You are on page 1of 1

Fiix Test Drive

[FIIX] Planned Maintenance List Per Site


This report was run on: Jul 06, 2022 01:10:33 AM
with the following parameters
Parent Asset: "All"
Maintenance Type: "All"
Assets Code Description Schedule Description Status Time Est Hours
Electric Stacker (TMF-RD-ES), Inverter SM7 weekly calibration needed Every 18 hour(s) Active 663.00
Generator (TMF-RD-IG), Machine Press (TMF-
RD-MP), Multimedia Projector (TMF-HO-BR),
Split Heating and Cooling Pump (TMF-HO-AO-
SSHP)
Task Description Assigned to Time Est Hours Group Name Nesting Multiplier
(labor) Test User 1.00
Check drive belt tension 1.00 Motor Weekly Inspection
Realign the motor 1.50 Motor Weekly Inspection
(labor) Test User
Realign the motor 1.00 Separator Weekly PM Checklist
(labor) Test User 600.00
Grease the motor bearings 0.75 Separator Weekly PM Checklist
Grease the shaft bearings 2.00 Separator Weekly PM Checklist
(labor) Test User 2.00
Change oil 0.20 Generator Maintenance
Change plug and filters every 200 ph 0.20 Generator Maintenance
(labor) Test User 2.00
Check batter Charge 0.10 Generator Maintenance
Restart generator every 30 days and allow it to run for a few minutes. 0.50 Generator Maintenance
(labor) Test User 4.00
(labor) Test User 8.00
(labor) Test User 6.00
Grease the bearings 2.00 Centrifuge Annual PM Checklist
Check for damage 0.50 Centrifuge Annual PM Checklist
Replace seals 0.50 Centrifuge Annual PM Checklist
General wipedown of system 0.50 Centrifuge Annual PM Checklist
(labor) Michael 1.00
(labor) Test User
(labor) Tech 4.00
(labor) Randy Test 1.00
(labor) Test User
(labor) Test User
(labor) Michael
(labor) Test User 5.00
(labor) Test User
Open each hatch and inspect teeth for misalignment 0.50 Dryer Monthly PM Checklist
General wipedown of system 1.00 Dryer Monthly PM Checklist
Grease the motor bearings 0.25 Dryer Monthly PM Checklist
Clean the rollers 1.00 Extractor Daily PM
Grease the bearings 1.50 Extractor Daily PM
(labor) Test User
Change oil 0.20 Generator Maintenance
Change plug and filters every 200 ph 0.20 Generator Maintenance
Check batter Charge 0.10 Generator Maintenance
Restart generator every 30 days and allow it to run for a few minutes. 0.50 Generator Maintenance
(labor) Tech 3.00
General wipedown of system 1.75 Separator Monthly PM Checklist
Check drive belt tension 1.00 Motor Weekly Inspection
Grease the motor bearings 0.75 Separator Monthly PM Checklist
(labor) Test User - Spanish 2.00
Realign the motor 1.50 Motor Weekly Inspection
Grease the shaft bearings 2.00 Separator Monthly PM Checklist
(labor) Test User 1.00

Page 1 of 1

You might also like