BV Box Tapping
BV Box Tapping
Beton lantai kerja , K-125 1.40 1.00 0.05 1.000 0.07 m3 0.07 0.07 100
Sub total 0.07 m3
4
8 2 8 1
Beton Pondasi Trush Block, K-225 0.20 0.20 0.20 1.00 0.01 m3 0.01 0.01 100
1 5 Sub total 0.01 m3
Beton Penutup, K-225 1.40 1.00 0.10 1.00 0.14 m3 0.14 0.14 100
Sub total 0.14 m3
item kg/m
Tulangan Beton Penutup d10-100, arah x 0.90 14.00 1.00 0.617 7.77 kg 7.77 7.77 100
d10-100, arah y 1.35 10.00 1.00 0.617 8.33 kg 8.33 8.33 100
Sub total 8.33 kg
2 1
Bekistingl Beton Penutup 1.40 1.00 1.00 1.40 m2 1.40 1.40 100
Sub total 1.40 m2
l w h
Pas. Bata Merah 4.80 2.20 1.00 10.56 m2 10.56 10.56 100
Sub total 10.56 m2
Beton lantai kerja , K-125 1.20 1.00 0.05 1.000 0.06 m3 0.06 0.06 100
10
Sub total 0.06 m3
8 6
11 Pemadatan tanah - m3 - -
11 10 9 7 Sub total - m3
Bekistingl Beton Penutup 1.20 1.00 1.00 1.20 m2 1.20 1.20 100
Sub total 1.20 m2
l w h
Pas. Bata Merah 4.40 2.20 1.00 9.68 m2 9.68 9.68 100
Sub total 9.68 m2
5
Beton lantai kerja , K-125 1.80 1.20 0.05 1.000 0.11 m3 0.11 0.11 100
4
8 1 3
Sub total 0.11 m3
8
7 2 1 Buangan Tanah 4.80 m3 4.80 4.80 100
Sub total 4.80 m3
Beton Pondasi Trush Block, K-225 1.14 0.20 0.20 1.00 0.05 m3 0.05 0.05 100
Sub total 0.05 m3
Beton Penutup, K-225 1.80 1.20 0.10 1.00 0.22 m3 0.22 0.22 100
Sub total 0.22 m3
item kg/m
Tulangan Beton Penutup d10-100, arah x 1.15 18.00 1.00 0.617 12.77 kg 12.77 12.77 100
d10-100, arah y 1.75 12.00 1.00 0.617 12.95 kg 12.95 12.95 100
Sub total 12.95 kg
Bekistingl Beton Penutup 1.80 1.20 1.00 2.16 m2 2.16 2.16 100
Sub total 2.16 m2
l w h
Pas. Bata Merah 6.00 2.20 1.00 13.20 m2 13.20 13.20 100
Sub total 13.20 m2
Beton Penutup, K-225 1.00 0.85 0.10 1.00 0.09 m3 0.09 0.09 100
Sub total 0.09 m3
10 8 6 5
7 item kg/m
4
Tulangan Beton Penutup d10-100, arah x 0.95 10.00 1.00 0.617 5.86 kg 5.86 5.86 100
d10-100, arah y 0.80 8.00 1.00 0.617 3.95 kg 3.95 3.95 100
Sub total 3.95 kg
Bekistingl Beton Penutup 1.00 0.85 1.00 0.85 m2 0.85 0.85 100
Sub total 0.85 m2
l w h
Pas. Bata Merah 3.70 1.02 1.00 3.77 m2 3.77 3.77 100
Sub total 3.77 m2
1 2 4 5 6 6 5 9 8 10
1
2
6
14
10
7 6 5 9
11
12
11 11
8
TAPPING GRUPUK
1 Skal a: 1:30
4
2
3
3 1 2 1
1
9
4
10
5
6
7
8 8
7
WASH OUT 250 ASSESSORIES Size Volume Satuan
1 Stube End Flange ND 250 3.00 bh 3.00 3.00 100
2 Gate Valve ND 250 1.00 bh 1.00 1.00 100
3 Tee PE 250x250 ND 250 1.00 bh 1.00 1.00 100
4 Reducer 250x150 ND 250 1.00 bh 1.00 1.00 100
5 Gate Valve ND 150 1.00 bh 1.00 1.00 100
6 Flange Socket ND 150 1.00 bh 1.00 1.00 100
7 Pipa PVC ND 150 24.00 m 24.00 24.00 100
8 Elbow PVC ND 150 2.00 bh 2.00 2.00 100
9 Flange Las ND 250 1.00 m 1.00 1.00 100
10 Flange Las ND 150 1.00 bh 1.00 1.00 100
CATATAN: