Professional Documents
Culture Documents
Jsqcdep
Jsqcdep
prepared by:
Jeremiah Sunga Queddeng
architect + project manager + consultant + master plumber + academe
• 7.3 kg
• 5.52 kg
• 3. 5 kg
• 7.77 kg
• 1.2 x 1.2
• 1.6 x 1.0
• 0.55 x 0.65
• 0.30 x 0.28
• 12’-18’ on center
• 14’-16’ on center
• 12’-14’ on center
• None of the above
• beam only
• slab only
• slab and beam can be poured 1 day apart
• poured on the same day
• Bored Pile
• Sheet Pile
• Isolated footing
• Footings with Tie beams
• Bored Pile
• Sheet Pile
• Isolated footing
• Footings with Tie beams
• Bored Pile
• Sheet Pile
• Isolated footing
• Footings with Tie beams
• Bored Pile
• Sheet Pile
• Lagging
• Driven Pile