You are on page 1of 12

Doc. No.

IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)

INDUSTRIAL INSPECTION & TRAINING SERVICES (IITS)

COATING PROCEDURE
IITS/CP/001, Rev. A

SIRAJUL ISLAM
5/5/2014

1
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)

COATING PROCEDURE
Rev Date Prepared By Approved By Status
A 5/5/2014 IITS Sirajul Islam Release

Summary:

This Procedure defines how IITS shall control its documents

Reviewed By:

Sirajul Islam
May 05, 2014
ASNT NDT Level III, #183396
EN ISO 9712 Level III # 08794-2014-02

2
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)

Table of contents

1.0 Scope 04
2.0 Reference 04
3.0 General 04
4.0 Surface Preparation 05
5.0 Coating Application 06
6.0 Touch-Up And Repair Works 09
7.0 Inspection 09
8.0 Safety Requirement And Equipment 11

3
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)

COATING PROCEDURE

1. S C O P E

This procedure covers the minimum requirements of surface preparation and


protective coating, shall apply to shop and field protective coating.

2. REFERENCE

This procedure refers to the following:


SSPC-SP, Steel Structure Painting Council-Surface Preparation
NACE, National Association of Corrosion Engineers
Coating Specification CPI, SP-ME-ME-025 rev1
Paint Manufacture Technical Data Sheet

3. GENERAL
Paint works of all pipe, plate steel etc, shall be treated in according with this
procedure of which the paint manufacture’s instruction and data sheets from apart.
Data sheet of painting must be described product data actual painted to following
(recommended use, physical content, application details, surface preparation,
application condition, safety & handling)

Material handling and storage shall be done as follows:


Coating material shall be delivered in the manufacturer’s original sealed containers
bearing legible labels.
The sides of each container shall have the following information listed:

• Manufacture’s name
• Product name and number
• Product colour designation
• Product batch number and manufacturing date
• Qty as per Gallon or Can painted (contain litter)

Materials from damaged containers shall not be used in the work, the
containers of coatings or thinners shall not be opened unless ready for
immediate use. Paint materials shall be used before the expiration of
their shelf life.

Only specified coating system a company accepted brands shown on


the coating system data sheets shall be used, unless alternates are
approved by company in writing. Manufacturers direction shall be
followed. Each multi-coat system shall use materials from a single
manufacturer unless otherwise approved by company in writing.

4
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)

a. The application of coating materials is specified by both dry film thickness


(DFT) range for each coat and the minimum total dry film thickness of the
system. The number of coats shall be the minimum number of coats to achieve
the required dry film thickness as recommended by paint manufacturer.

b. Weld joint shall not be coated until NDE satisfactorily completed.

All the applicator personnel shall be trained, competent and have


experience in blasting, coating application and inspection.

4. SURFACE PREPARATION

Before blast cleaning performed, visible deposits of oil, grease, or contaminants shall
be removed by any of the methods specified in SSPC-SP 1 or other agreed upon
methods by company.

Before blast cleaning surface inspections such as weld spatter, burning slag, sharp
edges etc, should be removed

Surface shall be blasted in accordance with company spec Manual. This category of
surface preparation shall be applied for all carbon steel and iron surfaces prior to
priming.

After completion of blast cleaning in any area traces of shot or grit and dust shall be
removed from the surfaces by clean dry and oil free compressed air or vacuum
cleaning.

Blasted surfaces meeting the specified surface preparation requirements shall be


painted with the specified first coat / primer the same day as they are blasted and
before any visible rusting, discoloration or other surface contamination occurs.

Abrasive blast cleaning shall be performed by experienced operators s with approved


equipment.

Dry abrasive blast cleaning is not permitted under any of following condition:

i. Relative humidity greater than 85% for external


ii. Any visible moisture is on the surface
iii. The abrasive material is wet
iv. When painting is being applied or coating is drying and curing in
adjacent area
v. When the surface temperature is less than 5F or 3C above the dew
point

5
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)

b. Spot blast cleaning shall conform to original specification company spec

5. COATING APPLICATION

Surfaces shall be clean, dust free and dry, any of oil, grease, or foreign matters
deposited on the surface after surface preparation shall be removed by solvent
cleaning or using high pressure air blow off prior to painting.

Handling, mixing, thinning, application and curing of coating material shall be


performed in accordance with the coating manufacturers latest published instructions
and technical printed data sheets. The applicator shall have copies of these data
sheets.

Application of paint shall be applied by means of airless spray, conventional spray,


brush and roller may be used on all areas which cannot be properly spray coated for
any reason. Company written approval is required before brush or roller application
can be substituted for spray application. Paint shall be work into all crevices and
corners, all runs or sags shall be brushed out immediately.

