FAIL

Tag: Serial:
Type: Model:
Range: Job No.:

Standard Standard Standard Measured Output


Result
( ) ( ) Output (mA) (mA)

PASS / FAIL

PASS / FAIL

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 211/240
JAZAN IGCC OXYGEN PACKAGE

F&G FUNCTIONAL TEST REPORT -C35

Job No.: ANSG 261 Drawing No.:

Analyzer House No : A10-AS-5979

Tag No Type Result Remark

A10-AT-9516E OXYGEN DETECTOR PASS / FAIL

A10-AL-9516C BEACON WHITE PASS / FAIL

A10-AL-9516D BEACON YELLOW PASS / FAIL

A10-XA-9516A HORN 1 PASS / FAIL

A10-XA-9516B HORN 2 PASS / FAIL

DIFFERNETIAL
A10-PSL-5001 PASS / FAIL
PRESSURE SWITCH
TEMPERATURE
A10-TSH-5001 PASS / FAIL
SWITCH

A10-XA-5918I MAIN DOOR SWITCH PASS / FAIL

EMERGENCY DOOR
A10-XA-5918J PASS / FAIL
SWITCH

PASS / FAIL

PASS / FAIL

PASS / FAIL

PASS / FAIL

PASS / FAIL

PASS / FAIL

PASS / FAIL

PASS / FAIL

PASS / FAIL

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 212/240
JAZAN IGCC OXYGEN PACKAGE

HVAC TEST RECORD - C36

TAG: A10-HVAC-A/B-5979
Cause Effect Check
1.Manual - HVAC A
System Switch - MANUAL
System Switch - Duty HVAC A
Start HVAC A HVAC A RUNNING-"On", Evaporator Fan On,
Compressor and Condensor Fan starts.
Ventilation Low HVAC A RUNNING-"Off", HVAC A Low Flow
FAULT-"On", Evaporator Fan, Compressor and
Condensor Fan stops.
Common Fault HVAC A RUNNING-"Off", HVAC A FAULT-
"On", Evaporator Fan, Compressor and
Condensor Fan stops.

2.Manual - HVAC B
System Switch - MANUAL
System Switch - Duty HVAC B
Start HVAC B HVAC B RUNNING-"On", Evaporator Fan On,
Compressor and Condensor Fan starts.
Ventilation Low HVAC B RUNNING-"Off", HVAC B Low Flow
FAULT-"On", Evaporator Fan, Compressor and
Condensor Fan stops.
HVAC Common Fault HVAC B RUNNING-"Off", HVAC B FAULT-
"On", Evaporator Fan, Compressor and
Condensor Fan stops.

3.Auto - HVAC A
System Switch - AUTO
System Switch - Duty HVAC A
Start HVAC A HVAC A RUNNING-"On", Evaporator Fan On,
Compressor and Condensor Fan starts.
Ventilation Low HVAC A RUNNING-"Off", HVAC A Low Flow
FAULT-"On", Evaporator Fan, Compressor and
Condensor Fan stops. HVAC B Starts.
Common Fault HVAC A RUNNING-"Off", HVAC A FAULT-
"On", Evaporator Fan, Compressor and
Condensor Fan stops. HVAC B Starts.

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 213/240
JAZAN IGCC OXYGEN PACKAGE

HVAC TEST RECORD - C36

TAG: A10-HVAC-A/B-5979
Cause Effect Check

4.Auto - HVAC B
System Switch - AUTO
System Switch - Duty HVAC B
Start HVAC B HVAC B RUNNING-"On", Evaporator Fan On,
Compressor and Condensor Fan starts.
Ventilation Low HVAC B RUNNING-"Off", HVAC B Low flow
FAULT-"On", Evaporator Fan, Compressor and
Condensor Fan stops. HVAC A Starts.
HVAC Common Fault HVAC B RUNNING-"Off", HVAC B FAULT-
"On", Evaporator Fan, Compressor and
Condensor Fan stops. HVAC A Starts.

