You are on page 1of 2

Vertical

Vertical Section B A
Section
Section A-A Section B-B

Drive
ACVF
Top Plan
1700

BS=1875
HSK=3650

HSK=3650
Lcar-rail= 3100

Lcar_rail=3100
BK=1400

CBD
HK=2350

HK=2350
HT=2100

200
Drive

GBP

TS=1450
TKSW=780

1100
ACVF COP

TSW=95
Controller LDU

TKS=30
HQ= 18240

on top floor
A=120 BT=800 70 CONSTRUCTIONAL ARRANGEMENT

Permanent Lighting on the top floor Contract No./Lift No.


ceiling adjacent to controller. /
Electric lighting on the basis of at least Type of Lift Schindler 3300 AP
200Lux
at floor level, light switch. Not supplied
Rated Capacity kg Rated Speed m/s
by Schindler.
Rise m No.of Passengers

No. of Stops Stops No. of Lifts

Shaft Motor Power

Max.Starting Current
kW

A
Nominal Current

Heat From Single Elevator kcal/h


A

Plan
1st CWT guide rail length 4985
1st car guide rail length=4985

Main power fuse A/Unit Light power fuse A/Unit


20

Other landings Metal pit ladder from pit


floor. 1500mm above
(Except top landing) FFL of first floor level.
Supplied by Schindler
Load on the following points <N>

BS=1875 53000 31000


CWT. Screen=2250

F1 F5 F9 F18

>=1500
F2 F6 F10 41000
BK=1400 F3 F7 F16 38000
HKP=100

BSK=1025 F4 F8 38000 F17 31000


CLIENT
HGP=100

PROJECT
HSG=1200

HSG=1200
BGS=760

TK=1100
TS=1450

Attention! Do Not Scale This Drawing.

380
Drawing No.
COP
270

HSS1=637
HSS2=125

Page Total
TS=1450 Myanmar Jardine Schindler 2
Limited
TSW=95

Drawing
TKS=30

70 BT=800 70 Review

Approved

Date
B A Modification

Date
ADF version:2012.04.27 by using ADF version
XML data and
3.1_Ae0 SchindlerDraw version:
BY CLIENT
Detail viewH 1. General requirement
Ventilation window with water
Vertical Section Lighting at the top shaft, 3 lifting hooks on ceiling above

100
protected louver on the outside min. 200Lux, Other
F8, F9, F16, with safety working
load (SWL) 20kN, the hooks shall
of the shaft and mesh fixed with floors bottom up min. be labeled SWL 20kN, or a label

150
grid no bigger than 25x25mm 50Lux, distance <=7 adjacent to the hooks. Not
supplied by Schindler
Landing Door Cut Out
from within the shaft. Area is not meters. Distance to

L and Z bracket= 405


150
ceiling <= 500mm. Not
by architect supplied by Schindler
E Section
Top landing

400
Concrete

300
Detail view "H" slab, for
L landing
door fixation

2215 Finished floor level

2215 Finished floor level


Bracket

200
2. Requirements to the power

150
HSK=3650

1100
F.F.L.
Finished

2095
180 floor level

60
E
2185

200
3. Requirements to the shaft

180
is +/-25mm.
600

398 1030 447

Other Floor

400
2000

LIN-H Cutout
Concrete

65
HQ= 18240

110 80 slab, for

225
landing

2215 Finished floor level

2215 Finished floor level


door fixation
Fire Box Cutout, depth
110, on main floor only
EN81-1998
500

1738
150

1100
F.F.L.
Finished
floor level

200
448 980 447
HF2=
1st CWT guide rail length 4985
1st car guide rail length=4985

Pit Plan Shaft light, no more than


500mm above pit floor. Not
supplied by Schindler
Drawing No.
878
Contract No./Lift No.
BS=1875 3 lifting hooks on ceiling above F8,
100
F9, F16, with safety working load
BKS=1460 (SWL) 20kN, the hooks shall be
CLIENT
labeled SWL 20kN, or a label
PROJECT
adjacent to the hooks. Not supplied
HSS2=125

by Schindler
HSG=1200

Page Total
F18 Myanmar Jardine Schindler Limited 1
HSS1=637

F9
TS=1450

Shaft light, no Drawing


more than
500

F16 Review
500mm above F10 F8
340

pit floor. Not Approved


supplied by Metal pit ladder from pit floor.
F17 1500mm above FFL of first floor Date
Schindler
level. Supplied by Schindler Modification

Date

XML data and ADF version:2012.04.27 by using ADF version 3.1_Ae0 SchindlerDraw version: