General Notes:

1. These Contract Documents are the property of the


Architect. The Architect bears no responsibility for the
interpretations of these documents by the contractor.
Upon written application the Architect will provide
written/graphic clarification or supplementary information
regarding the intent of the Contract Documents. The
Architect will review Shop Drawings subm itted by the
Contractor for design conform ance only.
2. Drawings are not to be scaled for construction. Contractor
to verify all existing conditions and dimensions required to
perform the W ork and report any discrepancies with the
31 33 34 35 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 60 61 62 63 Contract Docum ents to the Architect before commencing
3160 5720 1850 2950 1590
2210 620 1710 1230 1580 1460
1955 495 1385 465 1380 730 650 1655 950 2000 2125 6180 335 4830 1220 3260 3200 4385 3300 work.
3. Positions of exposed or finished mechanical or electrical
devices, fittings, and fixtures are indicated on the
Architectural drawings. The locations shown on the
Architectural drawings govern over the Mechanical and
Electrical drawings. Those items not clearly located will be
located as directed by the Architect.

North

1 2 1 2
A06.01-D A06.01-D A06.02-D A06.02-D Project North True North

CUSTOM SUITES
REFER TO CUSTOM SUITES:
1 · 328
1
A03.04B-D · 526
A03.04A-D
· 537
· 726
· 816
· 920+921
· 1023
· 1615+1616
ON "A03.20-D" SERIES FOR DIMENSIONS
& TAGS

BALCONY W W 333
BALCONY

W W 334

W W 332
BALCONY BALCONY RODEO RODEO
W W 341 W W 336 23 W W 335 2B+D 2B+D
A2 327 326 A2
STANLEY

W W 337
W W 340
1 W W 339 W W 338
2B 1
ARKELL 328
3265

3265
A06.06-D A06.06-D
1B+D
REFER TO CUSTOM
330
SUITE 328 ON
CLIFTON SE1 SE1

BALCONY
B2 "A03.21-D" FOR B2
1B

W W 301
DIMENSIONS & 6
1715

1715
329 A12.03-D ELEC CLOSET SE1
TAGS
C2 SE1 SE1 C1 STF03 C2
D305

875
D2

565 1115 535 800


STAIR F UP UP
3325

E2
1
HAYNES 1
1B+D ST-F UP F2

W W 331
A06.05-D DN A06.05-D
G2 SE1 SE1 SE1 323 G2
W W 302 PALM
1B 4 LINDEN
BALCONY

ELEC CLOSET A11.01-D H2


2555

331 1B+D COPLEY

1990
SE1 C1
STC03
D302 MECH. SHAFT
E1 324 2B
J2 MECHANICAL 325 J2
595

DN
ELEV.
ROOM

2185
K2 UP ELEV. W W 322
W W 326

07

W W 325

W W 327
MAPLE 09

W W 323
D304 W W 330

1B F.F.E.
W W 303

W W 329

210
L2
332 STAIR C/D ELEV. LOBBY
BALCONY
4975

AVALON W W 324
W W 328 M2
ST-CD
1B+D

3175
1 ELEV. D301 BALCONY BALCONY 1
338
A06.04-D SE1
08 A06.04-D

W W 321
UP GARBAGE ROOM

BALCONY
N2 N2
DN
1620

1620
1035
W W 304 MECH. SHAFT D303
STD03 D1 SE1
Q2 Q2

1335
SE1
1955

W W 320
R2

620
SE1 SE1 SE1 SE1
S2 677 23
SITE INSTRUCTION 91 2022-08-18
1285

S2 22
SITE INSTRUCTION 36 R1 2022-03-02
21
SITE INSTRUCTION 53 2022-02-10
T2 20
SITE INSTRUCTION 36 2021-07-19
1 1
A06.03-D
ROXBURY A06.03-D
19
SITE INSTRUCTION 25 2021-02-12
18
SITE INSTRUCTION 22 2021-01-28
2B+D
W W 305

5105
BALCONY

17
RE-ISSUED FOR PERMIT 2020-09-14
333 16
SITE INSTRUCTION 04 2020-09-03
3820

15
ISSUED FOR CONSTRUCTION 2020-05-15
14
ISSUED FOR COORDINATION 2020-04-03

W W 319
13
ISSUED FOR COORDINATION 2020-03-04
12
ISSUED FOR COORDINATION 2020-02-12
SANTA MONICA 11
RE-ISSUED FOR PERMIT 2020-02-05
U2 SUNSET S CARSON GREGORY 2B+D U2 10
RE-ISSUED FOR PERMIT 2020-01-10
1B+STUDY 1B 2B 337 9
ISSUED FOR COORDINATION 2019-11-29
8
RE-ISSUED FOR PERMIT 2019-09-25
8 334 335 336 7
ISSUED FOR DRYWALL TENDER 2019-08-02
3570

3570
6
ISSUED FOR COORDINATION 2019-07-05
A09.10-D
5
ISSUED FOR WINDOW SCHEDULE 2019-05-31
4
ISSUED FOR DOOR SCHEDULE 2019-05-17
W W 310 W W 315 W W 316
3
ISSUED FOR WINDOW TENDER 2019-03-11
W W 309

W W 311

W W 314

W W 317
2
ISSUED FOR PRELIMINARY PRECAST 2019-02-12
TENDER
V2 V2
1 ISSUED FOR BUILDING PERMIT 2017-09-05
W W 318
11 W W 306 W W 308 W W 312 W W 313 Rev. Issue / Description Date
W W 307

A09.10-D
BALCONY BALCONY BALCONY
Architect of Record:
6745

6745
W2 W2
2868

2868
X2 X2

Project Title:

DON MILLS TOW ER D


1 2 1 2
A06.01-D A06.01-D A06.02-D A06.02-D
Address TORONTO, ONTARIO

OVERALL FLOOR PLAN -


LEVEL 03
8/17/2022 4:43:13 PM

2080 1080 5720 1850 2950 1590 620 4520 1460 3725 730 2305 950 2000 2125 6515 4080 750 3580 4100 4385 3300

31 32 33 34 35 37 38 39 42 43 47 48 50 51 52 53 55 56 57 59 61 62 63

Project num ber: 1627


Scale: As indicated
Date: 05/12/2022
Drawn by: Author

Drawing No.: Revision:

A02.07-D 23