You are on page 1of 9

Dialog E&C Sdn Bhd Schedule 2 : Bills of Quantities (Base case)

Pengerang Deepwater Terminal Project Bill No. 3A


Contract for Marine Facilities (Jetty 2) & Associated Dredging

Item Amount
Description Unit
No. (RM)

BILL NO.3A MAIN TRESTLE (SECOND SECTION) & OUTER ARM WEST

LUMP SUM WORKS

OPTIONAL ITEMS

TRESTLE PROTECTION JETTY 1

1.0 PILING WORKS

Supply and Deliver 750mm OD grade 50 tubular steel pile complying to BS5950

A 19mm thick Item

Handling and Pitching 750mm OD tubular steel pile; including cutting off pile to pile
cut off level

B Vertical Pile Item

Driving of 750mm OD tubular steel pile including extra over for any pre-boring

C 19mm thick; vertical pile Item

Surface Protection

D Protective coating to external surface of the tubular steel pile as indicated on the
Drawings and Specifications Item

E Wrapping by Denso Tape/25mm HDPE Sleeve as corrosion protection to external


surface of the tubular steel pile as indicated on the Drawings and Specifications Item

F Cathodic Protection to external surface of the tubular steel pile as indicated on the
Item
Drawings and Specification

Total Carried to Collection Page

Bill 3A /1 of 9
Dialog E&C Sdn Bhd Schedule 2 : Bills of Quantities (Base case)
Pengerang Deepwater Terminal Project Bill No. 3A
Contract for Marine Facilities (Jetty 2) & Associated Dredging

Item Amount
Description Unit
No. (RM)

BILL NO.3A MAIN TRESTLE (SECOND SECTION) & OUTER ARM WEST

OPTIONAL ITEMS

TRESTLE PROTECTION JETTY 1

1.0 PILING WORKS (CONT'D)

Filling material into the 750mm OD tubular steel piles; including removing
excessive soil and filling with the following material: -

A Type RC3 concrete (without reinforcement) Item

Type RC3 reinforced concrete (reinforcement measured separately) as plug / fill to


B Item
pile head

Type RC3 reinforced (reinforcement measured separately) concrete as plug / fill to


C Item
pile toe

High tensile steel reinforcement to Type RC3 (tremie) reinforced concrete plug /
infill to: -

D To pile head Item

E To pile toe Item

Pile Test Works

F Dynamic load testing for tubular steel piles Item

Total Carried to Collection Page

Bill 3A /2 of 9
Dialog E&C Sdn Bhd Schedule 2 : Bills of Quantities (Base case)
Pengerang Deepwater Terminal Project Bill No. 3A
Contract for Marine Facilities (Jetty 2) & Associated Dredging

Item Amount
Description Unit
No. (RM)

BILL NO.3A MAIN TRESTLE (SECOND SECTION) & OUTER ARM WEST

OPTIONAL ITEMS

TRESTLE PROTECTION JETTY 1

2.0 STRUCTURAL STEEL WORKS

Supply and Install the structural steel ship arrestor complete with all the necessary
A Item
fixtures and fittings as per detail Drawings

3.0 OTHER ITEMS

Note: Tenderer to include full description and related price of any item or sub-items
as referenced in the Drawings and Specifications required for the Piling and
B Item
Structural Steel Works that the Tenderer has not priced In the above Schedule. To
be completed as required by the Tenderer

Total Carried to Collection Page

Bill 3A /3 of 9
Dialog E&C Sdn Bhd Schedule 2 : Bills of Quantities (Base case)
Pengerang Deepwater Terminal Project Bill No. 3A
Contract for Marine Facilities (Jetty 2) & Associated Dredging

Item Amount
Description Unit
No. (RM)

Bills of Quantities

BILL NO.3A MAIN TRESTLE (SECOND SECTION) & OUTER ARM WEST

OPTIONAL ITEMS

PILING WORKS

From Page

TRESTLE PROTECTION JETTY 1

1.0 Piling

Bill 3A/1 …………………………

Bill 3A/2 …………………………

2.0 Structural Steel Works

Bill 3A/3 …………………………

3.0 Other Items

Bill 3A/3 …………………………

Total Carried to Summary Page

Bill 3A /4 of 9
Dialog E&C Sdn Bhd Schedule 2 : Bills of Quantities (Base case)
Pengerang Deepwater Terminal Project Bill No. 3A
Contract for Marine Facilities (Jetty 2) & Associated Dredging

Item Amount
Description Unit
No. (RM)

