DAMAC CRESCENT PROPERTIES LLC
‘ArifSBintoak
UAEForm No.: SPMVPAIRFU/005/00
|Request for Information # P021.47- DBS2.
103
MECI
Project Name
DAMAC HILLS SILVER SPRINGS -46 | Project No. | P021.47
VILLAS (DB-52) Date OF06 2022
RFI Title: [Clarification required for the height of the Rain water discharge
in ground floor
ISPEC/DWG REF TTH16-M (MH-DR-101 MH-DR-107) , TH16-E(MH-DR-101 MH-
IDR-107)
Please confirm
With reference to the subject the invert level for the rain water discharge is shown as
+ 100mm above the FFL of interlock in IFC drawing. In the section details, it is showing above the|
Iie beam, which is not matching with site as it is coming inside the tie beam.
Please find our proposal to keep the pipe at an invert level of IL +225mm from interlock that it will
be above the tie beam at structural finish level
Copy to
Employer Head Office [] Consultant [] as [] other []
actor: ~ Signature ~~ Date
Contractor: "Signature: - Date
Ts
Received By R.E ‘Signature: At EMAR/ “Date
DB-52
Response By Consultant (R.E)
|Attachments:
Resident Engineer Signature: Date
Received By Contractor ‘Signature: [PeteGROUND FLOOR DRAINAGE SYSTEM LAYOUT
Pere
TALLPIPE size INDICATED IS OUTSIDE DIAMETER,
ZALL FLOOR TRAPS AND FLOOR CLEAN QUT LOCATIONS TO
BE COORDINATED AS PER ARCHITECTURAL TKING LAYOUTS
ac cc
teo-08“cameos
Isiver samc)
wore —
(At tes sae noose sures ouuere |
IAL Foc apes Scr BEAN OUTTSEATONS TO ze fel
GROUND FLOOR DRAINAGE SYSTEM LAYOUT
_BE COORDINATED AS PER ARCHITECTURAL TING LAYOUTS