LFN SIF 3

HEAD CAPEX (Power from Owned (Power from


Generator) LFZ)
LFN to contruct &
Civil works Civil-Infra works (staff change room, toilets & hygiene equipment) $ 25,000
rent to addmie
2 Lines of Packaging Machinery with HVAC , Electrical panel and partition for machinery area with sea
Machinery $ 500,000 $ 500,000
freight
Generator - 150 KVA $ 25,000 $ -
Utilities Water treatment with RO $ 15,000 $ 15,000
HVAC for W/H ventilation $ 10,000 $ 10,000
Total CAPEX $ 550,000 $ 550,000

HEAD OTHER CAPEX AMOUNT AMOUNT


Building Cost of civil works - Building ( 1600 Sq mt) Infra ( 600 sq mt) $ 700,000
Storage Racking, pallets (1680 positions) and 1 MHE (reach truck) $ 365,000 $ 365,000

HEAD OTHER CAPEX - ALTERNATE LOCATION AMOUNT AMOUNT


Civil works Cost of land clearing & filling , road and Infrastructure works $ 350,000

LFN SIF 3
HEAD ANNUAL OPEX (Power from Owned (Power from
Generator) LFZ)

Space rental $ 130,000 $ 130,000


Cost of Power $ 70,000 $ 70,000
Total OPEX $ 200,000 $ 200,000