Professional Documents
Culture Documents
Consultant
No No
Manager
Proposal of Approval of
proceed the by the Site
the Work the Layout
Work Engineer
Supervision Engineer
Quality, Quantity,
Test Report
provided by
the Lab
Supervision Engineer
Layout, Quantity,
Supervise
Start the
Work as per
Construction
Drawing and
Work
Specification
Start Layout
of the Work
Supervisor
Lab Technician
Sampling of
Material for
the Test