You are on page 1of 12

公用配电室干式变压器安装工程质量验收表

Quality Acceptance Form for Installation of Dry-type Transformer in Common distribution room

1#公用电气配电室
安装位置
1#Common Electrical 电压等级
Installation 6.3±2*2.5%/0.4KV
distribution room Voltage level
location

中电电气(江苏)变压器制造有限公
型号规格
制造厂家 司
Model SCB-1000/6.3
Manufacturer China Electric Equipment (jiangsu)
Specifications
Transformer Manufacturing CO.,I
单项
结论
工序 性质 质量验收结果
检 验 项 目 质 量 标 准 single
proce chara Quality Acceptance
Test items Quality Standard item
ss cter Results
conclu
sion
铭牌及接线图标志
外壳及 齐全清晰
Nameplate and wiring
附件 Complete and clear
diagram mark
shell
外观检查 无破损、无变形
and
Visual inspection No damage, no deformation
append
绝缘子外观 光滑,无裂纹
ix
Insulator Appearance smooth, no cracks
无碰伤变形,漆膜完好,
表面清洁无异物
No bumps and
本体 外观检查
deformations, the paint film
检查 Visual inspection
is intact, and the surface is
Ontol
clean and free of foreign
ogy
objects
inspe 铁芯
铁芯紧固件检查
ction 检查 紧固,无松动
Core Fastener
Core Tighten without loosening
Inspection
inspecti
铁芯绝缘电阻
on 主控 绝缘良好
Iron core insulation
MC good insulation
resistance
一点接地,
且牢固可靠、导通良好
铁芯接地 主控
One point is grounded, and
Core ground MC
it is firm and reliable, with
good conduction
绕组接线检查
主控 牢固正确
绕组 Winding Wiring
MC firm and correct
检查 Check
Windin 无放电痕迹及裂纹
表面检查
g No discharge traces and
surface inspection
inspecti cracks
on 绝缘电阻 主控
绝缘良好 good insulation
Insulation resistance MC
调压 传动无卡阻,指示正确 The
调压机构 Pressure
装置 transmission is not blocked,
regulating mechanism
Pressur and the indication is correct
e 连接正确 connected
分接头 tap
regulati correctly
ng 连接线 connecting 紧固,无松动 Tighten
device line without loosening
无损伤、
裂纹 No damage or
绝缘层 Insulation
crack
裸露导体外观
主控 无毛刺尖角 No burr sharp
Exposed conductor
MC corners
appearance
裸导体相间及对地距
引出线 离 Bare conductor 符合 GB50149 规定
主控
pinout phase-to-phase and Comply with GB 50149
MC
ground-to-ground regulations
distances
防松件 Anti-loose 主控 齐全、完好 complete,
parts MC perfect
固定牢固、无损伤 Firmly
引线支架 Lead holder
fixed without damage
本体 牢固、可靠 strong and
本体固定 Body fixed
及 reliable
附件 动作可靠,指示正确
温控装置 Temperature control
安 Reliable action, correct
device
装 indication
Body 牢固,转向正确 firm,
风机系统 Fan system
and correct steering
acces
sories 齐全、正确 complete,
相色标志 Color sign
install correct
ation
接 主控 牢固,导通良好 solid, good
外壳接地 case ground
地 MC conduction
groun 主控 牢固,导通良好 solid, good
本体接地 Body ground
d MC conduction
温控器接地 Thermostat ground 用软导线可靠接地,
风机接地 Fan grounding 且导通良好 Reliable
可开启门接地 Openable door to grounding with flexible
ground wire and good continuity
主控 符合设计要求 meet design
中性点接地 neutral ground
MC requirements
验收结论:
Acceptance conclusion:

验收单位签字
The acceptance unit signs

SDTY year month day

RUNH year month day

ACSET year month day

SOMA year month day


公用配电室盘柜安装工程质量验收表
Quality Acccptnnce Form for lnstnllation of Pnnel Cnbinets in Common distribution room

