CRFI》contractor request for inspection MIR》material inspection request IFC》issue for construction EI》engineer instruction SD》 shop drawing ASBD》as built drawing JSI》job site instruction ITP》inspection test plan PAC..provisional acceptance certificate FAC final acceptance certificate ITL = Independent Testing Laboratory Cpi =cost performance index SI = SITE INSTRUCTIONS TQ= TECHNICAL QUREY LPO: local purchase order *ITP: inspection test plan *TPI:Third party inspection *LOI: letter of intent *C.O: confirmation order *MAS: Material approval submittal *L/C: letter of credit *CDC: current date cheque *PDC: post dated cheque Inspection Plan =IP Test Sample Request =TSR Work Request=WR Material Issue Voucher =MIV site material requisition=SMR Field Inspection Notice =FIN Inspection and Test Plans =ITP Piping and instrumentation diagram=P&ID NCR = non conformance report. RFI = Request for information. CL = Check list or IR = Inspection request. MDN = material delivery note. JSI = Job site instructions. SR = Safety report. Tr = Transmittal. TCS = technical comparison sheet. CCS = Cost comparison sheet .QA/QC Quality Assurance Quality Control QS Quantity surveyor BOQ Bill Of Quantity LOI Letter Of Intent PQP Project quality plan ITP Inspection test plan HSEP Health safety and environment plan JV Join venture PB Performance bond TB Tender bond CAR Contractor all risk RFMA = Request for material approval RFQ = Request for quotation RFV = Request for variation VO = Variation order SF = Submittal form TQ = Technical query DSR = Daily site report MOM = Minutes of meeting SWI = Site work instructions PMI = Project manager instructions RAS = Request for alternatives or substitution MDC = Material deliveries checklist RFI = Request for inspection NCR = Non conformance report SVN = Safety Violation notice