% COMPLETE

SUB-
ACTIVITY ID PHASE TYPE DESCRIPTION PRIORITY EST. DURATION AT START EST. DURATION TODAY OWNER Updates
HEADING

AA to start producing the


A004 PD FEA SLIDE BI LATCH TWIN-HOOK. FEA VERY HIGH 16 3.2 AA model from Inventor 80%

ISOMETRIC ON THE INSTALLATION WHICH INCLUDE THE STAGES


A057 PP INSTALL SLIDE LOW 8 8 AA 0%
AND PRE-LOAD BOLTS
ISOMETRIC ON THE INSTALLATION WHICH INCLUDE THE STAGES
A059 PP INSTALL HINGE LOW 8 8 AA 0%
AND PRE-LOAD BOLTS
A061 PP INSTALL ELEC ISOMETRIC ON THE INSTALLATION WHICH INCLUDE THE STAGES LOW 8 8 AA 0%
A063 PP INSTALL ALL STILLAGE DESIGN VERY LOW 37 27.75 AA 25%
A085 PD FAB SLIDE ISOMETRICS OF THE LEAF HIGH 37 14.8 AA 60%
A086 PD FAB HINGE ISOMETRICS OF THE LEAF HIGH 37 14.8 AA 60%
A087 PD FAB SLIDE ISOMETRICS OF THE FRAME HIGH 37 14.8 AA 60%
A088 PD FAB HINGE ISOMETRICS OF THE FRAME HIGH 37 14.8 AA 60%
FATIGUE MOR LEVELING FEET AND SUPPORT FOR BASE OF TEST RIGS - ISSUE 0.25
A089 PD ALL HIGH 1 0 AA 100%
TEST TO OPS
FATIGUE 1
A090 PD ALL BOLTING METHOD OF RIGS TOGETHER - ISSUE TO OPS HIGH 2 0 AA 100%
TEST
FATIGUE 0.25
A091 PD ALL MOR BOLTING METHOD OF RIGS TOGETHER - ISSUE TO OPS HIGH 1 0 AA 100%
TEST
SMALL PART under review with JA
A114 PD ALL FINAL DRAWING OF TOP BEARING MEDIUM 8 1.6 AA 80%
TESTING
SMALL PART only after testing is done
A119 PD ALL APPENDIX ON PRE TEST, LIVE TEST, POST TEST MEDIUM 16 16 AA 0%
TESTING
SMALL PART only after testing is done
A129 PD ALL APPENDIX ON PRE TEST, LIVE TEST, POST TEST MEDIUM 16 16 AA 0%
TESTING
SMALL PART
A139 PD ALL APPENDIX ON PRE TEST, LIVE TEST, POST TEST MEDIUM 16 16 AA 0%
TESTING
SMALL PART
A159 PD ALL APPENDIX ON PRE TEST, LIVE TEST, POST TEST MEDIUM 16 16 AA 0%
TESTING
SMALL PART
A169 PD ALL APPENDIX ON PRE TEST, LIVE TEST, POST TEST MEDIUM 16 16 AA 0%
TESTING
INSERT THE LATEST MODEL INTO THE FIRE TESTING ASSSEMBLY -
A176 PD FIRE TEST SLIDE HIGH 4 2 AA 50%
TEST 2
INSERT THE LATEST MODEL INTO THE FIRE TESTING ASSSEMBLY -
A177 PD FIRE TEST SLIDE HIGH 4 2 AA 50%
TEST 3
INSERT THE LATEST MODEL INTO THE FIRE TESTING ASSSEMBLY -
A178 PD FIRE TEST SLIDE HIGH 4 2 AA 50%
TEST 4
INSERT THE LATEST MODEL INTO THE FIRE TESTING ASSSEMBLY -
A179 PD FIRE TEST HINGE HIGH 4 4 AA 0%
TEST 5
A180 PD FIRE TEST SLIDE CREATE FINAL GENERAL ARRANGMENT OF FIRE TEST - TEST 1 VERY HIGH 16 4 AA not finished 75%
A181 PD FIRE TEST SLIDE PRIMARY GAP DRAWING MEDIUM 16 4 AA 75%
A182 PD FIRE TEST SLIDE CREATE FINAL GENERAL ARRANGMENT OF FIRE TEST - TEST 2 HIGH 8 4.8 AA not finished 40%
A183 PD FIRE TEST SLIDE CREATE FINAL GENERAL ARRANGMENT OF FIRE TEST - TEST 3 HIGH 8 4.8 AA not finished 40%
A184 PD FIRE TEST SLIDE CREATE FINAL GENERAL ARRANGMENT OF FIRE TEST - TEST 4 HIGH 8 4.8 AA not finished 40%
A185 PD FIRE TEST HINGE CREATE FINAL GENERAL ARRANGMENT OF FIRE TEST - TEST 5 HIGH 8 8 AA not finished 0%
A186 PD FIRE TEST HINGE PRIMARY GAP DRAWING MEDIUM 16 16 AA 0%
A189 PD FIRE TEST SLIDE FULL DOOR FIRE TEST REPORT - 60 MINUTE SLIDER MEDIUM 32 32 AA after fire tesing Mar '23 0%
A190 PD FIRE TEST SLIDE DRAWING OF THERMOCOUPLES - LESSON LEARNED MEDIUM 8 8 AA 0%
A192 PD FIRE TEST SLIDE FULL DOOR FIRE TEST REPORT - 120 MINUTE SLIDER MEDIUM 32 32 AA after fire tesing Mar '23 0%
A193 PD FIRE TEST SLIDE DRAWING OF THERMOCOUPLES - LESSON LEARNED MEDIUM 8 8 AA 0%
A195 PD FIRE TEST HINGE FULL DOOR FIRE TEST REPORT - 120 MINUTE HINGE MEDIUM 32 32 AA after fire tesing Mar '23 0%
A196 PD FIRE TEST HINGE DRAWING OF THERMOCOUPLES - LESSON LEARNED MEDIUM 8 8 AA 0%
DOWNLOAD THE MODELS FROM PROJECTWISE, CONVERT TO
A199 PD BIM ALL VERY LOW 37 37 AA 0%
AUTOCAD
DRAG AND DROP THE FAMILYS INTO POSITION, EXPORT
A205 PP BIM ALL VERY LOW 111 111 AA 0%
INDIVDIUALLY AS A "SET" BUT AS IFC4