Technical characteristics of the elevator

Vertical section of shaft J-J Parameter name size-characteristics


Serial number 292095
Model TRMR
Type TRACTION
Load capacity, kg / person 630/8
Speed, m / sec 1
Travel, mm 15500
F F
Number of stops / entrances 6/6
Type of load Passengers
Internal Cabin Dimensions (W x D x H) mm 1100x1400x2400
Door Type Automatic
Door Opening (W x B), mm 800x2300
SIMPLEX
Control system
Full Collective
DIRECTIVE 2014/33/EU

HARMONIZED
Head Room 4500

STANDARDS EN81-1/2 , EN81-73

Type of current Variable 3 Phase


Internal Cabin Height 2400
Lintel Height 2580

3x380V
Door Height 2300

Voltage, V
Main switch current, A 20
N N
Power, kW 6.7
Starting current, A 24
Rated current, A 16

BUILDERS WORKS

1. The lift shaft must be constructed to accommodate the loadings indicated on our drawings and with a minimum 7KN high density block.
2. The lift shaft must be plumb-0mm, +25mm over the full length, sizes must comply with our drawing. The lift finished floor level datum must be
marked at each entrance.
Total Height 21500

3. The shaft must comply with the fire and building regulations.
4. To ensure the correct functioning of the equipment in the well and machinery space(s), i.e. taking into account the heat dissipated by the equipment,
the ambient temperature in the well and the machinery space(s) is assumed to be maintained between + 5 °C and + 40 °C.
5. Provide suitable access into building and lift shafts suitable for a component length of 5.0M.
6. The pit must be permanently watertight and the surface must be smooth, level and painted. The concrete base should be designed to take the loads
E E stated on the drawing. The pit depth must be accurate to +/-20mm.
7. Provide pad stones or steel supports where necessary.
8. Provide and fix temporary guards around the lift entrances to comply with health and safety at work act requirements.
9. The front return walls shall be built as shown and finished following the final fixing and positioning of our entrance frames. All recesses shall be
Travel 15500
A

completely filled in,in accordance with our drawing.


10. A lifting beam shall be fixed at the head of lift shaft. The beam shall be tested and certified and marked with the required S.W.L. as shown on our
drawings.
11. Provide scaffolding, planks and ladder within the lift shaft as shown on our drawings (to comply with the local safety officer's requirements).
12. Clear away all builder work debris before, during and after the erection of the lift.
13. The installer will clear lift packaging to a central site skip as provided by builder.
14. A weatherproof area will be provided on site for the storage of lift materials.
15. The lift shaft stagings must be protected with suitable low level kick boards to all sides.
Door 16. Low level kick boards and entrance barriers must be provided across each entrance to Current Regulations. This protection must remain in place until
Floor the landing doors are positioned and made good.
Stop located on Stop level
spacing 17. The well is suitably ventilated, according to national building regulation, taking into consideration the heat output as specified by the manufacturer,
side the environmental conditions of the lift and the limits given in 4, e.g. ambient temperature, humidity, direct sunlight, air quality and air tightness of
g A 0 3100 buildings due to energy saving requirements.
1 A 3100 3100
2 A 6200 3100
3 A 9300 3100
CUSTOMER : TAHSINKO Quotation Number : WQ137099.2
4 A 12400 3100 OBJECT : 102- Kazi Ashraful Haque Jewel Order Number : 56002
5 A 15500 0
Pit 1500

Name Signature Date Page Version


Installation Drawings For
Studied IliasTsaparelis 22/2/2022
G G Designed EmmanouilParharidis 22/2/2022
Traction Lift
1/7 3.0
Checked IliasTsaparelis 22/2/2022

Contract No
Confirmed
Shaft Section E-E Shaft Section N-N C

Shaft Depth
X
D Z W B

Shaft Width

J
445 DBG 1180 145 445 DBG 1180 145

150

150
350

350
815

815
Cabin Depth 1400

Cabin Depth 1400


CW-DBG 1000

CW-DBG 1000
Shaft Depth 1770

Shaft Depth 1770


140 140
4

C.O.P.

