You are on page 1of 17

ANNEXURE I

Brief Summary of project


Development of 4 lanes inter corridor (Green field alignment) from Amas( old NH-2/New NH-19)
to Shiwrampur under Bharatmala Pariyojana (Lot-5/Package-7) in state of Bihar Package-III
from Ramnagar (Ch. 00+000 to Kachchi Dargah (Ch.14+257)
Proposed Length – 14.257 Km

1.0 EXECUTIVE SUMMARY

Ministry of Road Transport and Highways, Government of India, has decided to


improve the efficiency of freight movement in India. National Highways Authority
of India (NHAI) has been entrusted for preparation of DPR to improve the road
networks in the state of Bihar.

In pursuance of the above M/s. SA Infrastructure has been appointed as


Consultant for preparation of DPR for "Construction of 4lane inter corridor
(Greenfield alignment) from Ramnagar to Kachchi Dargah under Bharatmala
Pariyojana(Lot-5,Pkg-7)Package-III (Km-0+000 to km-14.257) in state of Bihar."

This part of highway starts at Ramnagar to Kachchi Dargah from CH: 0+000 to
14.257(Ramnagar to Kachchi Dargah)in the state of Bihar. The length of the
proposed alignment is 14.257km approx.
This is a green field alignment, access control and is proposed for 4-6-Lane. The
main objective of the proposed project is to reduce the distance and travel time
from NH- 2 to NH-57 and North-Bihar to South Bihar and to give connectivity to
remote areas and major cities. The project lays emphasis on development of
these areas and makes them available with the resources.
The proposed access controlled highway project with new alignment has been
envisaged through an area which shall have the advantage of simultaneous
development as well as shall result in a shorter distance to travel. The junctions
with existing road will be planned in the form of interchanges and flyover to
ensure uninterrupted flow of traffic.

The proposed road would act as the prime artery for the economic flow to this
region. It will enhance economic development, provide employment opportunities
to locals, strengthen tourist development, ensure road safety, and provide better
transportation facilities and other facilities such as way side amenities. Vehicle
operating cost will also be reduced due to improved road quality. The
compensatory plantation and road side plantation shall further improve the air
quality of the region.
Development of 4 lanes inter corridor (Green field alignment) from Amas( old NH-2/New NH-19)
to Shiwrampur under Bharatmala Pariyojana (Lot-5/Package-7) in state of Bihar Package-III
from Ramnagar (Ch. 00+000 to Kachchi Dargah (Ch.14+257)
Proposed Length – 14.257 Km

SALIENT FEATURES OF THE PROJECT

Project name Development of 4lane inter corridor (Greenfield alignment)


from Ramnagar to Kachchi Dargah under Bharatmala
Pariyojana (Lot-5, Pkg-7) Package-III (Km-0+000 to km-
14.257) in state of Bihar."

Proposed Length – 14.257Km

Location The proposed highway starts from Ramnagar to Kachchi


Dargah.

Latitude & Longitude Start Location: 25°26'48.10"N, 85°12'35.16"E


End Location: 25°33'27.46"N, 85°15'29.58"E
Land use Agricultural land
Nearest railway
Stretch 1- Patna Ghat (approx. 3.5 Km, aerial)
station

Nearest Airport Stretch 1- Patna (Approx. 15.5 Km, aerial)

Seismic Zone The area falls under seismic zone III which is categorized as
severe intensity zone.(As per 1893:2002)
ANNEXURE II
Alignment Marked on Toposheet
ANNEXURE III
Analysis of Options
Details of Alternate Alignment Studyfor the Project Highway

Salient Features of Alignment Options


S.
Description Remarks(OPTION- 1) Remarks(OPTION-2) Remarks(OPTION-3)
No
Total Length
1 including 12.00 Kms. 14.257 Kms. 8.39 Kms.
spur
Length of
2 Existing 0.000Kms. 0.000 0.000km
Road

Length of
3
Green Field
12.00 Kms. 14.00 Kms. 8.39 Kms.

A. Length of this alignment is A. Length of this alignment is


short but connectivity with short but connectivity with
ring road is not proper. A. Will provide adequate ring road is not proper.
B. In this alignment length of B. In this alignment length of
Geometric design Speed
4
Features
Aurangabad-Darbhanga will Aurangabad-Darbhanga will
be increased. be increased.
ROAD B.Congestion frees Traffic
FEATURES C. If we follow this alignment C. If we follow this alignment
NH-30 Patna Bakhtiyarpur Movement inside City. NH-30 Patna Bakhtiyarpur will
will be widen. be widen.

