Professional Documents
Culture Documents
TEAM
FLARE BURNPIT AREA Revision: 00
3 EL. = +5.00m
0.150
1
0.150
Emb 1
Emb 2 Emb 2
EL. = +1.00m
SABKAH
GEOTEXTILE
SECTION
Marl
Compacted Base
Compacted Fill
Sabkah Soil
1.0 AREA
Embankment on Top Calculated in Autocad (see attached dwg.) = 122347.00 m2
Embankment on Slope Calculated in Autocad (see attached dwg.) = 86063.00 m2
TOTAL AREA = 208410.00 m2
3.0 GEOTEXTILE
Area on Top = 122347.00 m2
Area on Slope = 86063.00 m2
TOTAL AREA = 208410.00 m2