Dialog E&C Sdn Bhd Schedule 2 : Bills of Quantities (Base case)

Pengerang Deepwater Terminal Project Bill No. 3


Contract for Marine Facilities (Jetty 2) & Associated Dredging

Item Amount
Description Unit
No. (RM)

BILL NO.3 MAIN TRESTLE (SECOND SECTION) & OUTER ARM WEST

STEEL WORKS

1.0 Main Trestle

1.1 Main Trestle / Passing Loop / Expansion Loop

Trestle Piperack

Take delivery of prefabricated protective painted structural steel pipe rack modules,
complete with preinstalled pipes and install on trestle. Handling and placing shall include
supply of launching equipment and placing the pipe racks by launching and/or the supply of
transportation, cranes, barges, loading pipe rack modules with pipes on to the barges at
the Construction Jetty 1 and protecting and securing the pipe rack and transportation.
Installation work shall include the lifting of pipe rack with pipes from the transportation
barge, installation into the designated positions and to the required tolerance

A Modules taken from the Access Trestle Root Area Item

B Modules taken from the Construction Jetty laydown Area


Item
C Take delivery of Employer supplied prefabricated painted structural steel sections for
piperack and assemble and connect to form in situ piperack sections, including repainting
Item
in accordance with the Specifications of any sections after connection

D Supply and Installation of holding down system for piperack modules and in situ sections
Item

Total Carried to Collection Page

Bill 3 /27 of 49
Dialog E&C Sdn Bhd Schedule 2 : Bills of Quantities (Base case)
Pengerang Deepwater Terminal Project Bill No. 3
Contract for Marine Facilities (Jetty 2) & Associated Dredging

Item Amount
Description Unit
No. (RM)

BILL NO.3 MAIN TRESTLE (SECOND SECTION) & OUTER ARM WEST

STEEL WORKS (CONT'D)

2.0 Outer Arm West

2.1 Trestle Section

Trestle Piperack

Take delivery of prefabricated protective painted structural steel pipe rack modules,
complete with preinstalled pipes and install on trestle. Handling and placing shall include
supply of launching equipment and placing the pipe racks by launching and/or the supply of
transportation, cranes, barges, loading pipe rack modules with pipes on to the barges at
the Construction Jetty 1 and protecting and securing the pipe rack and transportation.
Installation work shall include the lifting of pipe rack with pipes from the transportation
barge, installation into the designated positions and to the required tolerance

A Modules taken from the Access Trestle Root Area Item

B Modules taken from the Construction Jetty laydown Area


Item

C Take delivery of Employer supplied prefabricated painted structural steel sections for
piperack and assemble and connect to form in situ piperack sections, including repainting Item
in accordance with the Specifications of any sections after connection

D Supply and Installation of holding down system for piperack modules and in situ sections Item

Total Carried to Collection Page

Bill 3 /28 of 49
Dialog E&C Sdn Bhd Schedule 2 : Bills of Quantities (Base case)
Pengerang Deepwater Terminal Project Bill No. 3
Contract for Marine Facilities (Jetty 2) & Associated Dredging

Item Amount
Description Unit
No. (RM)

BILL NO.3 MAIN TRESTLE (SECOND SECTION) & OUTER ARM WEST

STEEL WORKS (CONT'D)

2.0 Outer Arm West

2.2 Berth 6204 (Central Platform & Dolphin)

Supply and install steel access walkway painted with protective coating complete with all
necessary fixtures and fittings

A Access Walkway 6204-1 Item

B Access Walkway 6204-2 Item

C Access Walkway 6204-3 Item

D Access Walkway 6204-4 Item

E Access Walkway 6204-5 Item

F Access Walkway 6204-6 Item

G Access Walkway 6204-7 Item

H Access Walkway 6204-8 Item

2.3 Berth 6205 (Central Platform & Dolphin)

J Supply and install steel access walkway painted with protective coating complete with all
Item
necessary fixtures and fittings

Supply and install steel access walkway painted with protective coating complete with all
necessary fixtures and fittings

K Access Walkway 6205-1 Item

L Access Walkway 6205-2 Item

M Access Walkway 6205-3 Item

N Access Walkway 6205-4 Item

P Access Walkway 6205-5 Item

Q Access Walkway 6205-6 Item

R Access Walkway 6205-7 Item

S Access Walkway 6205-8 Item

Total Carried to Collection Page

Bill 3 /29 of 49
Dialog E&C Sdn Bhd Schedule 2 : Bills of Quantities (Base case)
Pengerang Deepwater Terminal Project Bill No. 3
Contract for Marine Facilities (Jetty 2) & Associated Dredging

Item Amount
Description Unit
No. (RM)

BILL NO.3 MAIN TRESTLE (SECOND SECTION) & OUTER ARM WEST

STEEL WORKS (CONT'D)

3.0 Jetty Monitoring Building (Outer & Inner Arm)

Supply and Install the structural steel frame complete with all the necessary including
A Item
fixtures and fittings.

4.0 Fire Pump Station

Supply and Install the structural steel frame complete with all the necessary including
B Item
fixtures and fittings.

5.0 Foam Skid Deck

C Supply and Install Steel for Foam Skid Deck painted 'with protective coating complete with
all necessary 'fixtures and fittings
Item

Total Carried to Collection Page

Bill 3 /30 of 49
Dialog E&C Sdn Bhd Schedule 2 : Bills of Quantities (Base case)
Pengerang Deepwater Terminal Project Bill No. 3
Contract for Marine Facilities (Jetty 2) & Associated Dredging

Item Amount
Description Unit
No. (RM)

BILL NO.3 MAIN TRESTLE (SECOND SECTION) & OUTER ARM WEST

STEEL WORKS (CONT'D)

6.0 Other Items

A Note: Tenderer to include full description and related price of any item or sub-items as
referenced in the Drawings and Specifications required for the Steel Works that the
Item
Tenderer has not priced In the above Schedule. To be completed as required by the
Tenderer

Total Carried to Collection Page

Bill 3 /31 of 49
Dialog E&C Sdn Bhd Schedule 2 : Bills of Quantities (Base case)
Pengerang Deepwater Terminal Project Bill No. 3
Contract for Marine Facilities (Jetty 2) & Associated Dredging

Item Amount
Description Unit
No. (RM)

Bills of Quantities

BILL NO.3 MAIN TRESTLE (SECOND SECTION) & OUTER ARM WEST

STEEL WORKS

Lump Sum Works

From Page

1.0 Main Trestle


Bill 3/27………………………………………………

2.0 Outer Arm West

2.1 Trestle Section


Bill 3/28………………………………………………

2.2 Berth 6204


Bill 3/29………………………………………………

2.3 Berth 6205


Bill 3/30 ………………………………………………

3.0 Jetty Monitoring Building Platform (Inner & Outer)


Bill 3/30 ………………………………………………

4.0 Fire Pump Station


Bill 3/31 ………………………………………………

5.0 Foam Skid Deck


Bill 3/31 ………………………………………………

6.0 Other Items


Bill 3/31 ………………………………………………

Total Carried to Summary Page

Bill 3 /32 of 49