Network
5
Connectivity
Ramnagar to KachhiDargah Ramnagar to KachhiDargah Ramnagar to KachhiDargah

6
Expected 18657 PCU (Preliminary Traffic 18657PCU. (Preliminary Traffic 18657 PCU (Preliminary Traffic
Traffic(PCU) estimates) estimates) estimates)

Land to be
7
Acquired
87.00 Ha (approx...) 99.00 Ha. (approx...) 65.34 Ha (approx...)
Cost of Land
8
Acquisition
715.33 Cr (approx.) (approx...) 814 Cr (approx...) 260.00 Cr (approx...)
Built-Up
9
section
18 no of building. 10 no of Building. 5 no of building.

Social and
Environmental

Protection of Loss in Agricultural Land. Loss in Agricultural Land.


Loss in Agricultural Land.
10 Flora and
Fauna

Trumpet/Fly-
11
Over
01 Nos. 01 Nos. 01 Nos.
Elevated
12
Structure
Nil Nil Nil
Major
13
Bridge
01 Nos. 01 Nos. 01 Nos.
Minor
14 Existing /
Bridge
09 Nos. 08 Nos. 09 Nos.
Proposed
15 Structure(s) VOP Nil Nil Nil
16 VUP 01 Nos. 01 Nos. 01 Nos.
17 LVUP 01 Nos. 01 Nos. 01 Nos.
18 SVUP 03 Nos. 04 Nos. 02 Nos.
19 ROB 00 Nos. 00 Nos. 00Nos.
· Traffic can move
without any hindrance. · Amount of Land required for
Traffic can move fast throughout
· Amount of Land Acquisition is more than other
as this is an almost straight
required for Acquisition two options, and consequently
Merit and alignment
20 Merits is more than other two total LA cost is higher than the
Demerits · Length of highway is shorter LA cost of other two options
options, and
than existing highway.
consequently total LA · Total civil cost is more than
cost is higher than the option -2.
LA cost.
· Land Acquisition · This option also has no
required throughout the spur connectivity to Gaya
· This option has no Spur
21 Demerits project stretch road.
connectivity to Gaya city
· Project cost is high then · Along existing road
other option. portion

Construction Cost of Road 192.00 Cr(Approx.)


22
Cost Work
224 Cr. (Approx.) 117.00 Cr(Approx.)
Cost of 45.05 Cr(Approx.)
Structure(s)
44.49 Cr (Approx.) 34.39 Cr (Approx.)
Total Civil
Cost 237.05 Cr.(Approx.) 268.49 Cr (Approx.) 151.15 Cr (Approx.)
23 Total Project 952.38 Cr. (Approx.) 1082.49 Cr. (Approx.) 411.15 Cr. (Approx.)
Cost/km
24 79.37 Cr/Km. 77.32 Cr /Km. 49.29 Cr/Km.

Based on the above study the following observations are there:-

Option 1 and 3 leads to more impact on structure and families as number affected families are high as compared to option 2.
If alignment option 1 or 3 is followed then it will leads to more impacts on Environment & Social components, hence Option 2
is followed.
The map showing alternatives site on Survey of India toposheet is given below:
Map showing 3 alternatives sites on Survey of India Toposheet

Ending of Opt-2

Ending of Opt-1

Starting of Opt-1, 2 and 3

Ending of Opt-3
Project Name: Construction of 4 lane inter corridor(Green Field Highway) from Amas NH 2 (new NH 19) to Bela Nawada (NH 57) under
Bharatmala Pariyojana (Lot-5, Package-7) in the state of Bihar - Package-1 from Amas (Ch. 0+000) to Shiwrampur (Ch. 55+002)

