Date : 14.05.

2022
To

M/s. ALKRAFT THERMO TECHNOLOGIES PVT. LTD,


35/A & B/1, Sai Nagar,
Ambattur Industrial Estate,
Chennai – 600 058.

SUB : QUOTATION FOR FLOOR BASEMENT CIVIL WORK


Dear Sir,
We submit our lowest Quotation for the following items.

Sl. PARTICULARS Qty. Rate Amount


No. Rs. P.

1. Earth Work Excavation ordinary Soil 30 Cft 85.00 2,550 00


2. Supply & Filling M.Sand 100 Cft 85.00 8,500 00

3. Laying PCC 1:4:8 by using 40mm BGM 35 Cft 185.00 6,475 00

4. Laying Concrete 1:1:5:3 Mix by using 20mm 180 Sqft 235.00 43,475 00
BGM 120mm Thick

5. Plastering in CM 1:5, 12mm Thick 207 Sqft 65.00 13,455 00

6. Construction of Brck Work in CM 1: 5 9” Brick 46 Cft 245.00 11,270 00


Wall Work
7. Floor Finishing 180 Sqft 10.00 1,800 00

8. Rubbish Filling 370 Cft 45.00 16,650 00


9. Pa 100mm Channel 500mm Length 8 Nos. 1850.00 14,800 00
Fabrication and Grouting

TOTAL 1,18,975 00
GST 18% EXTRA