Professional Documents
Culture Documents
IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)
COATING PROCEDURE
IITS/CP/001, Rev. A
SIRAJUL ISLAM
5/5/2014
1
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)
COATING PROCEDURE
Rev Date Prepared By Approved By Status
A 5/5/2014 IITS Sirajul Islam Release
Summary:
Reviewed By:
Sirajul Islam
May 05, 2014
ASNT NDT Level III, #183396
EN ISO 9712 Level III # 08794-2014-02
2
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)
Table of contents
1.0 Scope 04
2.0 Reference 04
3.0 General 04
4.0 Surface Preparation 05
5.0 Coating Application 06
6.0 Touch-Up And Repair Works 09
7.0 Inspection 09
8.0 Safety Requirement And Equipment 11
3
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)
COATING PROCEDURE
1. S C O P E
2. REFERENCE
3. GENERAL
Paint works of all pipe, plate steel etc, shall be treated in according with this
procedure of which the paint manufacture’s instruction and data sheets from apart.
Data sheet of painting must be described product data actual painted to following
(recommended use, physical content, application details, surface preparation,
application condition, safety & handling)
• Manufacture’s name
• Product name and number
• Product colour designation
• Product batch number and manufacturing date
• Qty as per Gallon or Can painted (contain litter)
Materials from damaged containers shall not be used in the work, the
containers of coatings or thinners shall not be opened unless ready for
immediate use. Paint materials shall be used before the expiration of
their shelf life.
4
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)
4. SURFACE PREPARATION
Before blast cleaning performed, visible deposits of oil, grease, or contaminants shall
be removed by any of the methods specified in SSPC-SP 1 or other agreed upon
methods by company.
Before blast cleaning surface inspections such as weld spatter, burning slag, sharp
edges etc, should be removed
Surface shall be blasted in accordance with company spec Manual. This category of
surface preparation shall be applied for all carbon steel and iron surfaces prior to
priming.
After completion of blast cleaning in any area traces of shot or grit and dust shall be
removed from the surfaces by clean dry and oil free compressed air or vacuum
cleaning.
Dry abrasive blast cleaning is not permitted under any of following condition:
5
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)
5. COATING APPLICATION
Surfaces shall be clean, dust free and dry, any of oil, grease, or foreign matters
deposited on the surface after surface preparation shall be removed by solvent
cleaning or using high pressure air blow off prior to painting.
All coating done outdoors / open area shall be done in daylight hours and be
completed at least one hour prior to sundown. Indoors coating is allowed 24 hours a
day if the specified metal and air temperatures and relative humidity requirements are
met inside the building at all times during cleaning, coating and curing.
6
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)
Coating shall be applied in not less then number of coats specified and shall have
individual coat dry film thickness not less than the minimum thickness specified. All
coating film thickness shall be checked, strictly adhered to and shall be free of
pinholes, bubbles and other defects. Film thickness are to be measured with a wet film
gauge during application. Film thickness shall be verified, checked and maintained
during and after each application of each individual coat. Thickness requirements
shall be met with each coat and if too thin, the total thickness shall not be “made up “
in any one coat I, e., another coat shall be applied. Where film thickness does not
meet specification and / or defects (holiday) are found, corrective shall be taken.
Dry film thickness shall be within the range recommended by the Company or
manufacturers
All coatings shall be allowed to dry thoroughly for at least the minimum time
recommended, considering temperature and humidity, before applying succeeding
coats, when maximum overcoat time is recommended by the manufacturer, it shall be
exceeded before applying the succeeding coat.
Each coat (primer, intermediate coat(s) and top coat) shall be inspected by
Contractor/Applicator and may be inspected by Company before applying further
coats.
Prior to application of any coat, all damages to previous coats shall be repair.
b. Primer Coat
c. Intermediate Coat.
d. Before applying Touch up and Intermediate:
7
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)
• Steel pipe which has been jointed, shall be painted after the jointed
surface have been cleaned by light blasting or wire brush.
1. Top Coats
ii. Top coat shall consist of an undercoat and overcoat application of coat
to the prime coat the under coat shall be tinted slightly from the over
coat colour specified to provide a colour difference.
iii. Top coat application and colour requirements shall be as follows:
The damaged parts caused by burns, welds, scratches, impact and so on during
assembly, handling, storage, shipping and erection, coating defects such as
8
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)
• When the coating is damaged down to the steel and spot touch up
is necessary, these areas shall be spot cleaned by blasting or power
tool.
• All of the loose or damaged coating shall be removed “over blast
“shall be prevented by using shields, canvas or vacuum blasting
equipment.
• After the metal surfaces has been properly cleaned, the coated
areas around the repaired areas shall be feather edge. Feather
edging shall be by power or hand sanding with sand paper.
• The coating application in accordance with coating system.
7. INPECTION
b. The indicated records shall be kept daily and shall be submitted to company
daily again and again at the completion of the job.
9
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)
• Review Specification.
• Check Pipe surfaces for inaccessible areas, weld spatter etc.
• Check surface for grease, oil, moisture, etc.
• Check abrasive for cleanliness, dryness, type and size.
• Check compressed air for oil and moisture and nozzle air pressure.
• Check that proper coating and thinners are present, see the coating
has not passed its shelf life.
• Record product name, manufacturer, and batch number.
10
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)
➢ Final Inspection.
❖ Safety Requirement
❖ Explosion Preventation
When working in enclosed spaces (Tank Interiors) the solvent
vapour concentration shall be less than 20% of the lower
explosive limit (see attachment Table 1 & 2 in Coating
Specification CPI, EMS-S-4743)
❖ Toxicity
Personal shall not remain in or enter the tank without supplied
breathing aperture if the solvent vapour concentration is greater
that permitted by the permissible exposure limit (PEL) see table
1 or if the oxygen concentration is less than 18% by volume
❖ Fires
Flammable liquid shall not be stored inside the tank. Liquid
which are stored or used at a temperature above the flash- point
temperature shall not be exposed to flames.
❖ All the equipment shall be suitable for the purpose intended and
shall be equipped with functional pressure regulators, air-water
separators, gauges, controls etc.
11
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)
✓ Blasting:
✓ Coating:
12