BILL NO.3A MAIN TRESTLE (SECOND SECTION) & OUTER ARM WEST

LUMP SUM WORKS

OPTIONAL ITEMS

TRESTLE PROTECTION JETTY 2

1.0 PILING WORKS

Supply and Deliver 750mm OD grade 50 tubular steel pile complying to BS5950

A 19mm thick Item

Handling and Pitching 750mm OD tubular steel pile; including cutting off pile to pile
cut off level

B Vertical Pile Item

Driving of 750mm OD tubular steel pile including extra over for any pre-boring

C 19mm thick; vertical pile Item

Surface Protection

D Protective coating to external surface of the tubular steel pile as indicated on the
Drawings and Specifications Item

E Wrapping by Denso Tape/25mm HDPE Sleeve as corrosion protection to external


surface of the tubular steel pile as indicated on the Drawings and Specifications Item

F Cathodic Protection to external surface of the tubular steel pile as indicated on the
Item
Drawings and Specification

Total Carried to Collection Page

Bill 3A /5 of 9
Dialog E&C Sdn Bhd Schedule 2 : Bills of Quantities (Base case)
Pengerang Deepwater Terminal Project Bill No. 3A
Contract for Marine Facilities (Jetty 2) & Associated Dredging

Item Amount
Description Unit
No. (RM)

BILL NO.3A MAIN TRESTLE (SECOND SECTION) & OUTER ARM WEST

OPTIONAL ITEMS

TRESTLE PROTECTION JETTY 2

1.0 PILING WORKS (CONT'D)

Filling material into the 750mm OD tubular steel piles; including removing
excessive soil and filling with the following material: -

A Type RC3 concrete (without reinforcement) Item

Type RC3 reinforced concrete (reinforcement measured separately) as plug / fill to


B Item
pile head

Type RC3 reinforced (reinforcement measured separately) concrete as plug / fill to


C Item
pile toe

High tensile steel reinforcement to Type RC3 (tremie) reinforced concrete plug /
infill to: -

D To pile head Item

E To pile toe Item

Pile Test Works

F Dynamic load testing for tubular steel piles Item

Total Carried to Collection Page

Bill 3A /6 of 9
Dialog E&C Sdn Bhd Schedule 2 : Bills of Quantities (Base case)
Pengerang Deepwater Terminal Project Bill No. 3A
Contract for Marine Facilities (Jetty 2) & Associated Dredging

Item Amount
Description Unit
No. (RM)

BILL NO.3A MAIN TRESTLE (SECOND SECTION) & OUTER ARM WEST

OPTIONAL ITEMS

TRESTLE PROTECTION JETTY 2

2.0 STRUCTURAL STEEL WORKS

Supply and Install the structural steel ship arrestor complete with all the necessary
A Item
fixtures and fittings as per detail Drawings

3.0 OTHER ITEMS

Note: Tenderer to include full description and related price of any item or sub-items
as referenced in the Drawings and Specifications required for the Piling and
B Item
Structural Steel Works that the Tenderer has not priced In the above Schedule. To
be completed as required by the Tenderer

Total Carried to Collection Page

Bill 3A /7 of 9
Dialog E&C Sdn Bhd Schedule 2 : Bills of Quantities (Base case)
Pengerang Deepwater Terminal Project Bill No. 3A
Contract for Marine Facilities (Jetty 2) & Associated Dredging

Item Amount
Description Unit
No. (RM)

Bills of Quantities

BILL NO.3A MAIN TRESTLE (SECOND SECTION) & OUTER ARM WEST

OPTIONAL ITEMS

PILING WORKS

From Page

TRESTLE PROTECTION JETTY 2

1.0 Piling

Bill 3A/5 …………………………

Bill 3A/6 …………………………

2.0 Structural Steel Works

Bill 3A/7 …………………………

3.0 Other Items

Bill 3A/7 …………………………

Total Carried to Summary Page

Bill 3A /8 of 9
Dialog E&C Sdn Bhd Schedule 2 : Bills of Quantities (Base case)
Pengerang Deepwater Terminal Project Bill No. 3A
Contract for Marine Facilities (Jetty 2) & Associated Dredging

Item Amount
Description
No. (RM)

Bills of Quantities

BILL NO.3A MAIN TRESTLE (SECOND SECTION) & OUTER ARM WEST

Summary of Page Totals

The total of each of the previous pages of Bill No. 3A is to be brought forward and entered below :

Optional Items

Bill No. 3A/5 - Trestle Protection 1

Bill No. 3A/8 - Trestle Protection 2

Total Lump Sum Items Carried forward to Schedule 2 Summary

Bill 3A /9 of 9