All coating done outdoors / open area shall be done in daylight hours and be
completed at least one hour prior to sundown. Indoors coating is allowed 24 hours a
day if the specified metal and air temperatures and relative humidity requirements are
met inside the building at all times during cleaning, coating and curing.

a. No coating shall be applied under any of following conditions:

i. When relative humidity is above the manufacturers written


recommendation.
ii. When temperature of the metal is less than 5F or 3C above the Dew
point.
iii. When the ambient temperature is below 5F or 3C without company’s
written approval.
All component shall be mechanically stirred before coating for such time as
necessary to ensure that the pigment, vehicles and thinners are thoroughly mixed. The
mixed coating shall continuously stir during application by mechanical spray pot
agitators or other approved means if required by manufacturers or company. All
mixing shall be done in clean containers, free from traces of grease, or other coating
or other contaminants. All containers shall be kept covered to prevent contamination
by dust, dirt, rain, etc.
The coating manufacturers recommended pot life shall not be exceed, and when this
limit is reached, the spray pot must be emptied and cleaned, the coating destroyed and
new coating mixed.

6
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)

Coating shall be applied in not less then number of coats specified and shall have
individual coat dry film thickness not less than the minimum thickness specified. All
coating film thickness shall be checked, strictly adhered to and shall be free of
pinholes, bubbles and other defects. Film thickness are to be measured with a wet film
gauge during application. Film thickness shall be verified, checked and maintained
during and after each application of each individual coat. Thickness requirements
shall be met with each coat and if too thin, the total thickness shall not be “made up “
in any one coat I, e., another coat shall be applied. Where film thickness does not
meet specification and / or defects (holiday) are found, corrective shall be taken.

Dry film thickness shall be within the range recommended by the Company or
manufacturers

All coatings shall be allowed to dry thoroughly for at least the minimum time
recommended, considering temperature and humidity, before applying succeeding
coats, when maximum overcoat time is recommended by the manufacturer, it shall be
exceeded before applying the succeeding coat.

Each coat (primer, intermediate coat(s) and top coat) shall be inspected by
Contractor/Applicator and may be inspected by Company before applying further
coats.

Prior to application of any coat, all damages to previous coats shall be repair.

b. Primer Coat

i. Bare surfaces shall be primed with one coat as indicated in


specification.
ii. Constrain associated with applying the prime coat are as follows:

• A Prime coat shall be applied within 5 hours of the star of blast


cleaning.
• The complete coat shall be free of defects (e, g., pinholes, voids,
bubbles, runs, sags). Defective areas shall be repaired by additional
coating or removed and recoated.
• Primed surfaces exposed to polluted atmosphere shall be scrubbed
with fresh water and dried prior to over coating. When bare metal
is exposed during the cleaning of previously coated steel, a prime
coat shall be applied to the exposed areas before proceeding with
the application of the intermediate or finish coat

c. Intermediate Coat.
d. Before applying Touch up and Intermediate:

7
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)

• Remove oil, grease with suitable detergent water.


• Remove salt, waste abrasive, sand or other by high pressure air.
• When re-coating interval is exceeded, do roughening of the surface
by power tool clean or wire brushing / sand papering.

• Any of lower dry film thickness on each coat shall be re-spray to


specified thickness before next coat applied.

• After paint is applied, wet film thickness must be regularly checked in


order to achieved the specified Dry Film Thickness.

• Steel pipe which has been jointed, shall be painted after the jointed
surface have been cleaned by light blasting or wire brush.

• Intermediate painting shall be done after erection work is completed.


Painting of next coat shall be applied after Owner approval of
preceding coat.

• Each coat of paint shall be allowed to dry for a minimum of certain


hours as per paint manufacturer’s recommendation.

1. Top Coats
ii. Top coat shall consist of an undercoat and overcoat application of coat
to the prime coat the under coat shall be tinted slightly from the over
coat colour specified to provide a colour difference.
iii. Top coat application and colour requirements shall be as follows:

• Each coat of coat shall be dry to the touch prior to application of


the next coat.
• Coat mixed shall be applied within the time limit specified by the
manufacturer.
• The tinting material shall be compatible with the coat system and
shall not be detrimental to its service life.
• If manufacturers maximum re-coat times (re-coat interval) are
exceeded, special surface preparation shall be carried out as
recommended by manufacturer and approved by Company.

6. TOUCH-UP AND REPAIR WORKS.

The damaged parts caused by burns, welds, scratches, impact and so on during
assembly, handling, storage, shipping and erection, coating defects such as
8
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)

loss of adhesion, blistering, peeling, mud-cracking, runs and sags, overspray,


etc. must be rectified in accordance with repair procedure.

i. Coating material for touch-up must be the same paint to before.

ii. Repair process.