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 214/240
JAZAN IGCC OXYGEN PACKAGE

HVAC TEST RECORD - C36

TAG: A10-HVAC-A/B-5979
Cause Effect Check
House Press > 25 Pa (0.1 In.WC)
Air Change > 8 Volume /Hr

5.Alarm Section
PLC input
Main Entrance Door Alarm to PLC Input
Differential Pressure SW Alarm to PLC Input
Temperature SW Alarm to PLC Input
Pressure Sw HVAC 1 Alarm to PLC Input
Pressure Sw HVAC 2 Alarm to PLC Input

Output Beacon
Trip receptacle
HVAC Low flow alarm Red Lamp
HVAC Common Fault alarm Red Lamp

6.Digital Input
- HVAC#A common fault Red Lamp
- HVAC#B common fault Red Lamp
- HVAC#A running status Green Lamp
- HVAC#B running status Green Lamp

7.Digital Output
HVAC #A Damper
HVAC #B Damper

Fresh Air Change : 8 Per Hour


House Indoor Volume (W x D x H) : 3500 x 3000 x 3000 = 31.50 m³
Total Air Change/Hr : 8 Times 31.50 m³ = 252 m³/hr
Fresh Air Intake Duct : 0.3 Dia = 0.07 m²
Actual Reading At Intake Duct > 0.99 m/s :HVAC A = m/s,HVACB = m/s

House Temperature ( 22°C < X < 26°C )

8.Roof Mounted Fan


Acitvated the Fan Observe Fan movement and house pressure

Note:
Put NA if not applicable
Checked By Witnessed By Approved By
YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 215/240
JAZAN IGCC OXYGEN PACKAGE

PIPING/TUBING TEST RECORD - D9

Job No.: ANSG-261 Drawing No.: ANSG261-09-301

TEST EQUIPMENT MAKE MODEL NO. SERIAL NO.

TEST PRESSURE TEST MEDIUM DURATION Checked


ITEM
(Barg) ( Air/ N2) (Minutes) (√)

Remarks:

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 216/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD - A46

Item: Analyzer House

A10-AS-5984
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-10- Dimension
201 Lifting and Mounting Details
Equipment Layout
Canopy
Labeling and Tagging
Cable Routing and Tie-in
Piping/Tubing Routing and Tie-in
Headers
Wall thickness of piping and tubing
Material Check
Tubing / ANSG261-10- Leak Check - D10
Piping 201 Headers
Sampling Systems
Random flushing piping and tubing
Electrical ANSG261-10- Continuity and Insulation - √
201 230VAC / 400VAC PDB √
Distribution Board and size of breaker √
All Wiring Integrity for The Circuit √
"Open" or "Close" In the Wires (Pairs) √
Continuity Less than 100 ohm √
500V Insulation Test Between cores √
Junction Box (Power and Signal) - √
Wiring √
Color Code and Core label √
Cable Gland √
Spare Terminal √
Alarm Panel - √
Wiring √
Color Code and Core label √
Cable Gland √
Spare Terminal √
Functional ANSG261-10- HVAC
201 Lightings/ Emergency Lightings
House Safety System
Detectors (Smoke, H2, O2, CO)
Switches (Press, Temp)
Beacons
Horns

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 217/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD - A47

Item: Probe

A10-AE-5984
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-00- Dimension
003 Labeling and Tagging
Tie-in Connection
Verify indicator for flow direction
Flange Size

A10-AE-5985A
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-00- Dimension
003 Labeling and Tagging
Tie-in Connection
Verify indicator for flow direction
Flange Size

A10-AE-5985B
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-00- Dimension
003 Labeling and Tagging
Tie-in Connection
Verify indicator for flow direction
Flange Size

A10-AE-5985C
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-00- Dimension
003 Labeling and Tagging
Tie-in Connection
Verify indicator for flow direction
Flange Size

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 218/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD - A48

Item: Sample Pre-Conditioning System

A10-PCS-5979
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-10- Dimension
301 Labelling and Tagging
Tie-in Connection
Tubing ANSG261-10- Leak Check D10
301
Electrical ANSG261-10- Continuity and Insulation - √
301 Signal √
Heater √
Functional ANSG261-10- Heater
301 Pressure Regulator
Pressure Indicator
Solenoid Valve
Filter

A10-PCS-5980A
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-10- Dimension
301 Labelling and Tagging
Tie-in Connection
Tubing ANSG261-10- Leak Check D10
301
Electrical ANSG261-10- Continuity and Insulation - √
301 Signal √
Heater √
Functional ANSG261-10- Heater
301 Pressure Regulator
Pressure Indicator
Solenoid Valve
Filter

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 219/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD

