በጌታ ደሳለኝ አጠቃላይ የህንፃ ማጠናቀቂያ ተቀራጭ

BEGETA DESSALGN BUILDING FINISHING CONTRACTOR

SUBJECT:COST OFFERING
We are here to give price quotation for your Residential maintenance
work at Addis Abeba around Lebu muziqa sefer. Our priced quotation
includes the following;
Item Description unit Quantity Unit rate Amount
no rate
1 External paint work M2 890.75 430.00 383,022.50
including service
quarter and fence
Total carried out 383,022.50
2 Internal paint
2.1 Normal paint M2 828.45 110 91,129.25
2.2 Demos paint M2 150.25 470 70,617.50
2.3 Perlatu paint M2 180.50 450 81,225.00
2.4 Gypsum plastering - - - 5000
maintenance
Total summary carried out 252,971.75
3 Compound floor M 2
130.00 200 26,000
paving
Total summary carried out 26,000.00
Grand summary carried out 661,994.25
Table 1.1

Item Description unit Quantity Unit rate Amount


no rate
1 External paint work M2 890.75 430.00 383,022.50
including service
quarter and fence
Total summary carried out 383,022.50
2 Internal paint
በጌታ ደሳለኝ አጠቃላይ የህንፃ ማጠናቀቂያ ተቀራጭ
BEGETA DESSALGN BUILDING FINISHING CONTRACTOR

2.1 Normal paint M2 1,159.75 110 127,572.50


2.4 Gypsum plastering - - - 5000
maintenance
Total summary carried out 132,572.50
3 Compound floor M 2
130.00 200 26,000
paving
Total summary carried out 26,000.00
Grand summary carried out 541,595.00
Table 1.2

NOTICE: -
1. material must supply by both parties, ( client and contactor )
2. For both internal and external paint works contractor must be
supplied all necessary material and skilled labor, but client should be
prepared scaffoldings and form works
3. Of the whole internal paints, some part of it will paint by demos and
peraltu paint, so the price listed on table 1.1. But if the client have not
interested on it, it will be paint by normal paint. Total normal paint
price listed on table 1.2
4. For compound floor paving material supplied by client. The materials
are terrazzo or other paving material, cement, sand and water
5. The Performa given on 3th week of 9th/2014 and valuable for only 20
days
6. Agreement shall be given after commencement
7. Payment should be first 50% , second 30% and finally 20%. And the
charge does not include VAT.