• When the coating is damaged down to the steel and spot touch up
is necessary, these areas shall be spot cleaned by blasting or power
tool.
• All of the loose or damaged coating shall be removed “over blast
“shall be prevented by using shields, canvas or vacuum blasting
equipment.
• After the metal surfaces has been properly cleaned, the coated
areas around the repaired areas shall be feather edge. Feather
edging shall be by power or hand sanding with sand paper.
• The coating application in accordance with coating system.

7. INPECTION

a. Contractor shall perform all inspections necessary to assure that surface


preparation and coating application complies with the requirements of the
Company specification. The Work shall be subject to company inspection.

b. The indicated records shall be kept daily and shall be submitted to company
daily again and again at the completion of the job.

c. The inspection equipment shall be prepared as below:

❖ Sling Psychrometer & Psychrometric table/Dew point calculator.


❖ Magnetic surface temperature.
❖ Needle Air Pressure Gauge. Visual Standard Book.
❖ Keanetator-Comparator.
❖ Micrometer-Replica Tape.
❖ Wet Film Thickness Gauge.
❖ Dry Film Thickness Gauge
❖ Holiday Test (Wet Sponge
❖ The Contractor shall perform the following Inspection and Testing.

At the beginning of each day’s operation and again immediately prior to


any coating, the ambient condition shall be checked and recorded. (See
form 01).
• Ambient temperature.

9
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)

• Humidity (RH %).


• Dew Point Temperature.
• Steel Surface Temperature.

❖ Pre-Inspection (Pre-Job Check Out)

• Review Specification.
• Check Pipe surfaces for inaccessible areas, weld spatter etc.
• Check surface for grease, oil, moisture, etc.
• Check abrasive for cleanliness, dryness, type and size.
• Check compressed air for oil and moisture and nozzle air pressure.
• Check that proper coating and thinners are present, see the coating
has not passed its shelf life.
• Record product name, manufacturer, and batch number.

❖ Surface Preparation Inspection

Blasted surfaces shall be inspected by the following methods to verify


that the specified surface preparation has been achieved.

• Check ambient conditions, accordance with paragraph 6.4.1.


• Check degree of surface cleanliness by comparison to the
appropriate Visual Standard.
• Check surface profile by Testex Inc. “Press-O-Film” or equivalent.
• Check dust and abrasive removal.
• Take magnetic base reading.

❖ Coating Application Inspection

➢ Application – First Coat.

• Check surface for flash rusting.


• Check ambient conditions.
• Check steel temperature.
• Check proper mix ratio observed.
• Check for proper thinner addition (when necessary).
• Check Wet Film Thickness.

➢ Application - Subsequent Coats.

• Check dry film thickness of preceding coats.


• Check recoat times observed.
• Check intercoat surfaces cleanliness.

10
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)

• Check ambient conditions.


• Check steel temperature.
• Check proper mix ration, and thinner addition.
• Check wet film thickness.

➢ Final Inspection.

• Check visual appearance.


• Check dry film thickness.
• Holiday test ( Required only for interior of tank )
• Cure test.
• Verify all touch-up and repair work.
• Complete records, verify compliance to specification.

8. SAFETY REQUIREMENT AND EQUIPMENT

❖ Safety Requirement
❖ Explosion Preventation
When working in enclosed spaces (Tank Interiors) the solvent
vapour concentration shall be less than 20% of the lower
explosive limit (see attachment Table 1 & 2 in Coating
Specification CPI, EMS-S-4743)

❖ Toxicity
Personal shall not remain in or enter the tank without supplied
breathing aperture if the solvent vapour concentration is greater
that permitted by the permissible exposure limit (PEL) see table
1 or if the oxygen concentration is less than 18% by volume

❖ Fires
Flammable liquid shall not be stored inside the tank. Liquid
which are stored or used at a temperature above the flash- point
temperature shall not be exposed to flames.

❖ All the equipment shall be suitable for the purpose intended and
shall be equipped with functional pressure regulators, air-water
separators, gauges, controls etc.

❖ All equipment shall be maintained and kept in satisfactory


condition to permit surface preparation and coating application
in accordance with specification.

11
Doc. No. IITS/CP/001
Rev. No. A
COATING Date 5/5/2014
Total Page 05
PROCEDURE Prepared by IITS
INDUSTRIAL INSPECTION & Approved by SIRAJUL ISLAM
TESTING SERVICE (IITS)

❖ Personal Protective Equipment.


Contractor shall provide the following protective equipment for
all personnel who blast and coat:

✓ Blasting:

• Heavy protective clothing.


• Heavy leather shoes.
• Leather gloves.
• Fabric hood or hard helmet hood.
• Face shields.
• Respirator and hearing protection

✓ Coating:

• Heavy protective clothing.


• Heavy leather shoes.
• Leather gloves.
• Supplied and breathing apparatus and goggles.
• Barrier cream for exposed skin.

12