Shear wall thickness is calculated as follow:

Vu = 3442.0384 (Max pier force from ETABS)

Vu = ØVn NSCP 2015- Section 411.5.4.3

Vu=Ø (0.83 √ f ' c h d)

3442.0384(10)3 =(0.75)(0.83)( √ 28)(h)(0.8)(5 0 00)


h=261.23860044 ≈ 300 mm

Therefore, required thickness that can be use is at least 300 mm for shear wall.
Shear Wall Property

Property/Stiffness Modification Factors


Pier Labels

Shear wall Pier D/C Ratio

Shear wall Design in Reinforced Concrete Design is a variety of Eleven Piers. Displayed below are
the representatives from the group.

Pier 9 DCR
Design Overwrites

Shear wall - Pier 9

Uniform Reinforcing Assignment to Pier