You are on page 1of 1
DAMAC DELTA Al DAMAC CRESCENT PROPERTIES LLC BARU ly 33! Form No.: SPM/PA/STS/001/00 Arif&Bintoak [PRE UALIFICATION TRANSMITTAL SHEET # PQD-MEP-001 a] [Pre foject Name | DAMAC HILLS SILVER SPRING 3 Project No. P021.47 Main Works for 46 Villas (G+1+R) Date | 10/04/2022 Submittal No [P021.47-DB52-PQD-MEP-001 [Revson: loo [Submittal Title: Prequalification for Nascon Engineering for MEP Works. |We are sending herewith under separate cover the drawings / documents / samples listed below. ITEMNO.| —DWGS, SPECS BOQ DESCRIPTION TYPE | coPIES | REMARKS REF. Prequalification documents of 1 Hard copy 01 M/S Nascon Engineering for PQ & MEP Works. 1 Soft Copy foes ‘Shop Drawings, SM= Sample, GT= Guarantee, MO= Manufacturers Dale, CT= Geriicales, TT= Test Rennie [Supplier / Manufacturer: [M/s Nascon Engineering for MEP Works We certify that the documents / materials submitted herewith have been reviewed in detail and ‘are in strict| [conformance with the contract drawings and specification ptas-ethemise stated. 3 [Contractor (Name): (Signature: Other Mohammad Nafa Date: [Resident Engineer Review Comments 52 an Decision — © A’Approved O pproved As Noted OC NotApproved CO) D’NotRequired Resident Engineer's (Name): Signature: Received By Contractor: DB: Date: Date: IGomectons ox comments mado rave to submits during Wis review do nol eave te contacter Fam Complance wit Te TUaNETETE] rerecrormation given in the contract dacuments. The contractors responsibe for confining snd correlating al useilice nd soto sie cang {abncation processes and techniques of construction, coordinating his wrk with that of other wades a perfomnag his we rg [safe and satisfactory manner Copy to: Employer [] Consutant [J 08 [— otter [Sheet pee | fice eee

You might also like