TOWER TELECOMUNICATION

KAMPUNG HIJRAH, KUALA ROMPIN


PILING WORK'S

Item Description Unit Quantity Unit Cost Total (RM)

A RC Piling
1 Allow for provision of all necessary piling equipment LS 1 5,000.00 5,000.00

2 Supply 200mm x 200mm RC pile M 162 60.00 9,720.00

3 Handle, transport, pitch and drive M 162 30.00 4,860.00

12.7mm (overall) butt weld connection 1.0m girth between

4 edges of mild steel extension head and based cap plates No 0 27.00 -

including coated heavily with bituminious compound.

Cut off and remove surplus length of 200mm x 200mm


5 precast concrete pipe and strip off pile head, bend back No 27 65.00 1,755.00
reinfocement for connection as specified.

GRAND TOTAL 21,335.00