Option-1 Option-2 Option-3 Remark


Scoring Criteria Total Weightage
Score Score Score

Natural Environment 80 19 14 18

Biological Environment 80 6 5 6

Physical Environment 50 - - 0

Social Environment 60 31 20 23

Engineering 130 66 52 63

Total 400 122 91 110


Recommended

Score out of 360 Score Limit (%) Impact Category

Less than 120 <30 Low

30 – 50 Medium
120 to 200

200 to 320 50-80 High

More than 320 >80 Very High


Natural Environment
Total Weight Option-1 Option-2 Option-3
Attributes Scoring Criteria Score
of Attribute Score Score Score
Plains - 0
Rolling terrain - 5 10 0 0 0
Flood plains/coastal belt - 10
Upto 100% of Project Length 10
Upto 50% of Project Length 5
Hilly/mountainous terrain 10 0 0 0
Topography Upto 25% of Project Length 1
Nil 0
CRZ -I 10
CRZ -III 5
CRZ Area 10 0 0 0
CRZ -III/IV 1
Nil 0
Vulnerability to natural hazards (as earthquakes, Not prone to any Hazard - 0
floods, landslides, Tropical cyclone winds, storm Rare occurrence - 1
5 3 3 3
surges, tsunami or volcanic eruptions and climate Prone to natural disasters/risks - 3
changes etc.) Highly prone to natural disasters (regular occurrence) - 5
5 or less 1
Number (average) of water bodies per km (rivers, 6 to 10 2
Surface water resources canals, reservoirs, lakes and ponds) – Crossings as well 11 to 15 3 5 1 1 1
as water bodies within RoW. 16 to 20 4
21 or more 5
>1 ha. 10
Upto 0.5 ha. 5
Reservoir/Lake/Pomd 10 5 1 5
Upto 0.1 ha. 1
if No 0
Affected Surface Area of Water bodies
>3 ha. 10
Upto 1.5 ha. 5
Canal/River/Stream 10 5 5 5
Upto 0.3 ha. 1
if No 0
2 or less 1
3 to 4 2
Over-topping and/or water logging within RoW (average
Drainage Conditions 5 to 6 3 5 1 1 1
number of such instances per km)
6 to 7 4
7 or more 5
Available 1
Ground water resources Availablity/Grey/Black Grey 3 5 1 1 1
Black 5
Within 50 km 1
50 to 100 km 2
Materials Availability Availability of Boulder/Sand/Earth 5 2 1 1
100 to 200 km 3
More than 200 km 5
No Errosion 0
To some extent 1
Soil Erosion Is soil erosion an issue in/along the sub-project road? 5 1 1 1
Critical 3
Very critical 5
Total - 80 19 14 18
Biological Environment
Total Weight of Option-1 Option-2 Option-3
Attributes Scoring Criteria Score
Attribute Score Score Score
National Park - 10
Tiger Habitat - 10
Wildlife Sanctuary/Marine Sanctuary - 8
Protected Areas (PA) under
Conservation Reserve/Biosphere, Wetland - 6 10 0 0 0
Wildlife Conservation Act
Projects Falls within 10Km Boundary of PA/
- 2
Wildlife Corridor in other type of Forests Area
None - 0
upto 20 ha 1
upto 40ha 2
upto 50 ha 4
Reserved Forest 10 1 1 1
upto 60 ha 6
upt0100 ha 8
More than 100 ha 10
upto 20 ha 1
upto 40ha 2
upto 50 ha 4
Forests Area Protected Forest 10 1 1 1
upto 60 ha 6
upto 100 ha 8
More than 100 ha 10
upto 20 ha 1
Forest Type Area (FCA Applicable), Forest Type upto 40ha 2
Area (FCA Applicable), Governtment Land upto 50 ha 4
10 1 1 1
Notified under FCA Act as Protected Forest for upto 60 ha 6
Management Purpose upt0100 ha 8
More than 100 ha 10
Upto 100 Trees/Km 1
Upto 200 Trees/Km 2
Upto 300 Trees/Km 4
Felling of trees from forest area 10 1 1 1
Upto 400 Trees/Km 6
More than 500 Trees/Km 8
More than 1000 Trees/Km 10
Trees
50 Trees/Km 1
100 Trees/Km 2
Local Law applicable for felling of trees Non 200 Trees/Km 4
10 2 1 2
Forest Land Upto 300 Trees/ Km 6
Upto 400 Trees/ Km 8
More than 500 Trees/Km 10
No CRZ 0
upto 2 ha. 2
Area 10 0 0 0
upto 5ha 5
Mangroves More than 10 ha 10
upto 50 ha 2
No of Mangroves Upto 100 ha 5 10 0 0 0
More than 200 ha 10
Total - - - 80 6 5 6
Physical Environment
Total Weight of Option-1 Option-2 Option-3
Attributes Scoring Criteria Score
Attribute Score Score Score
More than Permissible limit i.e. 100 µg/m3 5
Respirable PM10 Upto 50 µg/m3 2 5 - - -
Upto 20 µg/m3 0
More than Permissible limit i.e. 60 µg/m3 5
Respirable PM 2.5 Upto 30 µg/m3 2 5 - - -
Upto 10 µg/m3 0
More than Permissible limit i.e. 80 µg/m3 5
Air Quality SO2/Nox Upto 40 µg/m3 2 5 - - -
Upto 20 µg/m3 0
More than Permissible limit i.e. 4000 µg/m3 5
CO (1 Hr. Monitoring) Upto 2000 µg/m3 2 5 - - -
Upto 1000 µµ/m3 0
More than Permissible limit i.e. 2000 µg/m3 5
CO (8 Hr. Monitoring) Upto 1000 µg/m3 2 5 - - -
Upto 250 µ+C43/m3 0
If 4 Parameters are above desirable limit 5
Ground Water Limit as per IS 10500:2012 If 2 Parameters are above desirable limit 2 5 - - -
All within Permissible Limit 0
If 4 Parameters are above desirable limit 5
Surface Water Limits as per IS:2296 Class C Limits If 2 Parameters are above desirable limit 2 5 - - -
All within Permissible Limit 0
Day Time (Ambient Noise) in More than Permissible Limit i.e.65dB 5
Residential/Commercial/Silent (Noise
Upto 50% of Permissible Limit i.e.32dB 2 5 - - -
Level in dB (A) for continuous 24 hours at
1 hour interval) Upto less than 50 % of Permissible Limit 0
Noise
Night Time (Ambient Noise) in More than Permissible Limit i.e.55dB 5
Residential/Commercial/Silent (Noise Upto 50% of Permissible Limit i.e.27dB 2 5 - - -
Level in dB (A) for continuous 24 hours at
1 hour interval) Upto less than 50 % of Permissible Limit 0
Saline/Highly Alkaline/Highly Acidic 5
Soil Moderate 2 5 - - -
Within 50% of Permissible Limit 0
Total - - 50 - - -
Social Environment
Option-1 Option-2 Option-3
Attributes Scoring Criteria Score Total Weight of Attribute
Score Score Score
>25 5
Upto 20 4
People No of Families Affected/Km 5 5 1 5
Upto 10 2
<5 1
>2 ha. 10
Upto 1 ha. 5
Agriculture Affectected Area/Km 10 10 10 10
Upto 0.2 ha. 1
if No 0
10 km or less 2
10 to 20 km 4
Total length of settlement sections (both towns and
Settlements 20 to 30 km 6 10 4 2 4
villages) abutting the road corridor
30 to 40 km 8
40 km or more 10
10 or less 1
11 to 20 2
Number (total) of sensitive receptors within RoW (such as
Sensitive Receptors 21 to 30 3 5 1 1 1
educational and health facilities) per km
31 to 40 4
41 or more 5
10 or less 1
11 to 20 2
Total number of drinking water sources (wells, hand pumps,
Drinking water sources 21 to 30 3 5 2 1 2
community water points/taps etc.) with in RoW per km
31 to 40 4
41 or more 5
10 or less 1
11 to 20 2
Number (total) of religious structures (temples, shrines,
Religious Structures 21 to 30 3 5 1 1 1
mosque, church, gurudwara) with in RoW
31 to 40 4
41 or more 5
2 or less 1
3 to 5 2
Number (total) of cultural properties (protected/
Cultural Heritage Site 6 to 8 3 5 1 1 1
unprotected archeological monuments) within RoW.
8 to 10 4
More than 10 5
5 or less 1
6 to 10 2
Number (total) of weekly market places/haats ; grain/fruit/
Market Places 11 to 15 3 5 3 1 2
vegetable/ fish market; cattle market
16 to 20 4
21 or more 5
5 or less 2
Number (total) of CPRs (such as pastures/gauchar lands; 6 to 10 4
Common Property Resources seating areas of the community; cremation/burial grounds 11 to 15 6 10 4 2 2
etc.) within/along the RoW 16 to 20 8
21 or more 10

