Project: Aljada Development Block J Phase 1,

Residential Buildings (B+G+5/6 Floor) on Plot METHOD STATEMENT


No: 7300, Muwaileh, Sharjah, UAE
Contract: Block J Phase 1 DS Ref. No: AAC-230-CIVIL-TS-MS-0006
Date: 19 February 2022 Rev: 00
Consultant Arcadia Middle East
Discipline: ☐ Architectural ☒ Structural
Contractor: Al Ashram Contracting LLC ☐ Mechanical ☐ Electrical
☐ Other (Specify):

Type of SD ☐ Shop Drawings


Submittal MS ☒ Materials
AS ☐ As-Built Drawings
TS ☐ Pre-Qualification ☐ O&M Manual ☐ Test Reports
☐ Quality & Safety ☐ Programme ☐ Certificates
☐ Method Statement ☐ Samples & Qc Panels ☐ Calculations
☐ Other (Specify):      

Title / Subject Method Statement for Wet Area Waterproofing

Section A – Submittal Details


DWG Ref: - SPC/BQ/CoC Ref: -
Sender’s Remarks:

List of attachments: ☒ Refer to the attached Register / Checklist


Hard Soft
Ref Item No. Item Description Rev
Copies Copy
1 AAC-P230-MS-CIV-0006 Method Statement for Wet Area Waterproofing 00 2 ☒
                              ☐
For and on behalf of the Contractor: Received by the Engineer:
Prepared by: Mr. Khaled Taher - Project Manager
Date and Signature: 19 February 2022
We certify that the above submitted items have been reviewed in detail and are correct and in conformity with the Contract Drawings and Specifications
except as otherwise stated;
Section B – Reviewer’s Comments:
Approval Status:
☐ A – Approved
☐ B – Approved as Noted
☐ C – Revise & Resubmit
☐ D – Rejected
☐ R – For Record Only

☐ Please see attached notes; no. of pages (       )


For & on behalf of Engineer: Received by Contractor:
Design Specialist: ______________________ Date: ____________
Reviewed by: ___________________

Date & Signature: _____________ Development Manager: ________________ Date: ____________

*Approval shall not relieve the Contractor of his liabilities under the Contract or constitute authorization of any change to the Contract Documents.
Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the requirements of the
drawings and specifications. This review is for general conformance with the design of the project and general compliance with the information given in the
contract document.

SUB - Submittal Form - Rev 01 Page 1 of 2


SUB - Submittal Form - Rev 01 Page 2 of 2