You are on page 1of 11

Cable IR Test Report

Customer Plant Inspection Date

SHELL AVIATION SUKKUR AIRPORT 26 – Oct - 2022

Description Power Cable CAA Substation to Main Breaker DB

TESTING EQUIPMENT SPECIFICATION


Serial No. Test Instrument Type Test Voltage

02831358 DY3166 1000 V

INSULATION RESISTANCE TEST RESULTS


Phase to Phase (MΩ) Phase to Ground (MΩ)
Red-Yellow 350 Red-Ground 400
Red-Blue 350 Yellow-Ground 400
Yellow-Blue 350 Blue-Ground 400

Remarks IR Results of cable is normal.

SAS Corporation Shell Pakistan

Name: Waseem & Akhtar Name:

Designation: Supervisor & Electrician Designation:

Date: 26 – Oct – 2022 Date:

Signature: Signature:
Cable IR Test Report

Customer Plant Inspection Date

SHELL AVIATION SUKKUR AIRPORT 26 – Oct - 2022

Description Power Cable Main Breaker to Main DB

TESTING EQUIPMENT SPECIFICATION


Serial No. Test Instrument Type Test Voltage

02831358 DY3166 1000 V

INSULATION RESISTANCE TEST RESULTS


Phase to Phase (MΩ) Phase to Ground (MΩ)
Red-Yellow 100 Red-Ground 100
Red-Blue 100 Yellow-Ground 100
Yellow-Blue 100 Blue-Ground 100

Remarks The IR Result of Cable is Satisfactory.

SAS Corporation Shell Pakistan

Name: Waseem & Akhtar Name:

Designation: Supervisor & Electrician Designation:

Date: 26 – Oct – 2022 Date:

Signature: Signature:
Cable IR Test Report

Customer Plant Inspection Date

SHELL AVIATION SUKKUR AIRPORT 26 – Oct - 2022

Description Power Cable Generator to Change Over Breaker

TESTING EQUIPMENT SPECIFICATION


Serial No. Test Instrument Type Test Voltage

02831358 DY3166 1000 V

INSULATION RESISTANCE TEST RESULTS


Phase to Phase (MΩ) Phase to Ground (MΩ)
Red-Yellow 0.5 Red-Ground 0.7
Red-Blue 3 Yellow-Ground 0.7
Yellow-Blue 3 Blue-Ground 1.0
Red-Black 1.0

The IR Results are Unsatisfactory


Remarks
& cables needed to replaced.
Note: The Generator is Single Phase & used Red Core with Black Core, But Connected all Cores at
Change-Over-Panel & interconnected Blue & Yellow with Red Core.

SAS Corporation Shell Pakistan

Name: Waseem & Akhtar Name:

Designation: Supervisor & Electrician Designation:

Date: 26 – Oct – 2022 Date:

Signature: Signature:
Cable IR Test Report

Customer Plant Inspection Date

SHELL AVIATION SUKKUR AIRPORT 26 – Oct - 2022

Description Power Cable Change Over to Main LT

TESTING EQUIPMENT SPECIFICATION


Serial No. Test Instrument Type Test Voltage

02831358 DY3166 1000 V

INSULATION RESISTANCE TEST RESULTS


Phase to Phase (MΩ) Phase to Ground (MΩ)
Red-Yellow 70 Red-Ground 70
Red-Blue 70 Yellow-Ground 70
Yellow-Blue 70 Blue-Ground 70

Remarks The IR Results are Satisfactory.

SAS Corporation Shell Pakistan

Name: Waseem & Akhtar Name:

Designation: Supervisor & Electrician Designation:

Date: 26 – Oct – 2022 Date:

Signature: Signature:
Cable IR Test Report

Customer Plant Inspection Date

SHELL AVIATION SUKKUR AIRPORT 26 – Oct - 2022

Description Power Cable Main LT to MCC Panel

TESTING EQUIPMENT SPECIFICATION


Serial No. Test Instrument Type Test Voltage

02831358 DY3166 1000 V

INSULATION RESISTANCE TEST RESULTS


Phase to Phase (MΩ) Phase to Ground (MΩ)
Red-Yellow 300 Red-Ground 300
Red-Blue 270 Yellow-Ground 270
Yellow-Blue 270 Blue-Ground 20

Remarks IR Results are Satisfactlory.

SAS Corporation Shell Pakistan

Name: Waseem & Akhtar Name:

Designation: Supervisor & Electrician Designation:

Date: 26 – Oct – 2022 Date:

Signature: Signature:
Motor Cable IR Test Report

Customer Plant Inspection Date

SHELL AVIATION SUKKUR AIRPORT 26 – Oct - 2022

Description Motor Supply Cables (Υ/Δ) Loading Motor Report

TESTING EQUIPMENT SPECIFICATION


Serial No. Test Instrument Type Test Voltage

02831358 DY3166 1000 V

DECANTING MOTOR SPECIFICATIONS


Motor Type LPK Phases
1LA3-131-2AA90 5509750 3
Power Frame Size Make
7.5 HP 132 s Siemens Pakistan

INSULATION RESISTANCE TEST RESULTS


Red – Yellow Red – Blue Yellow – Blue
Cable # 1 200 250 350

Cable # 2 200 250 100

The IR Results are Satisfactory, Junction Box Fixing Bolt is


Remarks
missing.

SAS Corporation Shell Pakistan

Name: Waseem & Akhtar Name:

Designation: Supervisor & Electrician Designation:

Date: 26 – Oct – 2022 Date:

Signature: Signature:
Motor Cable IR Test Report

Customer Plant Inspection Date


SHELL AVIATION SUKKUR AIRPORT 26 – Oct - 2022

Description Motor Supply Cables (Υ/Δ) Decanting Motor Report

TESTING EQUIPMENT SPECIFICATION


Serial No. Test Instrument Type Test Voltage
02831358 DY3166 1000 V

INSULATION RESISTANCE TEST RESULTS


LOADING MOTOR (CABLE 1)
SPECIFICATIONS
Red – Yellow Motor Type Red – Blue LPK Yellow – Blue Phases
200 1LA3-131-2AA90 280 5509749 450 3
Results are Satisfactory
INSULATION
Power RESISTANCE TEST RESULTS
Frame(CABLE
Size 2) Make
Red – Yellow 7.5 HP Red – Blue 132 s Yellow – Blue Siemens Pakistan
300 400 800
Remarks

SAS Corporation Shell Pakistan

Name: Waseem & Akhtar Name:

Designation: Supervisor & Electrician Designation:

Date: 26 – Oct – 2022 Date:

Signature: Signature:

Motor IR Test Report

Customer Plant Inspection Date

SHELL AVIATION SUKKUR AIRPORT 26 – Oct - 2022

Description Motor Winding Loading Motor Report

TESTING EQUIPMENT SPECIFICATION


Serial No. Test Instrument Type Test Voltage
02831358 DY3166 1000 V

DECANTING MOTOR SPECIFICATIONS


Motor Type LPK Phases
1LA3-131-2AA90 5509750 3
Power Frame Size Make
7.5 HP 132 s Siemens Pakistan

INSULATION RESISTANCE TEST RESULTS


Red – Ground Red – Ground Yellow – Ground
Terminal 500
500 500
#1
Terminal 500
500 500
#2

The IR Results are Satisfactory, Junction Box Fixing Bolt is


Remarks
missing, but Thermistors are not present.

SAS Corporation Shell Pakistan

Name: Waseem & Akhtar Name:

Designation: Supervisor & Electrician Designation:

Date: 26 – Oct – 2022 Date:

Signature: Signature:

Motor IR Test Report

Customer Plant Inspection Date

SHELL AVIATION SUKKUR AIRPORT 26 – Oct - 2022

Description Motor Winding Decanting Motor Report

TESTING EQUIPMENT SPECIFICATION


Serial No. Test Instrument Type Test Voltage
02831358 DY3166 1000 V

DECANTING MOTOR SPECIFICATIONS


Motor Type LPK Phases
1LA3-131-2AA90 5509750 3
Power Frame Size Make
7.5 HP 132 s Siemens Pakistan

INSULATION RESISTANCE TEST RESULTS


Red – Ground Red – Ground Yellow – Ground
Terminal 1000
1000 1000
#1
Terminal 1000
1000 1000
#2

The IR Results are Satisfactory, but Thermistors are not


Remarks
present

SAS Corporation Shell Pakistan

Name: Waseem & Akhtar Name:

Designation: Supervisor & Electrician Designation:

Date: 26 – Oct – 2022 Date:

Signature: Signature:

Earthing Resistance Test Report

Customer Plant Inspection Date

SHELL AVIATION SUKKUR AIRPORT 26 – Oct - 2022

TESTING EQUIPMENT SPECIFICATION


Serial No. Test Equipment Type
0793697 A4102 KYORITSU
TEST RESULTS
S.
Location Resistance (Ω)
No.
1. Earthing Pit # 1 1.3
2. Tank # 1 0.4
3. Tank # 2 0.25
4. Loading Motor 0.3
5. Decanting Motor 1.4
6. Main DB 1.3
7. Level Alarm DB 1.3
8. Earthing Pit # 2 0.2
9. MCC Panel Bonding 0.3
10. Generator Earth Pit Not Constructed
11. Generator Bonding Not Connected
12 Tank Earthing Pit # 3 0.3
13 Main Breaker Panel 1.3
14 Change Over Panel 1.3
15 Earth Pit # 4 1.2
16 Lighting D.B. 1.2
17 Air Compressor 1.2
18 Water Pump 1.2

Results are Satisfactory, Generator Earth Pit to be


Remarks
constructed & Generator Bonding is to carried out.

SAS Corporation Shell Pakistan

Name: Waseem & Akhtar Name:

Designation: Supervisor & Electrician Designation:

Date: 26 – Oct – 2022 Date:

Signature: Signature:

You might also like