This document is a mechanical completion instrument report for cable BGC-I16A. It lists items that were checked during inspection, including labeling, termination, insulation resistance, bending radius, and earthing. Checks were indicated as OK, N/A, or requiring punch list items. The report was signed off by representatives from Iraq Gates Contracting Co., IGCC Construction, and IGCC Quality Control to verify completion.
This document is a mechanical completion instrument report for cable BGC-I16A. It lists items that were checked during inspection, including labeling, termination, insulation resistance, bending radius, and earthing. Checks were indicated as OK, N/A, or requiring punch list items. The report was signed off by representatives from Iraq Gates Contracting Co., IGCC Construction, and IGCC Quality Control to verify completion.
This document is a mechanical completion instrument report for cable BGC-I16A. It lists items that were checked during inspection, including labeling, termination, insulation resistance, bending radius, and earthing. Checks were indicated as OK, N/A, or requiring punch list items. The report was signed off by representatives from Iraq Gates Contracting Co., IGCC Construction, and IGCC Quality Control to verify completion.