Item: Sample Pre-Conditioning System

A10-PCS-5980B
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-10- Dimension
301 Labelling and Tagging
Tie-in Connection
Tubing ANSG261-10- Leak Check D10
301
Electrical ANSG261-10- Continuity and Insulation - √
301 Signal √
Heater √
Functional ANSG261-10- Heater
301 Pressure Regulator
Pressure Indicator
Solenoid Valve
Filter

A10-PCS-5980C
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-10- Dimension
301 Labelling and Tagging
Tie-in Connection
Tubing ANSG261-10- Leak Check D10
301
Electrical ANSG261-10- Continuity and Insulation - √
301 Signal √
Heater √
Functional ANSG261-10- Heater
301 Pressure Regulator
Pressure Indicator
Solenoid Valve
Filter

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 220/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD - A49

Item: Sample Conditioning System

A10-SCS-5984
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-10- Dimension
301 Labeling and Tagging
Tie-in Connection
Routing
Insulation
Isolation and Drain Valves
Filters (Sample, Strainer)
Pressure regulator
Pressure gauge
Flow meter
Check valve
Lab take off sample
Tube ferrules and smooth of cutting
Temperature gauge
Switch valve
Relief valve
Tubing ANSG261-10- Leak Check D10
301 Flushing pipe and Tube
Electrical ANSG261-10- Continuity and Insulation -
301 JB - Power
JB - Signal
Grounding
Terminal connection and wire mark
Cable gland
Functional ANSG261-10- Indicators (Press, Flow, Temp)
301 Valves (Switching, Solenoid, Relief)
Switches (Press, Temp, Flow)
Press Regulators
Heat Exchanger (Heater, Cooler)
Heater
Sample Pump

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 221/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD - A49

Item: Sample Conditioning System

A10-SCS-5985A
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-10- Dimension
301 Labeling and Tagging
Tie-in Connection
Routing
Insulation
Isolation and Drain Valves
Filters (Sample, Strainer)
Pressure regulator
Pressure gauge
Flow meter
Check valve
Lab take off sample
Tube ferrules and smooth of cutting
Temperature gauge
Switch valve
Relief valve
Tubing ANSG261-10- Leak Check D10
301 Flushing pipe and Tube
Electrical ANSG261-10- Continuity and Insulation -
301 JB - Power
JB - Signal
Grounding
Terminal connection and wire mark
Cable gland
Functional ANSG261-10- Indicators (Press, Flow, Temp)
301 Valves (Switching, Solenoid, Relief)
Switches (Press, Temp, Flow)
Press Regulators
Heat Exchanger (Heater, Cooler)
Heater
Sample Pump

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 222/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD - A49

Item: Sample Conditioning System

A10-SCS-5985B
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-10- Dimension
301 Labeling and Tagging
Tie-in Connection
Routing
Insulation
Isolation and Drain Valves
Filters (Sample, Strainer)
Pressure regulator
Pressure gauge
Flow meter
Check valve
Lab take off sample
Tube ferrules and smooth of cutting
Temperature gauge
Switch valve
Relief valve
Tubing ANSG261-10- Leak Check D10
301 Flushing pipe and Tube
Electrical ANSG261-10- Continuity and Insulation -
301 JB - Power
JB - Signal
Grounding
Terminal connection and wire mark
Cable gland
Functional ANSG261-10- Indicators (Press, Flow, Temp)
301 Valves (Switching, Solenoid, Relief)
Switches (Press, Temp, Flow)
Press Regulators
Heat Exchanger (Heater, Cooler)
Heater
Sample Pump

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 223/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD - A49

Item: Sample Conditioning System

A10-SCS-5985C
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-10- Dimension
301 Labeling and Tagging
Tie-in Connection
Routing
Insulation
Isolation and Drain Valves
Filters (Sample, Strainer)
Pressure regulator
Pressure gauge
Flow meter
Check valve
Lab take off sample
Tube ferrules and smooth of cutting
Temperature gauge
Switch valve
Relief valve
Tubing ANSG261-10- Leak Check D10
301 Flushing pipe and Tube
Electrical ANSG261-10- Continuity and Insulation -
301 JB - Power
JB - Signal
Grounding
Terminal connection and wire mark
Cable gland
Functional ANSG261-10- Indicators (Press, Flow, Temp)
301 Valves (Switching, Solenoid, Relief)
Switches (Press, Temp, Flow)
Press Regulators
Heat Exchanger (Heater, Cooler)
Heater
Sample Pump

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 224/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD - A50

