Dear Sir
1. Khulna Shipyard Limited will procure Spare Parts for CNC Cutting Machine (Hypertherm MAX
200) as per following specification, terms & condition:
Item Description Part no. Qty
(Hypertherm)
1.1 Chopper Replacement Kit (CH130 CE & wire) 129118 04 Pcs
1.2 Hard Drive, 250 GB SATA 228814 04 Pcs
Brand: Hypertherm Micro EDGE pro
1.3 Plasma THC Sensor cable 04 Pcs
NPN system, 12mm dia
1.4 Nozzel 020608 300 Pcs
MAX200/HT 2000
Shielded-Air/H35/AR/H2
200A, US patent (s)
1.5 MAX 200 Electorde, 220021 300 Pcs
200A, U.S Patent (s)
1.6 Retaining cap, Max200, 120837 50 Pcs
100A-200A
Cutting/Bevel. U.S Patent (s)
1.7 Swirl Ring, Max 200 020607 50 Pcs
N2/AIR/H35, 100/200A,
U.S Patent (s)
1.8 Shield 020424 300 Pcs
Max200/HT 2000
02/Air/N2, US patent (s)
1.9 PTHC-2 02 Pcs
Plasma Torch Height Controler
Heavth science and Technic Co. Ltd.
1.10 Torch Coolant 30% PG Mixture 12 US
Brand: Hypertherm Gallon
2. a) Please send your offer CFR at Chattogram Port within 28/11/2022 (1500 Hours) by e-mail or
closed envelop.
b) Insurance will be covered by this organization.
c) Payment: Payment will be made through L/C. 80% of the total contract value will be paid
against shipping documents and rest 20% will be paid after receiving the material at KSY
and satisfactory acceptance.
d) Shipment: 20 days from the opening date of L/C.
OR,
P.T.O.
a) Please send your offer as a local supply items. Offer should include supply of materials at KSY
site including custom duty, local vat & tax etc.
b) Payment: 100% payment will be made after receiving the material at KSY and satisfactory
acceptance after deducting of VAT and TAX.
c) Items to be delivered within 45 days from the date of Purchase Order at KSY site.
3. 1% (one) Bid Bond/Earnest Money of the total quoted value must be submit with offer. Bid Bond
may be Pay Order / Bank Guarantee in favour of Khulna Shipyard Limited, Khulna.
4. Foreign supplier will be able to participate directly without submitting bid bond/earnest money and
PG. In that case payment will be made through L/C. 70% of the total contract value will be paid
against shipping documents and rest 30% will be paid after receiving the material at KSY and
satisfactory acceptance.
5. 10% Performance Guarantee (PG) is to be submitted before Purchase Order. This PG will release
after receiving the material and satisfactory acceptance by KSY.
7. The price of 10 items should be mentioned together in the offer. Split items price will not be
accepted.
Yours sincerely