IR-DB52-ELEC-001 Installation of Electrical Sleeve & Thermocoal Provision For Electrical Services in Tie Beam

You might also like

You are on page 1of 1
io ‘Arf&Bintoak ~— DAMAC CRESCENT PROPERTIES DAMAC DNs’ NASCON GINEERING. BUIRAES ale oa hag Form No.: SPM/PAVIR/003/00 DAMAC Hills Silver Spring 46 Villas ~ DB52 Roquest Date: 1370@/2022 Time: 10500 ANT Inspection Date 1410472022 Time 108.00 AM ‘CONTRACTOR INSPECTION REQUEST No. Rev. No.0 IRIDBSZ/ELECIO01 Details of inspection: ELECTRICAL SLEEVES IN THE GROUND FLOOR TIE BEAM Location of Work: Group: _TH16.G13-1 Drawing /Specification ref_| As per attached locations a Details of Works: Inspection request for installation of Electrical sleeve & thermacoal provision for Electrical services in the Tie beam at group : TH16-G13-1 as highlighted in attached drawings from Grid A to J & 19 to 40)-7vilas (TH16-M BTH16-£) ‘iachments x Cicheckist Ml Drawing & Specifcation CI MEP Clearance [[] Related inspection Requests D others : a Confirmation of Contractors GA/GC Inspection Confirmation of Coordination & Compliance with Speciication, Approved drawings, Method Statement & Project Quality Plan [7 Yes No] Tino, any deviation from specification, approved drawings, method statement & project Qual plano be recorded p elk. 1 Name: Vinod E. a Signature: Date: SSS ere ml For Main Contractor: (PM) herceaee tae oe Rea prions mew a aa Ra hae coieaey Freres} Tora Tee | [ae Important: Permission to proceed does not constitute acceptance or approval of work under inspection does not relieve the contractor from full compliance with contractual requirements, Resident Engineer Signature: Resident Engineer comments complied: For Sub:Contractor: For Main Contractor: Name: Name: Signature: Signature. | Date: Date: Resident Engineer verification of compliance of comments: Name: Signature: Paget of2

You might also like