Item: Analyzer

A10-AT-4984
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-10- Labeling and Tagging
301 Isolation Switch
Isolation Valves
Cable Gland
Functional ANSG261-10- Calibration B37
301 Accuracy
Analog Input
Analog Output
Digital Input
Digital Output
Communication - PC (Analyzer Software)
Communication - DCS (Modscan)

A10-AT-4985A
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-10- Labeling and Tagging
301 Isolation Switch
Isolation Valves
Cable Gland
Functional ANSG261-10- Calibration B38
301 Accuracy
Analog Input
Analog Output
Digital Input
Digital Output
Communication - PC (Analyzer Software)
Communication - DCS (Modscan)

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 225/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD - A50

Item: Analyzer

A10-AT-4985B
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-10- Labeling and Tagging
301 Isolation Switch
Isolation Valves
Cable Gland
Functional ANSG261-10- Calibration B39
301 Accuracy
Analog Input
Analog Output
Digital Input
Digital Output
Communication - PC (Analyzer Software)
Communication - DCS (Modscan)

A10-AT-4985C
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-10- Labeling and Tagging
301 Isolation Switch
Isolation Valves
Cable Gland
Functional ANSG261-10- Calibration B40
301 Accuracy
Analog Input
Analog Output
Digital Input
Digital Output
Communication - PC (Analyzer Software)
Communication - DCS (Modscan)

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 226/240
JAZAN IGCC OXYGEN PACKAGE

ANALYZER CALIBRATION REPORT - B37

Make.: SERVOMEX Model: OXY1900

Tag: A10-AT-5984 Serial:

Range: 0-5 Vol% ( O2 ) Job No.: ANSG-261

Accuracy: ±1% full scale

Standard Measured Standard Measured Output


% error at range
(Vol%) (Vol%) Output (mA) (mA)

PC Communication ( )
DCS Communication ( )
AO Output ( )
DO Output ( )
Digital Input ( )

Standard Gas/Liquid information:


Supplier: LAB File:

Notes:

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 227/240
JAZAN IGCC OXYGEN PACKAGE

ANALYZER CALIBRATION REPORT - B38

Make.: SERVOMEX Model: OXY1900

Tag: A10-AT-5985A Serial:

Range: 0-5 Vol% ( O2 ) Job No.: ANSG-261

Accuracy: ±1% full scale

Standard Measured Standard Measured Output


% error at range
(Vol%) (Vol%) Output (mA) (mA)

PC Communication ( )
DCS Communication ( )
AO Output ( )
DO Output ( )
Digital Input ( )

Standard Gas/Liquid information:


Supplier: LAB File:

Notes:

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 228/240
JAZAN IGCC OXYGEN PACKAGE

ANALYZER CALIBRATION REPORT - B39

Make.: SERVOMEX Model: OXY1900

Tag: A10-AT-5985B Serial:

Range: 0-5 Vol% ( O2 ) Job No.: ANSG-261

Accuracy: ±1% full scale

Standard Measured Standard Measured Output


% error at range
(Vol%) (Vol%) Output (mA) (mA)

PC Communication ( )
DCS Communication ( )
AO Output ( )
DO Output ( )
Digital Input ( )

Standard Gas/Liquid information:


Supplier: LAB File:

Notes:

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 229/240
JAZAN IGCC OXYGEN PACKAGE

ANALYZER CALIBRATION REPORT - B40

Make.: SERVOMEX Model: OXY1900

Tag: A10-AT-5985C Serial:

Range: 0-5 Vol% ( O2 ) Job No.: ANSG 261

Accuracy: ±1% full scale

Standard Measured Standard Measured Output


% error at range
(Vol%) (Vol%) Output (mA) (mA)

PC Communication ( )
DCS Communication ( )
AO Output ( )
DO Output ( )
Digital Input ( )

Standard Gas/Liquid information:


Supplier: LAB File:

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 230/240
JAZAN IGCC OXYGEN PACKAGE

SAT INSPECTION TEST RECORD - C37

Item: Network Panel

A10-NCP-5984
Test Drawing No Item Attached Checked Result
Record YES N.A PASS FAIL
Visual ANSG261-10- Dimension
402 Lifting and Mounting Details
Equipment Layout
Labeling and Tagging
Wiring Routing and Tie-in Connections
Electrical ANSG261-10- Continuity and Insulation -
402 110VAC Power Supply (MCBs)
Analog/ Digital terminal Block
Functional ANSG261-10- Circuit Breaker
402 FCJ Gateway
RS232 to RS485 Converter
Patch Panel
Ethernet/ Fiber Optic hub
Thermostat (Temperature Alarm)
Power Supply units

