Professional Documents
Culture Documents
Kachhi Dargah Ramnagar 6 Lane Patna Ring Road
Kachhi Dargah Ramnagar 6 Lane Patna Ring Road
This part of highway starts at Ramnagar to Kachchi Dargah from CH: 0+000 to
14.257(Ramnagar to Kachchi Dargah)in the state of Bihar. The length of the
proposed alignment is 14.257km approx.
This is a green field alignment, access control and is proposed for 4-6-Lane. The
main objective of the proposed project is to reduce the distance and travel time
from NH- 2 to NH-57 and North-Bihar to South Bihar and to give connectivity to
remote areas and major cities. The project lays emphasis on development of
these areas and makes them available with the resources.
The proposed access controlled highway project with new alignment has been
envisaged through an area which shall have the advantage of simultaneous
development as well as shall result in a shorter distance to travel. The junctions
with existing road will be planned in the form of interchanges and flyover to
ensure uninterrupted flow of traffic.
The proposed road would act as the prime artery for the economic flow to this
region. It will enhance economic development, provide employment opportunities
to locals, strengthen tourist development, ensure road safety, and provide better
transportation facilities and other facilities such as way side amenities. Vehicle
operating cost will also be reduced due to improved road quality. The
compensatory plantation and road side plantation shall further improve the air
quality of the region.
Development of 4 lanes inter corridor (Green field alignment) from Amas( old NH-2/New NH-19)
to Shiwrampur under Bharatmala Pariyojana (Lot-5/Package-7) in state of Bihar Package-III
from Ramnagar (Ch. 00+000 to Kachchi Dargah (Ch.14+257)
Proposed Length – 14.257 Km
Seismic Zone The area falls under seismic zone III which is categorized as
severe intensity zone.(As per 1893:2002)
ANNEXURE II
Alignment Marked on Toposheet
ANNEXURE III
Analysis of Options
Details of Alternate Alignment Studyfor the Project Highway
Length of
3
Green Field
12.00 Kms. 14.00 Kms. 8.39 Kms.
Network
5
Connectivity
Ramnagar to KachhiDargah Ramnagar to KachhiDargah Ramnagar to KachhiDargah
6
Expected 18657 PCU (Preliminary Traffic 18657PCU. (Preliminary Traffic 18657 PCU (Preliminary Traffic
Traffic(PCU) estimates) estimates) estimates)
Land to be
7
Acquired
87.00 Ha (approx...) 99.00 Ha. (approx...) 65.34 Ha (approx...)
Cost of Land
8
Acquisition
715.33 Cr (approx.) (approx...) 814 Cr (approx...) 260.00 Cr (approx...)
Built-Up
9
section
18 no of building. 10 no of Building. 5 no of building.
Social and
Environmental
Trumpet/Fly-
11
Over
01 Nos. 01 Nos. 01 Nos.
Elevated
12
Structure
Nil Nil Nil
Major
13
Bridge
01 Nos. 01 Nos. 01 Nos.
Minor
14 Existing /
Bridge
09 Nos. 08 Nos. 09 Nos.
Proposed
15 Structure(s) VOP Nil Nil Nil
16 VUP 01 Nos. 01 Nos. 01 Nos.
17 LVUP 01 Nos. 01 Nos. 01 Nos.
18 SVUP 03 Nos. 04 Nos. 02 Nos.
19 ROB 00 Nos. 00 Nos. 00Nos.
· Traffic can move
without any hindrance. · Amount of Land required for
Traffic can move fast throughout
· Amount of Land Acquisition is more than other
as this is an almost straight
required for Acquisition two options, and consequently
Merit and alignment
20 Merits is more than other two total LA cost is higher than the
Demerits · Length of highway is shorter LA cost of other two options
options, and
than existing highway.
consequently total LA · Total civil cost is more than
cost is higher than the option -2.
LA cost.
· Land Acquisition · This option also has no
required throughout the spur connectivity to Gaya
· This option has no Spur
21 Demerits project stretch road.
connectivity to Gaya city
· Project cost is high then · Along existing road
other option. portion
Option 1 and 3 leads to more impact on structure and families as number affected families are high as compared to option 2.
If alignment option 1 or 3 is followed then it will leads to more impacts on Environment & Social components, hence Option 2
is followed.
The map showing alternatives site on Survey of India toposheet is given below:
Map showing 3 alternatives sites on Survey of India Toposheet
Ending of Opt-2
Ending of Opt-1
Ending of Opt-3
Project Name: Construction of 4 lane inter corridor(Green Field Highway) from Amas NH 2 (new NH 19) to Bela Nawada (NH 57) under
Bharatmala Pariyojana (Lot-5, Package-7) in the state of Bihar - Package-1 from Amas (Ch. 0+000) to Shiwrampur (Ch. 55+002)
Natural Environment 80 19 14 18
Biological Environment 80 6 5 6
Physical Environment 50 - - 0
Social Environment 60 31 20 23
Engineering 130 66 52 63
30 – 50 Medium
120 to 200
Total - - - 60 31 20 28
Engineering Aspect
Option-1 Option-2 Option-3
Attributes Scoring Criteria Score Total Weight of Attribute
Score Score Score
10 km or less 3
10 to 20 km 6
Road Length, (Km) Total length of the Road 20 to 30 km 9 15 6 6 3
30 to 40 km 12
40 km or more 15
Nil 0
5 or less 3
6 to 10 6
Geometrical Elements Horizontal and Vertical (Curvature) 15 3 3 3
11 to 15 9
16 to 20 12
21 or more 15
High 5
Road Safety Moderate 10 15 10 10 10
Low 15
Better 5
Operational Connectivity / Access Moderate 7 10 7 5 7
Low 10
<30 Months 5
Construction Time up to 36 7 10 5 5 5
>36 Months 10
Low 1
Muck/blasting/ disposal Cutting/ drilling/ blasting / Disposal Moderate 3 5 3 1 3
High 5
10 or less 4
11 to 20 6
Underpass (No.) VUP/LVUP/SVUP 10 6 4 6
21 to 30 8
31 or more 10
10 or less 2
11 to 20 4
Interchange Number (total) of Road Junctions 10 2 2 2
21 to 30 6
31 or more 8
Nil 0
2 or less 4
Railway Crossing Number (total) of RUB/ROB/At Grade 3 to 4 6 10 0 0 0
5 to 7 8
8 or more 10
2 or less 4
Number (total) of Bridges incl. bridges on 3 to 5 6
Major Bridge 10 6 4 6
Water Bodies 6 to 8 8
More than 8 10
5 or less 4
Number (total) of Bridges incl. bridges on 6 to 10 6
Minor Bridge 10 10 6 10
Water Bodies 11 to 15 8
15 or more 10
Upto 300 2
300 to 600 3
Total Cost of Structures Civil Cost (Crores) 5 4 3 4
600 to 1000 4
1000 or more 5
Upto 500 2
500 to 1000 3
Total Construction Cost Civil Cost (Crores) 5 4 3 4
1000 to 1500 4
1500 or more 5
Total - - - 130 66 52 63