You are on page 1of 7

0 10m 20m

1:200

)
RY
CTO
FA
IN
.(T
STN
RA
IPU
OTH
JY

PH II -R1 GFC

BANGALORE METRO RAIL A. 3rd Floor, BMTC Complex,


K H Road, Shanthinagar,
CORPORATION LTD Bangalore -560027
Tel:-080-22969300

HOODI JUNCTION STATION

E&M
BMRCL-PH II-R1-DKIA-GFC-E&M-FF-FA-1001-015 R1
0 10m 20m
1:200

)
RY
CTO
FA
IN
.(T
STN
RA
IPU
OTH
JY

PH II -R1 GFC

BANGALORE METRO RAIL A. 3rd Floor, BMTC Complex,


K H Road, Shanthinagar,
CORPORATION LTD Bangalore -560027
Tel:-080-22969300

HOODI JUNCTION STATION


DECK LEVEL PLAN - FIRE FIGHTING & FIRE
ALARM LAYOUT

E&M
BMRCL-PH II-R1-DKIA-GFC-E&M-FF-FA-1101-020 R1
0 10m 20m
1:200

)
RY
CTO
FA
IN
.(T
STN
RA
IPU
OTH
JY

PH II -R1 GFC

BANGALORE METRO RAIL A. 3rd Floor, BMTC Complex,


K H Road, Shanthinagar,
CORPORATION LTD Bangalore -560027
Tel:-080-22969300

HOODI JUNCTION STATION


CONCOURSE LEVEL PLAN-FIRE FIGHTING &
FIRE ALARM LAYOUT

E&M
BMRCL-PH II-R1-DKIA-GFC-E&M-FF-FA-1201-026 R1
0 10m 20m
1:200

)
RY
CTO
FA
IN
.(T
STN
RA
IPU
OTH
JY

PH II -R1 GFC

BANGALORE METRO RAIL A. 3rd Floor, BMTC Complex,


K H Road, Shanthinagar,
CORPORATION LTD Bangalore -560027
Tel:-080-22969300

HOODI JUNCTION STATION


PLATFORM PLAN - FIRE FIGHTING & FIRE
ALARM LAYOUT

E&M
BMRCL-PH II-R1-DKIA-GFC-E&M-FF-FA-1301-033 R1
0 10m 20m
1:200

)
RY
CTO
FA
IN
.(T
STN
RA
IPU
OTH
JY

PH II -R1 GFC

BANGALORE METRO RAIL A. 3rd Floor, BMTC Complex,


K H Road, Shanthinagar,
CORPORATION LTD Bangalore -560027
Tel:-080-22969300

HOODI JUNCTION STATION


PUMP ROOM FIRE FIGHTING & FIRE ALARM LAYOUT

E&M
BMRCL-PH II-R1-DKIA-GFC-E&M-FF-FA-1001-015 R0
NOTES:-
PUMP HOUSE HAS BEEN SHOWN FARTHER THAN
ACTUAL POSITION FOR PURPOSE OF CLARITY

SCHEDULE OF PUMPS

S.NO. ITEM DRIVE CAPACITY LPM

1. HP = HYDRANT PUMP ELECTRIC 75 HP 2850

2. HSP = HYDRANT STAND BY PUMP DIESEL 75 HP 2850

3. HJP = HYDRANT JOCKEY PUMP ELECTRIC 7.5 HP 180

S.NO. SYMBOL DESCRIPTION

1 0 10m 20m
FIRST AID HOSE REEL
1:200
2 SINGLE HEADED LANDING VALVE

)
RY
3 NON RETURN VALE FA
CTO
IN
.(T
STN
RA
IPU
4 BUTTER FLY VALVE JY
OTH

5 PRESSURE SWITCH

6 PRESSURE GAUGE

7 FIRE HYDRANT PIPE PH II -R1 GFC


8 'Y' TYPE STRAINER
BANGALORE METRO RAIL A. 3rd Floor, BMTC Complex,
9 BALL VALVE K H Road, Shanthinagar,
CORPORATION LTD Bangalore -560027
10 Tel:-080-22969300
REDUCER

11 4 WAY FIRE BRIGADE INLET


HOODI JUNCTION STATION
BRIGADE DRAW OFF CONNECTION
P&I DIAGRAM - FIRE FIGHTING LAYOUT

E&M
BMRCL-PH II-R1-DKIA-GFC-E&M-FF-0001-006 R1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

