This document is a bill of quantity for a hoist lift project. It includes 8 items: (1) project preparation work, (2) procurement and installation of an electric chain hoist, (3) construction of a 3-ton cargo lift cage, (4) structure and rail work for the cargo lift, (5) electrical work and control panel, (6) safety devices and overload protection, (7) certification by the Ministry of Manpower, and (8) testing and commissioning. The total cost of the project is Rp474,124,000.
This document is a bill of quantity for a hoist lift project. It includes 8 items: (1) project preparation work, (2) procurement and installation of an electric chain hoist, (3) construction of a 3-ton cargo lift cage, (4) structure and rail work for the cargo lift, (5) electrical work and control panel, (6) safety devices and overload protection, (7) certification by the Ministry of Manpower, and (8) testing and commissioning. The total cost of the project is Rp474,124,000.
This document is a bill of quantity for a hoist lift project. It includes 8 items: (1) project preparation work, (2) procurement and installation of an electric chain hoist, (3) construction of a 3-ton cargo lift cage, (4) structure and rail work for the cargo lift, (5) electrical work and control panel, (6) safety devices and overload protection, (7) certification by the Ministry of Manpower, and (8) testing and commissioning. The total cost of the project is Rp474,124,000.
I Pekerjaan Persiapan ls 1 Rp 15.200.000,00 Rp 15.200.000,00 - Administrasi dan dokumen proyek - Mobilisasi dan demobilisasi tekniis dan pekerja - Pek. Pengukuran, marking, dan penempatan lajur hoist - Pek, Pembersihan dan persiapan lokasi hoist - Kelengkapan k3 dan safety assestment total I Rp 15.200.000,00 II Pekerjaan pengadaan dan pemasangan unit hoist ls 1 Rp 57.824.000,00 Rp 57.824.000,00 Heavy Duty Class Electric Chain Hoist Brand NITCHI made in japan - Type MH5 - 030 - Capacity 3 TON - Lifting Height 18 M - Hoisting Speed 4,4 M/ minutes - Hoisting Motor 2,5 kw - Power Source 3 Phase/ 380V/ 50Hz - Rating 30 min - Test Load 3.75 TON - Insulation B Class (130ºC) - Control Low Voltage AC 24V - Thermal limiter Bimetal Overheating Protection Relay - Phase Protector Antiphase Protection Relay - Brake System Electromagnetic Brake - Chain Fall 1 Fall x Ø11.2mm - Over & Lower Protection : With Limit Switch - Index Protection IP54 - Duty Rating 40% ED - Weight Approx. 102 Kgs - Pendant 2 Point (U;D) total II Rp 57.824.000,00 III Pekerjaan Cargo Lift Cap. 3 Ton Berat Sangkar ± 1000 Kg Ls 1 Rp 266.250.000,00 Rp 266.250.000,00 PEKERJAAN SANGKAR - Dimensi Sangkar - P 2000mm x L 2000mm x T 2000mm - Opening Sangkar P 2000mm x T 2000mm - Dinding Sangkar Plat SR & Wiremesh - Tutup Atas Sangkar Plat SR - Lantai Sangkar Plate Bordest 3mm - Karet Buffer - Roda Getsu - 1 Set Pintu Sangkar Harmonika total III Rp 266.250.000,00 IV Pekerjaan Struktur dan Rail cargo Ls 1 Rp 88.750.000,00 Rp 88.750.000,00 - Tiang 4 sisi wf 200 - Spander wf 200 - Bracing - Hoist pedestal wf 250 - Base plate dan join rail - T-RAIL K-13 2 sisi - Roda getsu - Pintu ruang HARMONIKA 3 set - Finishing zinkchromate total IV Rp 88.750.000,00 V Pekerjaan Electrical dan CONTROL PANEL Ls 1 Rp 17.500.000,00 Rp 17.500.000,00 KONTROL OTOMATIS 3 LANTAI - Pilot Lamp with Digital Indicator - Wiring + Push button - Belden UTP (Cat. 5) - Modular Wiring/ Knock Down - Controller PLC LS - Phase Protector - Control Voltage 24V DC - Limit Switches - Manual up/down mode - Emergency Stop/ RESET - MCB - Full Logic automatic control total V Rp 17.500.000,00 VI Safety Device dan Overload Protector Set 1 Rp 9.600.000,00 Rp 9.600.000,00 total VI Rp 9.600.000,00 VII Sertifikasi DISNAKER Ls 1 Rp 11.700.000,00 Rp 11.700.000,00 total VII Rp 11.700.000,00 VIII Test dan Commisioning ls 1 Rp 7.300.000,00 Rp 7.300.000,00 total VIII Rp 7.300.000,00 TOTAL Rp 474.124.000,00
Bill of Material (Pembangunan Instalasi Sistem Pembangkitan Listrik Tenaga Hybrid (Panel Surya Dan Turbin Angin) Dengan Sistem Automatic Transfer Switch Di Rooftop Perumahan)