You are on page 1of 1
DAMAC DAMAC CRFSCFNT PROPFRTIFS DELTA MATS NASCON [ SHOP DRAWING TARNSMITTAL SHEET SD-MECH-001 4 Project Name DAMAC HILLS, SILVER SPRING 3 Project No. P021. 7. Main Works for 46 Villas (G+1+R) Date 03-APR-22 [Submit No: P021.47-DB52-SD-MECH-001 _[Revision: oo [Submittal Ti 3 ‘Shop Drawing submittal for drainage system layout + ITEM NO.| ODWGS. SPECS BOQ REF. lWe are sending herewith under separate cover the drawings / documents / sampies listed below: DESCRIPTION TyPE | COPIES |REMARKS 01 attached system layout Drawing | As per attached |Ground floor low level drainage Thard copy sp & Isoft copy | EIBE-SD> Shop Drawings, Si> Sample, OT= Guarantee, HD= Manufacturers Data, CT= Corl cates, TT= Test Results, OT> Other We certify that the documents / materials submitted herewith have been reviewed in detail and are in strict -e with the contract drawings and specifications except as otherwise stated. co f contr Signature: {ao SCO Nps: refer: nat tana i li - ‘Signature: ate: Resident Engineer Review Comments x Receved BY ] S BS Date: 03 APR a fs BX RECEIVED £5) eS Sy 7138S _S Saya [Consultant Decision OW Approved © ‘B’Approved As Noted (_ ‘C'Not Approved © D'NotRequired [and performing his work in a sefe and satsfactoy manner. Copy to: Head Office Employer [] Consultant fe Other Resident Engineer's (Name): |Signature: [Received By Contractor: Date: Date: [Conectons or comments made relaive To eubmtlale dung the Tevew do nol rolove the coniracior Vom complance wih Ta] requirements of The Contract. This check is only for reviow of general conformance withthe design concept ofthe project and general Jcomplance with the information given in the contract documents, The contractor i responsible for confirming and corelating ll Jzuantiies and dimensions, selecting fabrication processes and techniques of construction, coordinating his work with that of other trades "Sheet No. of,

You might also like