Abbreviations related to QHSE at Site.

Drawings: CRFI: Contractor Request for Inspection


SD: Shop Drawing MIR: Material Inspection Request
ASBD: as-built drawing EI: Engineer Instruction
IFC: Issue for Construction TPI: Third Party Inspection
GFC: Good for Construction MAS: Material Approval Submittal
P&ID: Piping and Instrumentation Diagram IP: Inspection Plan
GAD: General Arrangement Drawing TSR: Test Sample Request
PFD: Process Flow Diagram WR: Work Request
MIV: Material Issue Voucher
Contracts/Tender
SMR: Site Material Requisition
BOQ: Bill Of Quantity
FIN: Field Inspection Notice
VO: Variation Order
RFI: Request for Information.
WO: Work Order
CL: Check List
LOI :Letter Of Intent
IR: Inspection Request.
TB :Tender Bond
MDN: Material Delivery Note.
Accounts/Purchase MAS: Material Approval Sheet
L/C: Letter of Credit HAZOP: Hazard and Operability Analysis
CDC: Current Date Cheque HAZID: Hazard Identification
PDC: Post Dated Cheque SIMOPS: Simultaneous Operations
LPO: Local Purchase Order PL: Punch List
CPI: Cost Performance Index WPS: Welding Procedure Specification
RFQ: Request for Quotation PQR: Procedure Qualification Record
CCS: Cost Comparison Sheet JSI: Job Site Instructions
LOI: letter of Intent MS: Method Statement
CO: Confirmation Order HIRA: Hazard Identification & Risk Assessment
CAR: Contractor All Risk JSA: Job Safety Analysis
LPO:Lowest Purchase Order TCS: Technical Comparison Sheet.
QA/QC Quality Assurance Quality Control
Certificates PQP: Project Quality Plan
MTC: Mill Test Certificate ITP: Inspection and Test Plan
PAC: Provisional Acceptance Certificate CVI: Conformation of Verbal Instructions
FAC: Final Acceptance Certificate HSEP: Health Safety and Environment Plan
TOC: Taking Over Certificate PB: Performance Bond
Reports RFMA: Request for Material Approval
DSR: Daily Site Report RFV: Request for Variation
WPR: Weekly Progress Report SF: Submittal Form
DPR : Daily Progress Report TQ: Technical Query
SR: Safety Report SWI: Site Work Instructions
NCR: Non-Conformance Report. PMI: Project Manager Instructions
RAS: Request for Alternatives or Substitution
Meetings MDC: Material Deliveries Checklist
MOM: Minutes of Meeting RFI: Request for Inspection
SWM: Site Walkdown Meeting SVN: Safety Violation Notice
PIM: Pre-Inspection Meeting CAPA: Corrective Action and Preventive Action
MRM: Monthly Review Meeting BOM: Bill of Materials
Miscellaneous WIR: Work Inspection Request
JSI: Job Site Instruction IFI: Issue for Information
ITP: Inspection Test Plan MTV: Material Transfer Voucher
ITL : Independent Testing Laboratory LOA: Letter of Acceptance
SI: SITE INSTRUCTIONS QAN: Quality Action Notes.