Professional Documents
Culture Documents
Maintenance Plan - Plumbing
Maintenance Plan - Plumbing
PLUMBING SYSTEM
TESDA-NCR Regional Office
CY 2022
FREQUENCY
COMPONENT TASK
W M Q S A
Check, inspect and repair for the following conditions:
a) Dripping on valves and spout
A. Faucet and Gate b) Handle rotates without changing water flow
Valves ü
c) Water leaks around the stem when the faucet or valve is
open
d) Slow flow of water from spout
Check, inspect and repair for the following conditions:
a) Water flows continously
B. Water Closet ü
b) Water closet will not flush
c) Water closet tank leaks
Check, inspect and repair for the following conditions:
C. Water Supply Pipe ü
a) Leaks at fitting due to twisting of pipes
Check,
a) Waterinspect
closetand
willrepair for the
not drain duefollowing conditions:
to stoppage in toilet bowl
D. Drains, Waste and trap, drains, waste, vents branch piping, stack or building
Vents ü
b) Use a water ram or closet auger to remove the trap. Run a
drain.
snake or drain cleaning machine through the drain.
Check, inspect and repair for the following conditions:
E. Tub, Lavatory, a) Blockage at the stopper mechanism, fixture trap, drain,
Shower or Sink Drain waste, ventsstopper
branch and
piping, stackthe
anddrain
building drain. matter. ü
b) Remove inspect for foreign
Use snake to clean the clogged branch piping.
SEMI-ANNUAL
COMPONENT TASK
JAN - JUNE JULY -DEC.
Signature:
Conducted by: ARTHUR G. RECADORDA
Date:
Signature:
Verified by: GELLY KAYE M. DIZON
Date:
PLUMBING SYSTEM INSPECTION REPORT
CY 2022
QUARTERLY CHECKLIST
Signature:
Conducted by: ARTHUR G. RECADORDA
Date:
Signature:
Verified by: GELLY KAYE M. DIZON
Date: