Note: In case of Bulkily dispatch from customer: all materials to be segregated and stored properly at OTECH Regional
WH.
➢ Supply chain for CCS material supply.
DO
REQUEST In case of Bulk pick up, all the materials
need to be unloaded at regional WH in
Rollout presence of logistic supervisor.\
Customer All materials to be segregated and
coordinator
Do stored safely.
RECEIVE Logistic supervisor will be solely
Do
responsible for the stock maintenance
checking and material safety.
and Signed DN Signed DN
Dispatch
confirm Original copy at
for pick regional
WH
up
Arrange Loaded
Logistics vehicle Customer material to be Regional WH
supervisor Warehouse transported or SITE
for pick safely and
up dispatched a
rational WH or
site Dispatch at Site
Do
RECEIVE
Arrange Loaded
vehicle OTECH material to be
Vendor SITE
supervisor Warehouse transported
for pick safely and
up dispatched at
site
Note: Above mentioned detail are the standard document and can differ as per the customers
requirement.
➢SAR &TSS
➢ TSSR Approval from Customer
➢ SLA Signed by Owner & Customer
➢ Soil Testing/Structural Analysis Report.
➢ SD Preparation
➢ Site Kick off/Layout
➢ Excavation + Layout + Lean concrete
➢ Concrete Pouring (Pad + Columns)
➢ Backfilling
➢ Grounding Work Underground
➢ DG & BTS Slab Casting
➢ Tower Erecting + Accessories installation
➢ RFI(Ready for Installation)
➢ Generator installation & TI commissioning
➢ Fence Installation
➢ Fully understand the site design documentation.
➢ Be familiar with project quality standard.
➢ Participating in the training beforehand, demonstration site visiting and learning.
➢ Site material quality inspection upon arrival.
➢ Quality control and guidance during the site construction and installation processes.
➢ Key site construction and installation milestones quality acceptance.
➢ Random quality inspection upon site completion.
➢ Statistical analysis on site quality problems and rectifications.
KICK OFF / LAYOUT
1 Verify Coordinates using GPS
2 Mark lease area
3 Layout in presence of owner.
4 Bench mark
5 Cross check boundary falling to other than owner.
6 Prepare an Audit report , confirming TSSR.
Rollout- TI process
Head Pre installation
TSSR and RFI
document
Link Budget
Link Budget, TSSR Supervisor/ Outdoor / Indoor
Customer TI-Head and RFI
Vendor Installation
AAR and TIML document
Team
Approved AAR AAR, TIML and
and TIML Photographs Cable Routing
MW antenna
Link Budget, Approved Commissioning and
AAR, TIML and Photograph
Alignment.
Acceptance
Head Documentation like
(AAR and TIML)
➢ Pre installation
➢ Outdoor/Indoor Installation
➢ Cable Routing
➢ MW antenna Commissioning and Alignment.
➢ BTS Commissioning and Traffic Conformation
➢ Documentation like ( AAR and TIML)
.
➢ Before mobilizing the site TI installation below listed documents and installation tools are
required along with ESH tools and need to be verified by the supervisor/Vendor team.
➢ Documents ( Provided by TI-Head)
➢ Approved TSSR
➢ RFI documents
➢ Link Budget
➢ Tools
➢ TI installation tools ( wrench, drill machine, pulley, rope, tie cutter etc. )
➢ Compass
➢ GPS
➢ Tilt meter
➢ Clamp Meter
➢ Smart phone supporting Geo Tag photo
➢ After reaching the site Supervisor/Vendor team need to verify that all the TI equipment's
are in complete set and site is ready for installation.
Outdoor/Indoor Installation
➢ First of all the BTS cabinet and power plant cabinet is installed in the BTS bed/Equipment
room using the proper anchoring as per the customer standard.
➢ Then the installation of the Batteries are installed and other Telecom Equipment's ( BBU,
DCDU, IDU are installed in the 19” rack
➢ Then after Radio Antenna, MW antenna RRU are installed in the tower as per the
customer standard in the desired azimuth mentioned in the approved TSSR
.
Cable Routing
➢ All the cable(RRU power cable, CPRI cable, IF cable, etc.) from tower to the BTS bed/
Equipment Room is routed properly using the cable tie/Clamp as per material provided
by the customer.
➢ All the power equipment are grounded in the bus bar (TGB,EGB,IGB) as per the
standard.
➢ Then the power plant is connected with the AC power source from ACDB. And similarly
Battery connection is done resulting the total voltage of ( -48V DC) and connected to
the power plant.
➢ The equipment power cable is connected to the Power plant as per the standard.
➢ After verifying that all the connection the power is given to all the equipment by turning
ON the MCB or by connecting the fuse.
➢ Note:- All the Telecom equipment runs in -48V DC
MW antenna Commissioning and Alignment.
➢ IDU is commissioned by the supervisor/vendor team as per the pre shared Link budget
from the customer in both the end ( Near End and Far End).
➢ After the commissioning is completed the by the supervisor/Vendor team MW alignment
is done to achieve the desired receive level mentioned in the link budget.
➢ On Achieving the desired receive level Team locks the MW in the current positing and
alignment.
.
BTS Commissioning and Traffic Conformation .
➢ BTS commissioning is done by the Supervisor/Vendor Team using the desired software for
the related equipment ( Huawei or ZTE)
➢ Supervisor/Vendor Team conforms whether the site is connected or not with the
customer BSC team
➢ After getting the conformation from the customer BSC Team that the site is connected to
the BSC then traffic analysis is done get conformation from the BSC team.
.
Documentation like ( AAR and TIML).
➢ All the necessary equipment(Power cable, MCB, grounding cable) labeling using the
standard format.
➢ Then the Antenna Acceptance Report( AAR) is prepared as per the format given by the
customer with all supporting photographs
➢ Also TI material list( TIML) is being prepared noting down all the serial number of the TI
equipment that has been used in the site with all necessary photographs.
➢ All extra photographs are also taken including the routing and installation
➢ All the Document(AAR and TIML) and photographs to be provided to TI-Head.
➢ TI-Head process all the received document for approval from customer. After approval
Acceptance-Head keeps the record of the same.
Rollout Optical Fiber Process
➢ Design the network plan for the provided area and get approved from the customer.
➢ Request for the required material to the customer as per the network design.
➢ Assign the vendor for the work to lay the fiber as per the design.
➢ Check and monitor the progress of the laid fiber.
➢ Complete the fiber laying and integrate the network
End Customer Connection Process
➢ Receive the list of Client detail (Location, Contact detail) to be connect with the internet from the
customer.
➢ Coordinator will Assign Team/Vendor with the list of Client Details and provide the material as required.
➢ Team/Vendor completes the installation and informs the Coordinator.
➢ Coordinator will coordinate with the Customer NOC for the configuration to make the internet
workable.
➢ Team will verify the internet and provide the required photos along with the KYC of the Client.
Manage Service Process
➢ Received the Ticket of the client who have complained regarding the internet issue.
➢ Coordinator will assign the Ticket to the respective Team.
➢ Team will visit the customer and solve the issue.
➢ Coordinator will close the Ticket if issue has been solved.