fly Designation: A 991/A 961M - 08,
‘Standard Test Method for
Conducting Temperature Uniformity Surveys of Furnaces
Used to Heat Treat Steel Products’
eget pn eect won eyes wi Aster apa Secs yr es nage
‘tps pee) ans ee acy ace eas on aa
1, Sooper
1 This test metho covers the procedures used to conduct
‘temperature uniformity survey ona fumace used to heat teat
‘al proto, Tit method ie uted to determine the capability
ofthe fumace to meet the pemisible temperature variation
‘peed inthe applicable prod pecfeton. oa agreed 12
2 the purchaser and supplier ef Beat teat services. Survey
Geumenation roquement, a the procedure usd wo sabee-
‘pany estab he furnace working 2one, are defined in tis
Smet
1.2 This test method cover heat wea frees i any ofthe
folowing categmies:
21 Costiauous or sem-continoous conveyance faracee,
122 Beh fumaces, and
123 Salt or liquid Baths snd ized bods
13°This est method only applies when specified in the
medut speciation or the puchase ort.
4 Cantolling a beat weament of ste! products using
‘temocotples mtached to the extemitcs of each load Is 28
nave to performing a fmace survey
15 By mutual agreement between the purehater and the
‘pps of heat eat services, more singer andor addonsl
‘upiements may be species. The acceptance of any each
‘sGtional requirements shall be dependent on negotations
>it the supplier and mast be inelided inthe order agreed
"yon bythe purchaser and supp
16 The values stated in iter ST units o inch-pound units
‘eto be repadadsepertly at standard. The vales stated in
seb system may not be exact equivalents; therefore, each
‘tn shall be used independently of the other Combining
Yue: from the two systems may rel in non-conformance
2 te standard
sete Satie ss oe mat eae
‘MiSs Mal a Ceca Tae wd Peng Mado oS
lie eos pd Oct 1, 58 biel Ca 200 gay
Myo aoe pein oes m5 A HEA
LT This standard dows not purport to adress all of the
safety concers, if ary, associated wih it woe. It isthe
‘esponsiliy ofthe wer of he standard 1 estalsh pro
‘rise safety ond hecth practices dnd determine the dpi
bitty of epuatory linatons prior to wee
2. Referenced Documents
2 ASTM Stondande:™
E207 Test Method fr Thermal EMF Test f Single These
tpoclement Materials by Comparison with a Refreace
‘Thermoclement af Silar EMF-Ternpertue Properties
18220 Test Method for Caran of Taeraovouples By
(Comparison Teciguss
£2230 Specification and TempersureBleceomotve Fore
(EME) Tables for Standardized Thermocouples
E.GOB/E OSM Specification for Miner-lasulaed, Metal-
‘Sheathed Base Metal Termocoupes
22. SAB Standard?
‘AMS 2750 Pyromety
3, Terminology
34 Definitions of Terms Spcic to This Standart
Sia batch femace, n—beatng device in which material
may be stadonary or esiling during the processing cycle,
3112 continuous comeyance furace, m-besing device
through which materi is roved intentional ata contant
rate during the processing cle
313 extrmtes, nas feletng to farce working rene:
‘outer oundaes in ll te dimensions (eng width and
Deight) ofthe material being proesred
"11.4 operaing range, mexpecied range of termperaice
lover which 2 furnace wll be conoled to heat teat rel
profes.
sctuct AS Ct Sporn tp Pal Bo YT
Shed Be 150001 gene
“A Summary of Change stn appears a Geen of ts sun,
‘er sentnars 0 ey ee OP oO Ht nena Poe ne Boepy A s910 oo1m - 08
23.1.5 primary survey, r—iaitial evaluation ofthe furnace,
‘can evaluation triggered bythe initiation of «major firace
‘nodifiation
“31.8 secondary survey, n—evaluaton of the furnace tig-
gered bythe expiration of «Hime requrement
S17 semi-continuous conveyance furnace, »—heaing de
vice through which mara is raoved intesionlly with &
ele! tsp pate cing te eng
38 working zone, »—maximum volume and lesion in
the furace that mes the permissible temperature variation,
Significance and Use
4.1 Fumaces for hea ueamen of steel products ate used in
soasy indueties, in many ways. Regardless of beat (eat
{nace type, or processing cyte it may be necesary for users
{fo kaow te temperature uniformity in the fumace ad whether
the mater is processed in a soe within the fumace that is
‘capable of mecing the applicable permissible temperaure
‘ariton reuiemens.
“4.2 The procedures in this test method may be used by those
xing, manuftcning, and providing clibeaion service for,
hee oat furnaces used to process stel produc.
5, Furnace Survey Equipment
S11 Thermoceuples
5.1 Mot sheatied thermocouples shal be in cordance
with Spcicaion E 6087 «08.
‘S13 The use of extension wires is pemaitted when com
pnesed connector, pugs, jocks, and tering sips ar used.
