Course The general aim of this course is to introduce the principles of measurement,
Description description of items, the interpretation and the understanding of Standard Method of
Measurement of Building Works (SMM) and the documentation use in tendering. The
second part, which is estimating introduces the tendering process, contract system
and different methods of estimating and focuses on the process of building unit rates
of the building trades

Transferable Skills to be an assistant quantity surveyor at construction site/office

Teaching Lectures, Tutorial


Methodologies

CLO
CLO1 Apply the technique of measurement for building works
CLO2 Demonstrate on ethic and value in estimating the building materials , labor,
plant and equipment for building works.
CLO3 Display the skill s of measuring the quantities from work below lowest floor
finishes to super structure for building works.

Pre-Requisite No course recommendations


Courses

Topics
1. Builders Quantities
1.1) Documentation.
1.2) The various documents in common use, drawings, schedules, specification, bill of quantities and
schedule of rates.
1.3) The purpose, usage and importance of each document related to the value and cost.
1.4) Measurement
1.5) Introduction of Quantity Surveying, SMM and measurements. Rules and principles of measurement as
defines in SMM
1.6) Measurement of work below lowest floor finishes.
1.7) Measurement of super structure.
1.8) Measurement of staircase
2. Estimating.
2.1) Introduction to estimating and development cost.
2.2) Interpretation and importance of estimating and roles of an estimator and Identify the development
cost for construction project.
2.3) Estimating practice and process.
2.4) Pre-selection, decision of tender, project appreciation, programming the estimates, collection and
calculation of cost information, estimating the direct costs, calculating on-costs,
2.5) completing cost estimates, final review and estimates reports,
2.6) tender submission and action after submitting a tender.
2.7) Contract and tender.
2.8) Types of contract, tender and quotation.
2.9) Tendering process.
2.10) Decision to tender, preparation of tender documents, contents of tender document, calling of tenders,
tender analysis and report, selection of contractors
2.11) Estimating cost.
2.12) Cost of building materials, labour, plant and equipment, administration and profit.
2.13) Building up rates and quantifying of materials for:
2.14) Machineries and plant.
2.15) Excavation work.
2.16) Formwork.
2.17) Reinforcement.

Faculty Name : FACULTY OF ARCHITECTURE, PLANNING & SURVEYING Start Year : 2018
© Copyright Universiti Teknologi MARA Review Year : 2018
2.18) Concrete.

Faculty Name : FACULTY OF ARCHITECTURE, PLANNING & SURVEYING Start Year : 2018
© Copyright Universiti Teknologi MARA Review Year : 2018
Assessment Breakdown %
Continuous Assessment 60.00%
Final Assessment 40.00%

Details of
Continuous Assessment Type Assessment Description % of Total Mark CLO
Assessment
Writing Test to test on estimating 20% CLO2
Written Report n/a 10% CLO3
Written Report n/a 30% CLO2

Reading List Recommended


Text Ahamad Abdullah, Khairudin Abdul rashid 2004, Pengukuran
Kuantiti Bangunan, 2 Ed., Pearson Prentice Hall Petaling Jaya
Ahamad Abdullah 2006, Anggaran Kos Kerja Bangunan,
Pearson Prentice Hall Petaling Jaya
The Royal Institution of Surveyor Malaysia 2000, Malaysian
Standard Method of Measurement of Building Works, 2 Ed.,
The Royal Institution of Surveyor Malaysia Kuala Lumpur

Article/Paper List This Course does not have any article/paper resources
Other References
Book Ashworth, A., Hogg, K., & Higgs, C. 2013, Willis’s Practice and
Procedure for the Quantity Surveyor , John Wiley and Sons., United Kingdom
Book Greenhalgh, B. 2013, Introduction to Estimating for Construction. ,
Routledge., USA and Canada
Book Lee, S., Trench, W., & Willis, A. 2013, Willis’s Elements of Quantity
Surveying, John Wiley and Sons., United Kingdom
Book Smith, R. C. 2013, Estimating and Tendering for Building Work ,
Routledge., New York
Book Williams, J., & Gedes, S. 2013, Estimating for Building & Civil
Engineering Work , Routledge., USA and Canada
Book Jaafar, M., Mui, L. Y., & Yahaya, I. 2015, Elementary Estimating For
Building Works , Universiti Sains Malaysia, Pulau Pinang

Faculty Name : FACULTY OF ARCHITECTURE, PLANNING & SURVEYING Start Year : 2018
© Copyright Universiti Teknologi MARA Review Year : 2018

You might also like