1. The document describes a workflow for approving electrical installation permission applications.
2. Applicants submit applications that are scrutinized by Junior Engineers, Assistant Engineers or Assistant Chief Electrical Inspectors depending on the voltage level.
3. Applications may be rejected or forwarded for inspection. Inspections may also lead to rejection or approval and permission being granted.
4. Rejected applicants have opportunities to resubmit with corrections before final rejection.
1. The document describes a workflow for approving electrical installation permission applications.
2. Applicants submit applications that are scrutinized by Junior Engineers, Assistant Engineers or Assistant Chief Electrical Inspectors depending on the voltage level.
3. Applications may be rejected or forwarded for inspection. Inspections may also lead to rejection or approval and permission being granted.
4. Rejected applicants have opportunities to resubmit with corrections before final rejection.
1. The document describes a workflow for approving electrical installation permission applications.
2. Applicants submit applications that are scrutinized by Junior Engineers, Assistant Engineers or Assistant Chief Electrical Inspectors depending on the voltage level.
3. Applications may be rejected or forwarded for inspection. Inspections may also lead to rejection or approval and permission being granted.
4. Rejected applicants have opportunities to resubmit with corrections before final rejection.
2. ASE in case of From 33 KV to 220 KV 3. ACEI in case of Above 220 KV
Description: This desk will verify application
Rejection Reason to Applicant form & Documents from Scrutiny, In Scrutiny - in application, eMail & SMS. provide Remark text box & Recommendation tab for proceed.
Only 2 times user can re-apply,
5th is final rejection is from EI/SE/CEI,
1. EI In case of Above 650 Volts to 33 KV
2. SE in case of From 33 KV to 220 KV 3. CEI in case of Above 220 KV
If application is Negative with If application is Positive with
application form, attachment & application form, attachment & remarks by JE/ASE/ACEI then it will remarks by JE/ASE/ACEI then reject by EI/SE/CEI with Remarks EI/SE/CEI will send intimation date (text Box) & Rejected for for Inspection in eMail & SMS. Rectification tab for action.
Rejection reason to Applicant
in application, eMail & SMS. If application is Negative while If application is Positive while inspection then it will reject by inspection then application will Only 2 times user can re-apply, EI/SE/CEI with Remarks (text Box) & approve & permission will granted. 5th is final rejection from Rejected for Rectification tab for EI/SE/CEI, & provide 5 option action. of other for document upload to user.