You are on page 1of 5
aamec — WINK! WNASCON DAMAC CRESCENT PROPERTIES LLC ‘ArifSBintoak UAEForm No.: SPMVPAIRFU/005/00 |Request for Information # P021.47- DBS2. 103 MECI Project Name DAMAC HILLS SILVER SPRINGS -46 | Project No. | P021.47 VILLAS (DB-52) Date OF06 2022 RFI Title: [Clarification required for the height of the Rain water discharge in ground floor ISPEC/DWG REF TTH16-M (MH-DR-101 MH-DR-107) , TH16-E(MH-DR-101 MH- IDR-107) Please confirm With reference to the subject the invert level for the rain water discharge is shown as + 100mm above the FFL of interlock in IFC drawing. In the section details, it is showing above the| Iie beam, which is not matching with site as it is coming inside the tie beam. Please find our proposal to keep the pipe at an invert level of IL +225mm from interlock that it will be above the tie beam at structural finish level Copy to Employer Head Office [] Consultant [] as [] other [] actor: ~ Signature ~~ Date Contractor: "Signature: - Date Ts Received By R.E ‘Signature: At EMAR/ “Date DB-52 Response By Consultant (R.E) |Attachments: Resident Engineer Signature: Date Received By Contractor ‘Signature: [Pete GROUND FLOOR DRAINAGE SYSTEM LAYOUT Pere TALLPIPE size INDICATED IS OUTSIDE DIAMETER, ZALL FLOOR TRAPS AND FLOOR CLEAN QUT LOCATIONS TO BE COORDINATED AS PER ARCHITECTURAL TKING LAYOUTS ac cc teo-08 “cameos Isiver samc) wore — (At tes sae noose sures ouuere | IAL Foc apes Scr BEAN OUTTSEATONS TO ze fel GROUND FLOOR DRAINAGE SYSTEM LAYOUT _BE COORDINATED AS PER ARCHITECTURAL TING LAYOUTS

You might also like