‘S Taermocouples made fom spool wire shall meet the
roqirements of AMS 2750
Sia The ae of spliced extension wire is probibite,
5.15 Thermocouples may be reused if the requirements of
AMS 2750 (except Paragraphs 3.1.10 and 3.1.11 Rev. D)
‘5.2 Calibration
521 All refeonce, primary, secondary, test and working
yuipment,intumenttion and sensors used in cojunction
‘vith hs test method shall meet the reguremests of eaibration
(eine by Test Methods F 207 and 220,
5.22 Temperature measuring devices shall be callbrated
within hee mons pir v0 use
5.23 Calibration shall be aceable to the National Insite
of Standards Technology standards, or equivalent national
‘andar, Calton. such ratios stands sell be done
lest once every evo yeas
5.24 Callraion shall be win the temperatre range 0 be
sed in the survey and a oterals not greatr tan 200°F
[00°C for rimary and sacondary stands.
5.25 Conecton factors, it of ero, and devistons shall
bein accordance with Specification £239,
6 Requirements
{6.1 Uniformity Survey Test Condtons:
6.1 The furnace fo be surveyed shal be capable of being
tested at set point temperatures) pica for the oom
peraing range.
6.1.1.1 If the operating range does nt exceed & sre
00°F [150°C she midpoint temperature sll be Selec
the suey,
1.12 Ifthe operating range exeseds a spread of 209%
(050°C), survey at the minimum and manu Set poy
temperature for the normal operating ange, except tha ec
‘maximum temperature need not be higher than 2009p
(itoo-cy.
161.2 Exter typical or maximum production Sie aed wey
furnace loads shall be utilzed during the survey. Use of
represetative miei > simulate product during survey i,
permite.
‘613 The fumace amosghere and operating condins
stall be epreseatatve ofthese wed in production.
"62. Frequency of Uniformly Surveys
62.1 Primary Surveys:
62.1.1 A pomary survey shall have boon perfored within
twelve montis poe fo, oc rn concurrently With, the Sn
eat treatment 19 which this test method ape
(62.1.2 primary survey sal have been conducted whens
major farntce modifston is completed. A major funie
modification incudes, but isnot ited to, the instalatine
the fellowing: a diferent bumer type, 2 new beating elemex
design, a dierent typeof imulaion system, and, a lees
‘yperof temperate convolling device
‘621.3 Replacement of wom pict with similar prs
patching of invlation that does not change the fire
harntrisic does not consiute # major furaace modi
162.14 The survey sal conducted within twelve oats
prior to, of run concumently with, the frst production bx
treatment performod ar the modification
{622 Secondary Surveys
6221 To mainain conformance with his test meth»
secondary sorvey shall be conducted within twelve moats
‘ier the peimary survey
622.2 Secondary surveys shall be conducted at a pia
fumace set point tmperstire within the normal ope
range All other conditions described in 6.1 shall apply
1, Procedure
74 Survey measuring equipment shall meet the requ.
ments of Section 5.
“72 ‘Test conditions and west frequency shall eas defies
5:1 and 6.2, respectively
7.3 lice thermocouples 19 monitor time and tempat
profiles in the fumace to evaluate the uniformity of
Intended working zone. Place tbem athe ote extreme
cer of the proposed working 2on, andi areas of spe
Satiaility in te proposed working zone Attach savy
$essors 1, oF se them in the lod,
74 For proposed working zones Jes than 12 in. (3008)
in height i scceplable to monitor the center height oa
iti not necessary 10 monitar Both the top and botiom a
hetting chamber: For proposed working 20es greater tha
‘qual to, 12 ia, (300 rm) in height, both top and boc
fttremtes must be manitored.
