You are on page 1of 2

SN829 Steel, 1 floor

SN829 Stål, 1 sal


Supervision Note/Tilsynsnotat 203D_Steel constructions Steel structures raw house

Project Purification Plant V Work package Facility_WP-203E_Structure of Tank Farm

Inspection plan 203D_Stålkonstruktioner Workflow Tilsynsnotat Supervisory note


Group heading Stålkonstruktioner råhus Date created Sep 22 2022, 2:41 PM

3 Montage af stålkonstruktioner,
Subheading Deadline Sep 22 2022
gitterdrager, søjler, bjælker, vindkryds

3 Assembly of steel structures, grid Created by Diego stougaard, NNE A/S


girders, columns, beams, windbreaks Responsible (Approved, closed)

Building Critical for HO A - Affects operations and/or safety

Sub Area Group Participants

Sep 22 2022, 2:41 PM Created by: Diego stougaard, NNE A/S Please straighten
Assigned to NCC the steel beam so
Assignee: Kasper Colmorn, NCC

Title: Stål, 1 sal that it sits in the


center lines.
Deadline: Sep 22 2022

Description: Ret venligst stål bjælken så den sidder i centerlinjer.

1.1, 2022-09-22, 13.13 1.3, 2022-09-22, 13.13

1.2, 2022-09-22, 13.14

Sep 23 2022, 8:41 AM Updated by: Kasper Colmorn, NCC


Reported ready by NCC
New assignee: Diego stougaard, NNE A/S

Description: Er rettet

Dalux Field Is corrected Printed Nov 7 2022, 5:16 AM


  Anjali Dahiya

Page 1 of 2
SN829 Stål, 1 sal
Supervision Note/Tilsynsnotat

Sep 26 2022, 8:49 AM Updated by: Diego stougaard, NNE A/S


Approved by NNE A/S
Description: fremsend venligst billeder på rettelser.

  Please send pictures of


corrections.

Dalux Field Printed Nov 7 2022, 5:16 AM


Anjali Dahiya

Page 2 of 2