STATEMENT OF PROBABLE CONSTRUCTION COST
DIVISION 3 - CONCRETE
Passenger Elevator Pit Renovation LS $2,000.00
Total
DIVISION 5 - METALS
Passenger Elevator Mezzanine Metal Floor 240.0 SF $10.50
Mezzanine Stair 1 EACH $1,200.00
Mezzanine Guardrail 40 LF $50.00
Rope Grab 1 EACH $500.00
Pit Ladders 2 EACH $1,000.00
Louver 1 EACH $1,000.00
Revise Structure for New Equipment 1 L.S. $4,000.00
Total
ADDITIONAL ITEMS
PRFT / OVERHEAD 25%
DESIGN CONTINGENCY 2-1/2%
CONSTRUCTION CONTINGENCY 10%
Total
Grand Total
OPTIONS
$15,000
$93
$1,500
$10,000
$26,593
$37,000
$93
$1,500
$500
$500
$500
$2,000
$10,000
$52,093
$10,000
$1,000
$11,000
$2,000
$2,000
$2,000
$5,000
$5,000
$12,000
$1,000
$1,000
$2,520
$1,200
$2,000
$500
$2,000
$1,000
$4,000
$13,220
$261,000
$158,000
$48,000
$467,000
$9,863
$9,863
$8,539
$8,000
$15,000
$31,539
$626,308
$156,577
$15,658
$62,631
$234,866
$861,174
$10,000
$7,000
$17,000
$17,000
$4,250
$425
$1,700
$6,375
$23,375
$884,549