C.O.P.
955

955
420

420
360
20 30 70

20 30 70
220

220
50 50

50 50
4

360
356

331

120 120

70 140 345 Door Width 800 300


70 70
485 Cabin Width 1100 185

Door Width 800 185


Door Width 800
140 345 485
140 345 300 365 Structural Width 1040 365
Cabin Width 1100 Shaft Width 1770

485 Cabin Width 1100


415 Structural Width 940 415
Shaft Width 1770

415 StructuralJ Width 940 CUSTOMER : TAHSINKO Quotation Number : WQ137099.2


Order Number : 56002
Shaft Width 1770 OBJECT : 102- Kazi Ashraful Haque Jewel

Page Version
A Studied
Name
IliasTsaparelis
Signature Date
22/2/2022
Installation Drawings For

J
Designed EmmanouilParharidis 22/2/2022
Traction Lift
2/ 7 3.0
Checked IliasTsaparelis 22/2/2022

Contract No
Confirmed
Pit section G-G Cabin Buffer Counterweight buffer
445 DBG 1180 145

40

60
350 F6

1075
815
40
CW-DBG 1000

F2 F4 F1 F3

60
1000

200
Safety space
700

955
500x700x1000
920

F5
420

Load table on the construction part of the


elevator installation
140

Load Name
1035
Load Value(N) Load Points Sketch Notes

Shaft section with axis Fx 658 Pressures on the car

Fx
Fy sling mountings guide
Fy 491

Fx
Fz
Fz 14552
On the cabin buffer on the area of
F1 58209 165x165mm
On the counterweight buffer on the
F2 45848 area of 165x165mm
On the heel of the car sling guides on Loads act at different
F3 16124 the area of ​150x150mm
On the heel of the car sling guides on times and emergency
F4 20489 the area of ​150x150mm
Shaft Axis On the heel of the counterweight
F5 785 guides on the area of ​150x150mm
On the heel of the counterweight
F6 11136 guides on the area of ​150x150mm
Fcx 29 Pressures on the

x
Fc
Fcy Fcy counterweight
205

x
Fc
mountings guide
1770

Fcz
Fcz 0
F7 F7
On the
mountings
shaft door
Constant load
Cabin Axis F7 1500 in the wall
plane
920
885

F7 F7
Door Axis

CUSTOMER : TAHSINKO Quotation Number : WQ137099.2


OBJECT : 102- Kazi Ashraful Haque Jewel Order Number : 56002

Name Signature Date Page Version


Installation Drawings For
Studied IliasTsaparelis 22/2/2022

Designed EmmanouilParharidis 22/2/2022


Traction Lift
3/7 3.0
885
Checked IliasTsaparelis 22/2/2022

1035
Contract No
1770
Confirmed
Mounting Brackets Plan View with Scaffold
350

50

150
1370
1595
Cabin
Guide

Counterweight
Guide

250
125
4x5000
11x2000

495 1080 195

Guide Joint
Scaffold to be erected as shown on the drawing.
First stage 1000mm above ground floor level and
then every 2000mm.