Total - - - 60 31 20 28
Engineering Aspect
Option-1 Option-2 Option-3
Attributes Scoring Criteria Score Total Weight of Attribute
Score Score Score
10 km or less 3
10 to 20 km 6
Road Length, (Km) Total length of the Road 20 to 30 km 9 15 6 6 3
30 to 40 km 12
40 km or more 15
Nil 0
5 or less 3
6 to 10 6
Geometrical Elements Horizontal and Vertical (Curvature) 15 3 3 3
11 to 15 9
16 to 20 12
21 or more 15
High 5
Road Safety Moderate 10 15 10 10 10
Low 15
Better 5
Operational Connectivity / Access Moderate 7 10 7 5 7
Low 10
<30 Months 5
Construction Time up to 36 7 10 5 5 5
>36 Months 10
Low 1
Muck/blasting/ disposal Cutting/ drilling/ blasting / Disposal Moderate 3 5 3 1 3
High 5
10 or less 4
11 to 20 6
Underpass (No.) VUP/LVUP/SVUP 10 6 4 6
21 to 30 8
31 or more 10
10 or less 2
11 to 20 4
Interchange Number (total) of Road Junctions 10 2 2 2
21 to 30 6
31 or more 8
Nil 0
2 or less 4
Railway Crossing Number (total) of RUB/ROB/At Grade 3 to 4 6 10 0 0 0
5 to 7 8
8 or more 10
2 or less 4
Number (total) of Bridges incl. bridges on 3 to 5 6
Major Bridge 10 6 4 6
Water Bodies 6 to 8 8
More than 8 10
5 or less 4
Number (total) of Bridges incl. bridges on 6 to 10 6
Minor Bridge 10 10 6 10
Water Bodies 11 to 15 8
15 or more 10
Upto 300 2
300 to 600 3
Total Cost of Structures Civil Cost (Crores) 5 4 3 4
600 to 1000 4
1000 or more 5
Upto 500 2
500 to 1000 3
Total Construction Cost Civil Cost (Crores) 5 4 3 4
1000 to 1500 4
1500 or more 5
Total - - - 130 66 52 63