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 231/240
JAZAN IGCC OXYGEN PACKAGE

DETECTOR CALIBRATION REPORT -C38

Tag: A10-AT-9526E Serial:


Type: OXYGEN DETECTOR Model: DM-700-02
Range: 0-25% Job No.: ANSG261

Standard Measured Standard Measured Output


Result
( ) ( ) Output (mA) (mA)

PASS / FAIL

PASS / FAIL

Tag: Serial:
Type: Model:
Range: Job No.:

Standard Standard Standard Measured Output


Result
( ) ( ) Output (mA) (mA)

PASS / FAIL

PASS / FAIL

Tag: Serial:
Type: Model:
Range: Job No.:

Standard Standard Standard Measured Output


Result
( ) ( ) Output (mA) (mA)

PASS / FAIL

PASS / FAIL

Tag: Serial:
Type: Model:
Range: Job No.:

Standard Standard Standard Measured Output


Result
( ) ( ) Output (mA) (mA)

PASS / FAIL

PASS / FAIL

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 232/240
JAZAN IGCC OXYGEN PACKAGE

F&G FUNCTIONAL TEST REPORT -C39

Job No.: ANSG 261 Drawing No.:

Analyzer House No : A10-AS-5984

Tag No Type Result Remark

A10-AT-9526E OXYGEN DETECTOR PASS / FAIL

A10-AL-9526C BEACON WHITE PASS / FAIL

A10-AL-9526D BEACON YELLOW PASS / FAIL

A10-XA-9526A HORN 1 PASS / FAIL

A10-XA-9526B HORN 2 PASS / FAIL

DIFFERNETIAL
A10-PSL-5101 PASS / FAIL
PRESSURE SWITCH
TEMPERATURE
A10-TSH-5101 PASS / FAIL
SWITCH

A10-XA-5928I MAIN DOOR SWITCH PASS / FAIL

EMERGENCY DOOR
A10-XA-5928J PASS / FAIL
SWITCH

PASS / FAIL

PASS / FAIL

PASS / FAIL

PASS / FAIL

PASS / FAIL

PASS / FAIL

PASS / FAIL

PASS / FAIL

PASS / FAIL

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 233/240
JAZAN IGCC OXYGEN PACKAGE

HVAC TEST RECORD - C40

TAG: A10-HVAC-A/B-5984
Cause Effect Check
1.Manual - HVAC A
System Switch - MANUAL
System Switch - Duty HVAC A
Start HVAC A HVAC A RUNNING-"On", Evaporator Fan On,
Compressor and Condensor Fan starts.
Ventilation Low HVAC A RUNNING-"Off", HVAC A Low Flow
FAULT-"On", Evaporator Fan, Compressor and
Condensor Fan stops.
Common Fault HVAC A RUNNING-"Off", HVAC A FAULT-
"On", Evaporator Fan, Compressor and
Condensor Fan stops.

2.Manual - HVAC B
System Switch - MANUAL
System Switch - Duty HVAC B
Start HVAC B HVAC B RUNNING-"On", Evaporator Fan On,
Compressor and Condensor Fan starts.
Ventilation Low HVAC B RUNNING-"Off", HVAC B Low Flow
FAULT-"On", Evaporator Fan, Compressor and
Condensor Fan stops.
HVAC Common Fault HVAC B RUNNING-"Off", HVAC B FAULT-
"On", Evaporator Fan, Compressor and
Condensor Fan stops.

3.Auto - HVAC A
System Switch - AUTO
System Switch - Duty HVAC A
Start HVAC A HVAC A RUNNING-"On", Evaporator Fan On,
Compressor and Condensor Fan starts.
Ventilation Low HVAC A RUNNING-"Off", HVAC A Low Flow
FAULT-"On", Evaporator Fan, Compressor and
Condensor Fan stops. HVAC B Starts.
Common Fault HVAC A RUNNING-"Off", HVAC A FAULT-
"On", Evaporator Fan, Compressor and
Condensor Fan stops. HVAC B Starts.

