Professional Documents
Culture Documents
CITY ADMINISTRATION
URBAN INSTITUTIONAL & INFRASTRUCTURE DEVELOPMENT PROGRAM (UIIDPI)
MONITORING, EVALUATION & REPORTING SYSTEM FOR UIIDP FOR ULG LEVEL: TRIAL VERSION: MAY 2019
TABLE OF CONTENTS
SHEET NO CONTENTS
1 MUNICIPAL REVENUES
2 INFRASTRUCTURE INDICATORS
3 OPERATIONS & MAINTENANCE (O & M)
4 CIPs, UTILIZATION RATES & MATCHING FUNDS
5 CAPACITY BUILDING PLANS (CBPs)
6 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM & RESETTLEMENT SYSTEM (ESMS & RS)
7 PROCUREMENT STATUS
8 PROCUREMENT COMPLAINTS
9 GRIEVANCES
10 FRAUD & CORRUPTION
11 STAFFING OF ULG FOCAL PERSONS TEAM
12 JOB CREATION: TEMPORARY JOBS CREATED UNDER UIIDP SUPPORTED - INFRASTRUCTURE WORKS
13 JOB CREATION: PEOPLE EMPLOYED IN FIRMS PROVIDED WITH SERVICED LAND & MSE SHEDS UNDER UIIDP
14 URBAN RESILIENCE: ULGs THAT HAVE ESTABLISHED EMERGENCY RESPONSE UNIT, PREPARED RISK MAPS AND PREPARED EMERGENCY RESPONSE PLANS
15 GENDER MAINSTREAMING
16 URBAN PLANNING: STRUCTURE PLANS
17 LAND MANAGEMENT - LAND RELEASED FOR DIFFERENT USES AND HAVE ACCESS TO BASIC INFRASTRUCTURE FACILITIES I.E. ROAD, WATER, ELECTRICITY AT A RADIUS OF 250 METRES
26. Monthly Engineering Standard Report
BR MARKOS ITY AMINISTRATION
Sub Total
2 MS Shade
No Phy
2.1 Micro shade kebele 10/BIRET
ETB Fin
No Phy
2.2 Micro shade kebele 10/FOOD
ETB Fin
Sub Total
3 Drainage
M Phy
Endemata school upper end to Wuseta
3.1 river(admas admas) ETB Fin
Ato teshome getahun residence to Wuseta M Phy
3.2 river ETB Fin
5 Toilets
Blocks Phy
5.1 public toilete kebele 01 ETB Fin
Blocks Phy
5.2 public toilete kebele 02 ETB Fin
Blocks Phy
5.3 public toilete kebele 05 ETB Fin
Sub Total
B Non UIIDP Projects
Other Project
Other Project
no Phy
Gravel Bus stop kebele 10 ETB Fin
Maintainance
1 Gravel Road Maintainance
M Phy
1.1 from stadiom to dinich tera cobbel road
ETB Fin
2
Drainage Maintenance
M Phy
from commercial bank to teshome residence
2.1 ETB Fin
from police camp condeminiom drainage to M Phy
bizu mill
2.2 ETB Fin
D/M derek koshasha masewgja(solid west) No Phy
2.3 kebele 05 ETB Fin
No Phy
D/M cinima maintenance kebele 02
2.4 ETB Fin
No Phy
public liberary maintenance kebele 05
2.5 ETB Fin
Consultancy service
3
asphalte design and supervision No Phy
consaltances from poly technique colledge
3.1 to B/dar aspalt ETB Fin
enviromental impact assessement for
asphalte road consultation from technique No Phy
3.2 coledge to B/dar aspalt ETB Fin
MINISTRATION
Contract Annual Physical Physical and Physical and Physical and Physical and Time
Completion and Financial Financial Financial Financial Financial Elapsed in
date Plan achievement achievement Achievement Achievement %
(mm/dd/yyyy this month todate in % to date in % to date
) from annual from the
Plan Contract
490.00
4,500,658.00
440.00
4,351,114.00
794.00
4,950,000.00
425.00
2,167,847.10
410.00
5,067,062.60
786.00
4,913,000.00
250.00
3,000,000.00
1
1,222,861.50
1
1,222,861.50
425.00
2,167,847.10
586.00
2,300,000.00
570.00
2,254,008.88
2,500.00
7,700,000.00
600.00
15,000,000.00
100.00
1,900,000.00
1.00
1,075,552.30
1.00
1,075,552.30
1.00
1,075,552.30
330.00
2,000,000.00
1,800.00
33,298,557.00
3.00
3,499,100.00
757.00
1,700,000.00
2,600.00
7,495,001.00
600.00
941,804.00
400.00
340,001.00
1.00
700,000.00
1.00
900,000.00
1.00
100,000.00
Comments/
Contractual
Problems faced
Name of UIIDP:
For the Month of _____________ / Year of_________
Prepared By:
Checked By:
Prepared By: -
Checked By:-
_ / Year of_________ summary
Achievement Performance
Percent Percent
Achieve- Achieve-
Planned Actual ment Planned Actual ment
S/N Name of Project Kilometers Kilometers % KilometersKilometers %
1 #DIV/0! #DIV/0!
2 #DIV/0! #DIV/0!
3 etc #DIV/0! #DIV/0!
Total for ULG #DIV/0! #DIV/0!
in Birr
Serviced land for industry, MSE Drains built or rehabilitated Public parks and greenery built or
sheds and housing under UIIDP under UIIDP rehabilitated under UIIDP.
Planned
Collectio
n
Percent Percent Vehicles
Achievem Achievem (skipload Actual
Actual Planned Actual ent. ent. ers, Collectio Planned Actual
Water Standpipe Standpipe Water Standpipe trailers n Transfer Transfer Planned
Meters s s Meters s carts etc) Vehicles stations stations Skips
Number Number Number % % Number Number Number Number Number
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
Solid Waste
Percent Percent
Achievem Achievem
ent. ent. Percent
Actual Collectio Transfer Achievem
Skips n vehicles stations ent. Skips
Number % % %
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
#DIV/0! #DIV/0! #DIV/0!
24. QUALITY OF INFRASTRUCTURE: VALUE FOR MONEY AUDIT
24.1. Quality of Infrastructure: Proportion of recommendations of previous VfM Audit addressed