A A

B B

C C

D D

E E

F F

G G

H H

I I

J J

NOTES:-

1. FIRE SURVIVAL TWISTED COPPER CABLE CWZ,CATEGORY 950 DEG C RATING OF 3 HRS
CONFORMING TO BS:7629 SHALL BE USED FOR FIRE DETECTION AND ALARM SYSTEM,
2. THE FIRE ALARM SYSTEM SHALL COMPLY WITH REQUIREMENTS OF NBC-2016, NFPA
STANDARD NO. 72/ EN 54
3. WIRING SHALL BE DONE AS PER STYLE 7,NFPA 72.
4. INTELLIGENT ADDRESSABLE MULTI-CRITERION DETECTORS SHALL BE IN ALL
EQUIPMENT ROOMS ABOVE / BELOW FALSE CEILING, BELOW FALSE FLOOR AND IN
K VARIOUS FALSE CEILING AREAS ON CONCOURSE LEVEL.
K

5. DETECTOR ABOVE FALSE CEILING/ BELOW FALSE FLOOR SHALL BE PROVIDED WITH
RESPONSE INDICATOR (RI). RI SHALL BE FLUSHED WITH FALSE CEILING OR 300MM
ABOVE FALSE FLOOR
6. RI SHALL ALSO BE PROVIDED OUTSIDE EQUIPMENT ROOMS , OUTSIDE CORRIDOR AND
OUTSIDE UNMANNED AREAS.
7. DETECTORS ON CEILING SHALL BE LOCATED NOT LESS THAN 100MM FROM SIDE WALL
AND BETWEEN 100MM & 300MM FROM ROOF ON SIDE WALL.
8. DETECTOR SHALL BE PROVIDED IN ALL LIFT SHAFTS AT TOP WITH RI AT TOP LANDINGS
9. DETECTOR SHALL ALSO BE PROVIDED INSIDE ESCALATOR PIT AT BOTH ENDS. (UNDER
THE SCOPE OF ESCALATOR CONTRACTOR) 0 10m 20m
10. FAULT ISOLATOR MODULES, CONTROL MODULES, ETC. SHALL BE PROVIDED AT 1:200
APPROPRIATE LOCATION AS DETAILED IN SPECIFICATIONS.
L L
11. SOUND PRESSURE LEVEL OF 90DB(A) IS CONSIDERED FOR HOOTER WITH STROBE
MEASURED AT 10 FEET FROM THE DEVICE.
)
RY
12. MANUAL CALL POINTS (MCP) AND HOOTERS (HT) SHALL BE PROVIDED SUITABLY AT CTO
FA
IN
LOCATIONS WHERE DETECTORS ARE NOT INSTALLED. STN
.(T
RA
IPU
13. CABLE ROUTING FOR THE DETECTORS & DEVICES AT DIFFERENT LEVELS SHALL BE AS JY
OTH

PER FIRE DETECTION SCHEMATIC.


14. EVERY ENCLOSURE (I.E. ROOM OR CABIN) SHOULD HAVE DETECTOR EVEN THOUGH
THE AREA MAY BE LESS THAN THE MINIMUM PRESCRIBED IN TABLE IS-2189.
15. INTER CONNECTING CABLE FOR ALL DETECTORS SHALL BE ROUTED UPON THE ROOF /
CABLE TRAY AS PER SITE CONDITION.

FIRE FIGHTING & FIRE ALARM


16. DIMENSION GIVEN ARE FOR REFERENCE ONLY & EXACT DIMENSION TO BE PH II -R1 GFC
ASCERTAINED TO SUIT SITE CONDITIONS.
17. FIRE ALARM CONTROL PANEL (FACP) AND REPEATER PANEL (RP) ARE LOCATED IN
M M
STATION CONTROL ROOM AND SECURITY ROOM RESPECTIVELY. BANGALORE METRO RAIL A. 3rd Floor, BMTC Complex,
K H Road, Shanthinagar,
18. GUIDELINES OF MANUFACTURERS SHALL BE FOLLOWED FOR INSTALLATION OF FIRE
ALARM CONTROL PANEL (FACP), DETECTORS, FAULT ISOLATORS, MONITOR/CONTROL CORPORATION LTD Bangalore -560027
Tel:-080-22969300
MODULE AND OTHER DEVICES.

HOODI JUNCTION STATION


SCALE: AS SHOWN
SCHEMATIC DIAGRAM FOR FIRE ALARM SYSTEM
REV NO DISCRIPTION APPROVED DATE REV NO DISCRIPTION APPROVED DATE REV NO DISCRIPTION APPROVED DATE

CONSTRUCTION / FABRICATION WORK IS DRAWN: PRAVEEN CHECKED: N.KARTHICK ISSUE


N PERMITTED ON 'R' (RELEASED) ISSUES N
ONLY.

INFORMATION CONTAINED WITHIN 'HOLD'


DATE DATE R1
IS NOT RELEASED FOR CONSTRUCTION/ DESIGNED: PRAVEEN
FABRICATION. FIELD MUST GET
DESIGN OFFICE TO CLEAR 'HOLDS' IN
TIME BEFORE PROCEEDING WITH ANY DWG NO.
CONSTRUCTION/FABRICATION WORK RELATED
TO 'HOLDS'.
BMRCL-PH II-R1-DKIA-GFC-ELC-1707-039
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

You might also like