安装位置 1#公用配电室 1#Common


电压等级
Installation Distribution Room 400V
Voltage level
location
型号规格
Model 制造厂家 万洲电气股份有限公司
MNS
Specificatio Manufacturer Worldwide Electric stock Co., Ltd
ns
质量验收
工序 结果 单项
性质
proc 检验项目 Test items 质量标准 Quality Standard Quality 结论 single
character
ess Acceptanc conclusion
e Results
外观 符合设计文件要求 Compliant
型号规格 Model
检查 with design document
Specifications
Visu requirements
al 无损伤、变形、油漆完整 No
设备外观 Appearance of the
inspe damage, deformation, paint
device
ction integrity
盘体固定 plate fixed 主控 MC 牢固 firm
紧固件检查 Fastener 完好、齐全、紧固 perfect,
Inspection complete, tight
镀锌制品或其他防锈蚀制品
紧固件表面处理 Fastener
Galvanized products or other
Surface Treatment
anti-corrosion products

震动场所的防震措施 符合设计文件要求

Anti-vibration measures Compliant with design

for vibration places document requirements

柜内设备型号规格 符合设计文件要求
pl
Cabinet equipment model 主控 MC Compliant with design
at
specifications document requirements
e
柜内设备外观检查
fi 完好、齐全 perfect,
Appearance inspection of
xe complete
equipment in the cabinet
d
熔断器、断路器配置检查 符合设计文件要求
Fuse, circuit breaker 主控 MC Compliant with design
configuration check document requirements
无卡阻、碰撞、闭锁可靠
抽屉推拉试验 Drawer
主控 MC No jamming, collision and
push-pull test
reliable locking
操作灵活、正确可靠
开关操作检查 Switch
Flexible, correct and reliable
Operation Check
operation
盘前后标识 front and rear 完全、清晰 complete and
logo clear
盘、柜内照明检查 Panel
and cabinet lighting 完好 intact
inspection
盘体与基础型钢连接
牢固、导通良好 Firm and
The disc body is connected 主控 MC
good conduction
to the base steel
接 每段盘有两点以上明显接地
有防震垫盘的连接
地 Each segment of the disk has
Connections with
gr more than two points of
anti-vibration pads
ou obvious grounding
nd 装有电器可开启屏门的
用软铜线可靠接地 Reliable
接地 Grounding with
grounding with soft copper
electrical appliances that
wire
can open the screen door
验收结论:
Acceptance conclusion:

验收单位签字
The acceptance unit signs
SDTY year month day

RUNH year month day

ACSET year month day

SOMA year month day

公用配电室盘柜母线安装工程质量验收表
Quality Acccptnncc Form for Bus lnstallntion Worlcs in Common distribution room

安装位置
install 1#公用电气配电室 Common Electrical distribution room
location
质量验收结
工序 检 验 项 目 质 量 标 准 果 单项
性质 结论
Proc Inspection items Quality standards Quality
nature Item
ess acceptance
conclusion
outcome
符合设计文件要求
规格型号检查
Meets design document
Specification model check
requirements
外观 母线表面光洁平整,无裂
检查 纹、折皱、夹杂物
Exter 外观检查 The surface of the busbar is
ior Surface inspect smooth and smooth, without

inspe cracks, wrinkles and
线 ct inclusions
加 外形检查 平直无变形扭曲
工 Shape inspect Straight without
配 deformation and distortion
置 搭接面连接尺寸
moth 主控 符合要求
Lap joint connection
er MC Meets the requirements
螺 dimensions
line 接 搭接面螺孔布置及螺栓规格
add 主控 符合要求
面 Lap surface screw hole
work arrangement and bolt Meets the requirements
matc 加 MC
工 specifications
h
spiral 螺孔间中心距误差
place
pick Error of center spacing between ±0.5mm
up screw holes
face 接触面外观 平整
add Contact surface appearance make level
work 平整,无局部凹陷
接触面平直度
Flat with no local
Flatness of the contact surface
depressions
母线与 外观 无弹簧垫
螺杆形 appearance Springless pads
接线端 平垫圈 铜质搪锡
子连接 Flat washers Copper tin
母线 The
母线
连接 busbar is
安装
Busb connecte
Busb 齐全、紧固
ar d to the 锁紧螺母
ar
conn screw-sh Lock nut Complete,Fastening
mou
ectio aped
nting
n terminal
s
螺栓穿入方向
连接螺 一致
Bolt penetration
栓 unanimous
direction
Connect
the bolts
螺栓紧固后露扣长

