15
Part name : Connecting rod
50
Part type : Metal part
Material : Casting
Category : MIW
2. Crank shaft RH
Material : Casting
100
Part weight : 0.94 kg
Category : MIW
30
Part number : G3080250
Material : Casting
Category : MIW
Dia. 145
Part dimension : Dia.145 x 30 mm
80
Part number : N5220810
Material : Glass
220
Part weight : 0.43 kg
Category : MIW
1. Quality:
• Parts / Crates should not project outside the rack
• No sharp corners
2. Safety & Ergonomics:
• Rack should with stand the material weight.
3. Ease of operation:
• Easy to load / unload parts/crates.
4. Ease of Maintenance:
• Easy to clean
• Easy to assemble and dismantle.
5. Flexibility:
• Design must be common for each part per model
• Shelf height should be adjustable for any other part
6. Cost:
• Utilize maximum volume of space within the crate and reduce cost of storage per part
TVSM / PED / MSE / MHSE Slide 112
Elements of Storage facility Design
The different levels of designing a storage racks are explained in detail below,
1. Material:
• M.S Material with the specification Of IS 513 Grade “0” (Cold rolled low
carbon steel) Square tube, Rectangle tube, Plates, Flats, Tubes, Rods,
Angles, Sheets,
• ID range from 6mm dia to 38 mm dia with 2.2 to 3.0 mm thk as in the table
below
Storage racks
3R Card
Roller chute
BOM
Drawing
Standardization
Pallets
HDR System
TVSM / PED / MSE / MHSE Slide 116
Interplant Movement Facility
Primary container
Trailer
Prime mover
Estimation
- Calculate the No. of facilities required to carryout the process
- Effective utilization of available facilities
Factors to be considered,
• Production volume
• Facility type
• Quantity per container
• No. of shifts (working hours) – Feeder shop & Receiver shop
• Inventory (hours) at Feeder shop & Receiver shop.
Calculation method:
Say,
Production volume (V) – 1200 Nos
Facility type – Trolley
Quantity/container (q) – 14 Nos
Feeder shop: Shift working hours (FS) – 22.5 hr
Inventory hours (FI) – 2 hr
Receiver shop: Shift working hours (RS) – 22.5 hr
Inventory hours (RI) – 3.5 hr
= (((V*FI)/FS)/q) Nos
= (((1200*2)/22.5)/14) = 7.61
= (((V*RI)/RS)/q) Nos
= (((1200*3.5)/22.5)/14) = 13.33
= 8 + 14
Examples:
13 Housing head lamp 20 Painting-2 1200 22.5 6.50 347 18 Vehicle assy-1 16 2 150 8 26
Housing head lamp 20 Transit up 1200 22.5 1.00 54 3 Transit dwn 22.5 1 54 3 6
Housing head lamp Total 32
P la s tic p a in tin g
14 Cover front 30 Painting-2 1200 22.5 6.50 347 12 Vehicle assy-1 16 2 150 5 17
Cover front 30 Transit up 1200 22.5 1.50 80 3 Transit dwn 22.5 1.5 80 3 6
Cover front Total 23
15 Cover bottom tail center 25 Painting-2 1200 22.5 6.50 347 14 Vehicle assy-1 16 2 150 6 20
Cover bottom tail center 25 Transit up 1200 22.5 1.00 54 3 Transit dwn 22.5 1 54 3 6
Cover bottom tail center Total 26