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 234/240
JAZAN IGCC OXYGEN PACKAGE

HVAC TEST RECORD - C40

TAG:A10-HVAC-A/B-5984
Cause Effect Check

4.Auto - HVAC B
System Switch - AUTO
System Switch - Duty HVAC B
Start HVAC B HVAC B RUNNING-"On", Evaporator Fan On,
Compressor and Condensor Fan starts.
Ventilation Low HVAC B RUNNING-"Off", HVAC B Low Flow
FAULT-"On", Evaporator Fan, Compressor and
Condensor Fan stops. HVAC A Starts.
HVAC Common Fault HVAC B RUNNING-"Off", HVAC B FAULT-
"On", Evaporator Fan, Compressor and
Condensor Fan stops. HVAC A Starts.

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 235/240
JAZAN IGCC OXYGEN PACKAGE

HVAC TEST RECORD - C40

TAG: A10-HVAC-A/B-5984
Cause Effect Check
House Press > 25 Pa (0.1 In.WC)
Air Change > 8 Volume /Hr

5.Alarm Section
PLC input
Main Entrance Door Alarm to PLC Input
Differential Pressure SW Alarm to PLC Input
Temperature SW Alarm to PLC Input
Pressure Sw HVAC 1 Alarm to PLC Input
Pressure Sw HVAC 2 Alarm to PLC Input

Output Beacon
Trip receptacle
HVAC Low flow alarm Red Lamp
HVAC Common Fault alarm Red Lamp

6.Digital Input
- HVAC#A common fault Red Lamp
- HVAC#B common fault Red Lamp
- HVAC#A running status Green Lamp
- HVAC#B running status Green Lamp

7.Digital Output
HVAC #A Damper
HVAC #B Damper

Fresh Air Change : 8 Per Hour


House Indoor Volume (W x D x H) : 3500 x 3000 x 3000 = 31.50 m³
Total Air Change/Hr : 8 Times 31.50 m³ = 252 m³/hr
Fresh Air Intake Duct : 0.3 Dia = 0.07 m²
Actual Reading At Intake Duct > 0.99 m/s :HVAC A = m/s,HVACB = m/s

House Temperature ( 22°C < X < 26°C )

8.Roof Mounted Fan


Acitvated the Fan Observe Fan movement and house pressure

Note:
Put NA if not applicable
Checked By Witnessed By Approved By
YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 236/240
JAZAN IGCC OXYGEN PACKAGE

PIPING/TUBING TEST RECORD - D10

Job No.: ANSG-261 Drawing No.: ANSG261-10-301

TEST EQUIPMENT MAKE MODEL NO. SERIAL NO.

TEST PRESSURE TEST MEDIUM DURATION Checked


ITEM
(Barg) ( Air/ N2) (Minutes) (√)

Remarks:

Checked By Witnessed By Approved By


YOKOGAWA SEPCO SAUDI ARAMCO
Name Name Name
Sign Sign Sign
Date Date Date
ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 237/240
JAZAN IGCC OXYGEN PACKAGE

5. SAT PUNCH LIST

Job No.: Date: Page No.:

ITEM CORRECTIVE ACTION / CAR No.(if COMPLETION DATE / SIGNATURE


DETAIL FAILURE DESCRIPTION DUE DATE
NO TECH. CLARIFICATION CAR is issued) YOKOGAWA (Customer) ARAMCO

ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 238/240


JAZAN IGCC OXYGEN PACKAGE

5. SAT PUNCH LIST

Job No.: Date: Page No.:

ITEM CORRECTIVE ACTION / CAR No.(if COMPLETION DATE / SIGNATURE


DETAIL FAILURE DESCRIPTION DUE DATE
NO TECH. CLARIFICATION CAR is issued) YOKOGAWA (Customer) ARAMCO

10

11

12

13

14

ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 239/240


JAZAN IGCC OXYGEN PACKAGE

6. SAT SIGN OFF

We hereby accept and provide notice that we have witnessed and inspected the listed equipment and

analyzers, and that it meets the Project Specifications in accordance with Purchase Order.

Purchase Order No: PO-PGB-OGAZ-0001

YEI Job No: ANSG 261

Project Name: JAZAN IGCC OXYGEN PACKAGE

Date:

Client End User


SEPCO SAUDI ARAMCO

Client (Name) End User (Name)

Vendor
YOKOGAWA ELECTRIC INTERNATIONAL PTE LTD

Vendor (Name)

ANSG261-00-916-RA SAT PROCEDURE AND RECORDS PAGE 240/240