FLUE GAS DESULPHURISATION SYSTEM (FGD) PACKAGE FOR

PROJECT NABINAGAR SUPER THERMAL POWER PROJECT


(4x250 MW) UNIT#1, #2, #3 & #4

NTPC Limited
OWNER
(A Govt. of India Enterprise)

BHARAT HEAVY ELECTRICALS LTD


EPC CONTRACTOR POWER SECTOR – PROJECT ENGINEERING
MANAGEMENT, NOIDA (U.P.)

BYGGING INDIA LIMITED


EPC SUB-CONTRACTOR 1206-1210 | 12th Floor | Modi Tower | Nehru Place |
New Delhi 110019 (India)

MANUFACTURER ALIKRAFT ENGINEERS (P) LIMITED

DRAWING TITLE FIELD QUALITY PLAN OF ELEVATOR - FGD Wet Stack

NTPC DRAWING NO

BHEL DRAWING NO REV. NO. 0


AEPL/BIL-BHEL/NABINAGAR-
ALIKRAFT DRAWING NO
STPP/FQP/002
PREPARED BY VRP
REVIEWED BY JMG
APPROVED BY JMG

ISSUED FOR √ FOR APPROVAL FOR INFORMATION

INTERNAL DOCUMENT REVISION CONTROL

REV. REV.
REVISION DESCRIPTION PREPARED BY REVIEWED BY APPROVED BY
NO. DATE
00 03.12.2021 FOR APPROVAL VRP JMG JMG
PROJECT : Flue Gas Desulphurisation System
MANUFACTURER’S NAME & FIELD QUALITY PLAN Package For Nabinagar STPP,
ADDRESS (4x250 MW) – Unit#1, #2, #3 & #4
Alikraft Engineers Pvt. Limited ITEM : Elevator (Rack & Pinion) for FQP NO. : AEPL/BIL-
Chimney – 400 Kg BHEL/NABINAGAR- PACKAGE : FGD
Block No.:826, At & Post.: OWNER : NTPC Limited
Samlaya, Samlaya-Savli Road, SUB- STPP/FQP/002
SYSTEM : Stack Elevator REV. : 0 EPC : M/s. BHEL Limited /
Ta.: Savli, Dist.: Vadodara-391 CONTRACTOR Bygging India Limited
520, Gujarat, India DATE : 03.12.2021
PAGE : Page 1 of 3
CLASS REMARKS
SL. ACTIVITY AND CHARACTERISTICS/IN QUANTUM REFERENCE ACCEPTANCE
OF TYPE OF CHECK OF CHECK FORMAT OF RECORD
NO OPERATION STRUMENTS DOCUMENT NORMS
CHECK
1 2 3 4 5 6 7 8 9 D* 10
MATERIAL RECEIPT
A
& STORAGE
Check for dispatch
(a) Receipt / Transit documents Tally with
Major 100% Packing List No Damage Site Report √
Damage Packing List & Check
1 BASE FRAME
for any visual Damage
(b) Storage Damage /
Minor Storage in open area 100% Packing List No Damage Site Report √
Deformation

Check for dispatch


(a) Receipt / Transit documents Tally with
Major 100% Packing List No Damage Site Report √
Damage Packing List & Check
2 BUFFER SPRING
for any visual Damage
(b) Storage Damage /
Minor Storage in open area 100% Packing List No Damage Site Report √
Deformation

Check for dispatch


(a) Receipt / Transit documents Tally with
Major 100% Packing List No Damage Site Report √
Damage Packing List & Check
3 MAST SECTION
for any visual Damage
(b) Storage Damage /
Minor Storage in open area 100% Packing List No Damage Site Report √
Deformation

Check for dispatch


(a) Receipt / Transit documents Tally with
Major 100% Packing List No Damage Site Report √
Damage Packing List & Check
4 CAGE
for any visual Damage
(b) Storage Damage /
Minor Storage in open area 100% Packing List No Damage Site Report √
Deformation
Doc No.: Cat:

MANUFACTURER/
MAIN SUPPLIER
SUB SUPPLIER
FOR NTPC USE
REVIEWED APPROVED APPROVAL
SIGNATURE
BY BY SEAL
PROJECT : Flue Gas Desulphurisation System
MANUFACTURER’S NAME & FIELD QUALITY PLAN Package For Nabinagar STPP,
ADDRESS (4x250 MW) – Unit#1, #2, #3 & #4
Alikraft Engineers Pvt. Limited ITEM : Elevator (Rack & Pinion) for FQP NO. : AEPL/BIL-
Chimney – 400 Kg BHEL/NABINAGAR- PACKAGE : FGD
Block No.:826, At & Post.: OWNER : NTPC Limited
Samlaya, Samlaya-Savli Road, SUB- STPP/FQP/002
SYSTEM : Stack Elevator REV. : 0 EPC : M/s. BHEL Limited /
Ta.: Savli, Dist.: Vadodara-391 CONTRACTOR Bygging India Limited
520, Gujarat, India DATE : 03.12.2021
PAGE : Page 2 of 3
CLASS REMARKS
SL. ACTIVITY AND CHARACTERISTICS/IN QUANTUM REFERENCE ACCEPTANCE
OF TYPE OF CHECK OF CHECK FORMAT OF RECORD
NO OPERATION STRUMENTS DOCUMENT NORMS
CHECK
1 2 3 4 5 6 7 8 9 D* 10
Check for dispatch
(a) Receipt / Transit documents Tally with
Major 100% Packing List No Damage Site Report √
Damage Packing List & Check
5 LANDING DOOR
for any visual Damage
(b) Storage Damage /
Minor Storage in open area 100% Packing List No Damage Site Report √
Deformation

Check for dispatch


(a) Receipt / Transit documents Tally with
Major 100% Packing List No Damage Site Report √
Damage Packing List & Check
6 CONTROL PANEL
for any visual Damage
(b) Storage Damage /
Minor Storage in open area 100% Packing List No Damage Site Report √
Deformation

Check for dispatch


(a) Receipt / Transit documents Tally with
Major 100% Packing List No Damage Site Report √
Damage Packing List & Check
7 MOTOR
for any visual Damage
(b) Storage Damage /
Minor Storage in open area 100% Packing List No Damage Site Report √
Deformation

Check for dispatch


(a) Receipt / Transit documents Tally with
Major 100% Packing List No Damage Site Report √
Damage Packing List & Check
8 CABLES
for any visual Damage
(b) Storage Damage /
Minor Storage in open area 100% Packing List No Damage Site Report √
Deformation

Doc No.: Cat:

MANUFACTURER/
MAIN SUPPLIER
SUB SUPPLIER
FOR NTPC USE
REVIEWED APPROVED APPROVAL
SIGNATURE
BY BY SEAL
PROJECT : Flue Gas Desulphurisation System
MANUFACTURER’S NAME & FIELD QUALITY PLAN Package For Nabinagar STPP,
ADDRESS (4x250 MW) – Unit#1, #2, #3 & #4
Alikraft Engineers Pvt. Limited ITEM : Elevator (Rack & Pinion) for FQP NO. : AEPL/BIL-
Chimney – 400 Kg BHEL/NABINAGAR- PACKAGE : FGD
Block No.:826, At & Post.: OWNER : NTPC Limited
Samlaya, Samlaya-Savli Road, SUB- STPP/FQP/002
SYSTEM : Stack Elevator REV. : 0 EPC : M/s. BHEL Limited /
Ta.: Savli, Dist.: Vadodara-391 CONTRACTOR Bygging India Limited
520, Gujarat, India DATE : 03.12.2021
PAGE : Page 3 of 3
CLASS REMARKS
SL. ACTIVITY AND CHARACTERISTICS/IN QUANTUM REFERENCE ACCEPTANCE
OF TYPE OF CHECK OF CHECK FORMAT OF RECORD
NO OPERATION STRUMENTS DOCUMENT NORMS
CHECK
1 2 3 4 5 6 7 8 9 D* 10
PRE-ERECTION /
B
ERECTION

Healthiness of Site Report/


1 POWER CABLE Major Continuity Test 100% Megger √
Cable IR

2 TIGHTNESS OF MAST Major Torque 100% Manual 300 N/m Site Report √

Uprightness with
3 MAST SECTION Major 100% Manual / Drawing Uprightness Site Report √
respect to structure

Smooth Door
4 LANDING DOOR Major Door Operation 100% Manual / Drawing Site Report √
Operation

Up & Down Movement Correct Directional


5 CAGE OPERATION Major 100% Manual / Drawing Site Report √
and switch Function Movement

Control Circuit must


CAGE INTERLOCKING P. G. Test
6 Critical Interlocking 100% be interlocked with Site Report √
SYSTEM Procedure
cage

SEMI AUTOMATIC Correct Directional


7 Critical Interlocking 100% Drawing Site Report √
SYSTEM Movement

Safety Device must


8 SAFETY DEVICE Critical Drop Test 100% Manual stop within distance Site Report √
of 2.0 mtr.

Doc No.: Cat:

MANUFACTURER/
MAIN SUPPLIER
SUB SUPPLIER
FOR NTPC USE
REVIEWED APPROVED APPROVAL
SIGNATURE
BY BY SEAL