Installation zone of elevator


equipment

CUSTOMER : TAHSINKO Quotation Number : WQ137099.2


OBJECT : 102- Kazi Ashraful Haque Jewel Order Number : 56002

Name Signature Date Page Version


Installation Drawings For
1450

Studied IliasTsaparelis 22/2/2022

Designed EmmanouilParharidis 22/2/2022


Traction Lift
4/7 3.0
Checked IliasTsaparelis 22/2/2022
Guide
500

Bracket Contract No
Confirmed
Machine room section F-F
1770
140 319 1152 159

Monorail 5000Н
111

409
Ø5 0

690
180

300
180
320
1770 180

180

180
180
760

2500
200

2000
Power plug

1500
Machinery
lighting
1200

Light switch
Hatch
2000

Work area
710х750
600

Controller

200 900 900

ELECTRICAL REQUIREMENTS

1. Provide temporary power and lighting during installation of the lift.


2. The lift control panels,which is positioned at the machine room, has an integral 3 phase mains isolator therefore we require 3m
of mains cable to be fitted and glanded by the Main Contractor into our controller.
3. Provide a suitable supply terminating in the machine room. The consumer unit needs to supply the following.
A. 1 x 6amp M.C.B. for the controller socket outlet.
B. 1 x 6amp M.C.B. for lift car light and car top control socket.
C. 1 x 6amp M.C.B. for lift shaft lighting and pit socket outlet.
4. Provide a switched socket outlet in lift pit. (Socket outlet in lift pit to be R.C.D. type).
5. Provide shaft lighting with two way switching from the lift shaft. Lift shaft light switch to be located 1300mm from lowest finished
floor level (no pit floor level) must be easily accessible from landing entrance. NOTE! where permanent power supply is not
available, a temporary dedicate 3-phase supply must be provided. The supply must be available the whole installation period. (A
3-phase generator is acceptable).
6. The power supplies whether temporary or permanent must be available from the commencement date of the installation. The CUSTOMER : TAHSINKO Quotation Number : WQ137099.2
final testing can only de completed using the permanent supply. OBJECT : 102- Kazi Ashraful Haque Jewel Order Number : 56002
7. The natural or artificial lighting of the landings in the vicinity of landing doors shall be at least 50 lux at floor level (this may be
subject to National Building Regulation) Name Signature Date Page Version
Installation Drawings For
Studied IliasTsaparelis 22/2/2022

The above notes are for guidance and any alterations or variations must be agreed by the installer in writing prior to the Designed EmmanouilParharidis 22/2/2022
Traction Lift
5/ 7 3.0
commencement of the contract. Checked IliasTsaparelis 22/2/2022

Contract No
Confirmed
Vertical section of shaft J-J
Schematic diagram of the kinematic

Traction pulley

Suspended
cable
Ø320
Distances with the
cabin at the top

1190
overtravel

1800
1890
500 Grounds
maintenance
Head Room 4500

position on the
1000

700
roof of the car
when stopped in
the "Revision"
Internal Cabin Height 2400

0
Φ32

Cabin
Diverting
pulley
Top Car Overtravel 100

Diverting
pulley
Counterweight
A

C
700
Internal Cabin Height 2400
Bottom Car Overtravel 100

CUSTOMER : TAHSINKO Quotation Number : WQ137099.2


OBJECT : 102- Kazi Ashraful Haque Jewel Order Number : 56002
Pit 1500

Name Signature Date Page Version


Installation Drawings For
791

700 Studied IliasTsaparelis 22/2/2022


500

Designed EmmanouilParharidis 22/2/2022


Traction Lift
6/7 3.0
Checked IliasTsaparelis 22/2/2022
Speed limiter tensioner
Contract No
Confirmed
Main floor on the A side Rest floors Door section L-L Door section K-K
50 K
H 50
L

50
27
300

230

50
2600
Door Height 2300

Door Height 2300


2530
70

300
2650

2580
300
300
1500
900

900

2580

2650
2300
2300
70 Door Width 800 70 120 Door Width 800 120

Structural Width 940


H Structural Width 1040

K L

50
Last floor

Section view of cable


holes H-H

100
Stop Marking
Door Height 2300
2530

Ø40

110

38

100
2580

27
4 360
80 50

20
50
300 50
20
1800

CUSTOMER : TAHSINKO Quotation Number : WQ137099.2


900

OBJECT : 102- Kazi Ashraful Haque Jewel Order Number : 56002


Ø40
1000

Name Signature Date Page Version


Installation Drawings For
Studied IliasTsaparelis 22/2/2022

Designed EmmanouilParharidis 22/2/2022


Traction Lift
7/7 3.0
Checked IliasTsaparelis 22/2/2022

120 Door Width 800 120


Contract No
Structural Width 1040
Confirmed