Biogas from Cassava Mill Effluent - Preliminary Data Questionnaire.

The information in this document will be needed for evaluating the project.
Please provide as much information, relevant drawings and documentation as possible.
Client
PT BANYUASIN AGRO MANDIRI
Company / Farm Name
Mill Address
JL. PALEMBANG - JAMBI KM 102, DESA SUKAMAJU, KEC.BABAT SUPAT, KAB. MUSI BANYUASIN, PROV. SUMATERA SELATAN 30775

Contact Person & Designation TARJO


Phone 0811 5208 468
Email tarjo333@gmail.com
Project Name BIOGAS
Project
Proposed Gas Utilisation Electrical Energy ✔

If more than one utilisation is possible, Heat Energy


please rank in order of importance. Electricity to Grid
Gas to Pipeline
Transportation Fuel
Carbon Credits Revenue
Other
Project basis
Time required to completion
Target Project Capital Cost Range
Special Factors For This Project
Level of automation expected
Gas quality specs (H2S, CH4, Moisture, ect)
Nominal Genset Brand
Plans To Expand Plant Capacity Percentage
How soon Months / Years
Plant Operating Characteristics
Operational Management System Available Yes No
Number of Operation Days Per Year 300 Days
Number of Operation Hours Per Day 7 Hours
Operational Period Defined Yes No
5 Day per week Yes No
7 Day per week Yes No
12 Months per Year Yes No
Other Months per Year
Plant Operates At Full Capacity Yes No
Plant Production Ramps up to Full Production in 3 Hours
Define Peak Season Months From: Maret
To: Agustus

Plant Capacity
Maximum Plant Capacity 50 ton / Hours
Type Cassave root incoming
Average Season Peak Season
70 250 Tons / Day
Production of tapioca starch 21000 75000 Tons / Year
Wastewater
Wastewater Management System
Wastewater Characteristics
Total Wastewater Flow Wastewater Stream #1 Liquid discharge from process - m3 /day
Wastewater Stream #2 Wash water - m3 /day
Wastewater Stream #3 Root cake - m3 /day
Sulphuric Acid Use Yes No
Amount - Ltrs /day
Current Wastewater Treatment Method
Holding Ponds / Lagoons Hydraulic Retention Time (HRT) Capacity (m3)
#1 268

#2 12721

#3 2896

#4 2896

#5 3750

#6 4014

Wastewater effluent from lagoons discharge method Irrigation


Flows to a river
Flows to other water source
Flows to existing treatment plant
Wastewater Analysis pH 7 pH
Temperature 37 'C °C
Total Solid (TS) %
Volatile Solid (VS) %
Volatile Fatty Acids (VFA) mg/l
Ammonia (NH3) mg/l
BOD 1419 mg/l
BOD Soluble (SBOD) mg/l
COD Total 2184 mg/l
COD Soluble mg/l
FOG (Extractable Fat Oil & Grease) mg/l
Total Sulphate mg/l
Total Nitrogen (N) mg/l
Total Potasium (K) mg/l
Total Phosphorous (P) mg/l
Biogas from Cassava Mill Effluent - Preliminary Data Questionnaire.
The information in this document will be needed for evaluating the project.
Please provide as much information, relevant drawings and documentation as possible.

Wastewater Flow Monitoring Method Float Method


V-notch Weir
Square-section Weir
Partial Flume
Magnetic Flow Meter
Doppler Flow Meter
Stormwater
Stormwater Flow Management Is there a stormwater channel system Yes No

Does stormwater flows directly to wastewater lagoons Yes No

Is stormwater left to seepage Yes No

Precipitation - mm / hr / day / year


Equivalent Avge Intensity - mm / hr
Site Data If Yes, please supply
Site Survey Information Available Yes No
General Layout Sketches Available Yes No
Land Available For Proposed Biogas Plant Yes No
Distance Land Available To Plant Facilities 2.000 m
Proposed Site Fenced Yes No
Power-Transmission Line Distance from Supply to Site 500 m
Any Power Supply Limitations? 2770 KVA
Standard Voltage Available 3 Phase to Phase
Mains Frequency 50 Hz
Telecomunications Available Nearby? Landline Cellphone ✔

Fresh Water Available at Proposed Site Yes No


Known Problem with Underground Water Yes No
Known Building Restrictions Yes No
Properties of Site Soil Strata Data
Clay Yes No
Sand Yes No
Depth to Ground Water Table 15 m
Energy Requirements
Mill's Energy Consumption 1108 kWh
Mill's HFO / Diesel Comsumption 51276 Ltrs/years
Mill's Backup System Yes No
Type Perkins

Size 1250 kW

Electrical Bill last 12 months available Yes No


Peak Demand 1330 kW
Actual Demand 1108 kW
Grid Connection
Is the mill connected to the Grid? Yes No
Distance from mill to the next PLN Substation 33.000 m
Name of PLN Substation or Reference Number PLN Betung / 142300829262

Miscellaneous Data If Yes, please supply


Mill's Age 0,25 Years In Production
Private Company Yes No
Public Company Yes No
Number of Employess 60

Number of Boilers 1

Capacity 1
2
3
4
Boiler Fuel HFO
Diesel
Electrical
Weather Data Available (Source of Data) Yes No
Temperature 37 'C

Wind -

Rain -

ISO 9001 Certified Yes No


Plans to do so Yes No
ISO 14000 Certified Yes No
Plans to do so Yes No
Mill Has Government Privileges Yes No
Palm Oil Exported Yes No
Destination 1 -

2 -

3 -

4 -

5 -

Distance to Other Industrial Areas 500 m


Distance to Residential Areas 2.000 m
Odour Regulation Yes No
Please state
Noise Regulation Yes No
Please state
H2S Levels Monitoring Yes No
Any Other Local Discharge Consent Yes No