主控
Bolt fastening after 2~3 扣
MC
dew fastening
length

螺栓与母线紧固面有平垫
圈,螺母侧有弹簧垫圈或
防松件外观 采用锁紧螺母
Anti-loose parts The bolt and female
appearance fastening surface has a flat
washer, and the nut side has
a spring washer or a lock
nut
多颗螺栓连接时,
相邻垫圈间距
When multiple >3mm
bolts are connected,
the adjacent gaskets
are spaced
母线伸缩节外观 无裂纹、断股和折皱
Busbar telescopic joint No cracks, broken strands
appearance and wrinkles
母线伸缩节截面
≥1.2 倍母线截面
Busbar telescopic section
≥1.2x busbar cross-section
section
相色标识 正确
Phase color identification right
验收结论:
Acceptance conclusion:

验收单位签字
The acceptance unit signs

SDTY year month day

RUNH year month day

ACSET year month day

SOMA year month day


公用配电室二次回路检查工程质量验收表
Quality Acceptance Form for Inspection of Secondnry Circuit in Common distribution room

公用配电室盘柜里面 Inside the panel cabinet in Common distribution room


安装位置
install location

质量验收结果 单项
检 验 项 目 质 量 标 准
工序 性质 Quality 结论
Inspection items Quality standards
Process nature acceptance Item
outcome conclusion
绝缘层完好,无中间接头
导线外观 主控
The insulation is intact and
Wire appearance MC
there is no intermediate head
配线连接 主控 牢固、可靠
Wiring connections MC Sturdy,reliable

清晰正确,且不易脱色
导线端头标志
Clear and correct, and not easy
内 Wire end marking
to decolorize
电流回路截面积

Cross-sectional area of the ≥2.5mm2
current loop
线
信号、电压回路截面积
tray
Cross-sectional area of signal ≥1.5mm2
inside
and voltage loops
match
弱电回路截面积
line
Weak current loop ≥0.5mm2
cross-sectional area
多股软铜线
用于可动部位的导线 主控
Multiple strands of soft copper
Wires for movable parts MC
wire
符合设计文件要求
控 控制电缆接引
Meets design document
Control cable leading
制 requirements
松紧适当,固定牢固、匀

导线束的绑扎、固定 称,形式一致
缆 Binding and fixing of wire Appropriate tightness, firm
harnesses fixation, symmetry,

consistent form
线 每个接 螺栓连接 不超过两芯并加垫片
主控
线端子 Bolted Do not exceed two cores
Control MC
并接芯 connections and add a gasket
system 数 插接连接 不超过两芯且同截面
主控
The Plug in the No more than two cores and
electricit MC
number connection the same cross-section
y of cores
per
cable terminal
pick up and core
电气回路连接
line 紧固可靠
Electrical circuit
Reliable fastening
connection
弯线方向与螺栓紧固一
致,
单股芯线端部弯圈 且大小合适
Single-stranded core end The bending direction is
bend consistent with the bolt
tightening,
And the right size
至盘柜顶部或及标识
备用芯预留长度
To the top of the enclosure
Spare core reserve length
or to the marking
导线芯线外观
主控 无损伤
Conductor core
MC No damage
appearance
多股软导线端部处理
主控 加终端附件
Multi-stranded soft wire
MC Add terminal accessories
end treatment
齐全,且与导线截面相匹
紧固件配置 配
Fastener configuration Complete and matched to
wire cross-sections
正确、清晰,不易脱色
导线端部标志 主控
Correct, clear, not easy to
Wire end marking MC
decolorize
屏内专用接地铜排截面

主控 ≥100mm2
The special grounded
MC
copper cross-sectional area
in the screen

每个回路单独一点接地,
电流互感器、电流互感器
接地线截面
地 的二次回路接地
Each circuit is individually
pick up The secondary loop of the 主控
grounded at a point,
earth current transformer and MC
grounded in the
the current transformer is
cross-section of the
grounded
grounding line
电缆屏蔽层的接地线截 主控 大于屏蔽层截面面积的 2
面积 MC 倍
Cross-sectional area of the Greater than 2 times the
grounding wire of the cross-sectional area of the
cable shield shield
单个鼻子压接芯线数不超
过6芯
接地线压接 主控
The number of crimp cores
Ground wire crimping MC
in a single nose shall not
exceed 6 cores
铜排与接线鼻子连接
单个螺栓连接不超过 2 个
The copper bar is 主控
No more than 2 single
connected to the wiring MC
bolted connections
nose
验收结论:
Acceptance conclusion:

验收单位签字
The acceptance unit signs

SDTY year month day

RUNH year month day

ACSET year month day

SOMA year month day

You might also like