73. Continues Conveyance and Semt-Continaous Cor
ance FumacesAlp A 9018 so1m 08
15.1 Comey es sensor trough the funace. Thereof
enveace sal be repesentive of nana optatng ond
7152 The fequncy of tempentue rcordngs sal be
cube of deg vain oa to opersur age
‘Sing teenie conveyance tug fomace
713.3 Several conveyances wh the et sess ake to
st prot undr fe sae coals maybe de
wae ta ay recure temperate pe fe ened
Set estos ehwaghou ie fares
754 Alleraive surveying techs ae described in 77.
16 Batch and Bach Lid Medea Famacer
7.61 Take readings staring when the contol instrament
ss win 200 [100°C the st polenta and
stim rougout the lec te pt tp
"162 Take readings at miu fequncy of 10th
somal bold tine
"T63 Take the vedings frequently enough to detect vas
som fom the et temperate rags ado decenng he
ftenes ofthe ect epee pole i any
764 Alemative surveying etna ae decribed a 77.
17 Atematve Surveying TechniquerWhen aged oy
spurte and ih sop hea teat series erate
syn tecoiges maybe wed charset te tepere
SEeufonity of he mse and whoa def ns
teoston of the woking sone Exanpe of ese sane)
nus sted low
TE Stats! Sampling
27. When is imponsible or igractclt peor be
Su clio’ in 7.5 and 76, erm te an
‘mie ofthe res mcchaneal properties he seal
Dosis beat reed inthe sje mae to alae te
‘ee wiry Deals ofthis procedural bested
Stnoeen preset ant spi
112 Sequential Load Sensors
1221 Ths posture may be ust 2 an arative to
fee described In 7.5 and 74 te provides alts of
‘pw unfrty by asin ft ae an Sle
‘leah et, detemize he engeie arton tet
(more of th te lca,
1122°The fequeny of te shall be Sx months
1723 The emperntre shall te wine normal pert
4 ms, wal ihe parent permissible varaon fee he
el sped tthe surey
7724 Rune fpac with lads that we na
‘al pedection cle
1725 Load or tt senses shall be ange ino a
mat ihe tt a
7726 Control sting) sal be desl ots wed in
“"mtul prodvetion. “ wt
1727 Take readiegs stating when the cone nseunens
2 within 200 (10°C a est po erperuaand
{Bie eoughout he hol cyl we tet pot empar
2728 Record the temperature ofall oad test and working
(S25 fiequcmtly enough to detect when the ‘specified oper-
Rtmericusitt mustas neseesar te
vernon
sv
7.729 Ih no recur temperatre profile is detected, ake
readings ot intervals of five minutes ores for et est 3 a
siter thermal equiiam i reached
1 Documentation of Survey Results
‘1 Oryniatons peng surveys i accordance wth
this test method all eep pene dacmanson tp
onions and proses ane comple he er
‘on Gile for a minirmum of five years, i *
'82 Penne documenta sal inl, ut it be ine
ted, te falowiog
82:1 Specie demfcmion of fumace surveyed,
82:2 Das of te uniformly trey,
4325 Ideiexton ofthe het en proce
8231'S point epee
8232 Type uf some,
82.33 Comeyance apa (hes apie,
8.24 Sic nd weigh Ostet po faded once st
sn of suey
4.25 lem Menifcuion number (tease
$2.6 Time and temperate ta. tciing ena
perature chars or orga maualy ected dts
£27 Dimension and locaton o he morn foes),
828 Number an Toston of he suvey herent,
829 Largest cbtened tempest vaston fen Be ek
pein dns ths eld cy
82.10 The tine eral of the te incading the sa
lapsed time: Saring tine so shan speed sal bene ok
th oil epee char,
‘2:1 Al pene ecupmentcaeaton information,
82.12 Deviations fo the tt ted elng bo ot
limited, heanocupie Tas, alacton or diame
82.13 Name of permet costing the sey and
83 All dau may te elestoncaly cre
9, Interpretation of Results and Establishment ofthe
Working Zone
DA The results ofthe primary survey describe the tempera
(ue uaiformity ofa furace under 4 specie St of opting
‘ondiions. Results ofthe application ofthis et mth hall
‘be expressed a a varaon (rom a temperate set pant.
‘9.2 Esiabishment ofthe firnace watking zane is mse by
comparing the temperate variation toque 6) the produce
specfietion or agreed to by purchaser and saplie of Peat
‘wet services, wih he variation from the temperte st psa
8 determined by this ifort survey,
953 The working zone my either be the etre beating
\olume,o it may aly be some portion of the heting vols
ofthe furnace. The working z0n8 iy be compris of eo
ore heating zones nthe fume,
1, Heat Treatment In the Working Zone
101 When invoked by the prot specication, o agreed
1m by purchaser and stppier of eat treat services Seal
rods shal be hear seated as specie nly the wongGy a so1n corm 08
11. Keywords
LL farnace survey, temperature; unifomsity; working 2006
‘SUMMARY OF CHANGES
Commitee ADL has identied the location of seleced changes 10 this standard since the last iete
(A991/A 991M ~98 (2008) that may impact the use ofthis standard. (Approved Osober 1, 2008.)
(D Revised Sections 5.1.5 and 6.1.2
sm rata te re pan rpc 8 ay Sater es sate ccm my em eas
nite ranan Ceo ot sua weep seu fat coarser Se ay a) Pal we
rirogear fcr ety Pa an rea
‘Ts gnc eto ran aay By oy to mons cong ards ean ay Ne yw an
rtd eer cprvag mann ar comets od cba bronsan ct tsarareeressbo sa
(tnt aso w AST rant Hasyn nea a or arena he
‘ent naaca/cmmos wha pany ey nl at ya conmors aerated has ou
‘Bey vrs te in AST Coan a Sanda a ato sown Sta
‘sunset ASTI vara 10 ar bo De, FO Bo C7, Wnt Corr, 812830,
nie Soe haa psf mac) scr ray tae cng AST a ee
‘Slows ov Shears promy Bioasease a or mmvceasamnan femal ey he AST wees
‘ran sh
sis