You are on page 1of 1

Repair Checklist No Document:

001/RC/I/2023

PT. REXLINE ENGINEERING INDONESIA


Jalan Margomulyo 46 Pergudangan Margomulyo Angtropolis H9
Kel. Greges, Kec. Asemrowo Surabaya, Jawa Timur 60183, Phone 6231 9934 3867
www.rexlineengineering.com

No SO: 00328 Project : Supply Roller & Pulley


Date: 19-Jan-23 Page : 1 of 1

Status
No Isues Action
Acc Reject
On the peeled rubber, a depth measurement is carried
out, then inject the adhesive into the rubber that was
1. The end of the lagging is peeling off √
measured earlier until the peeled rubber returns to its
original state
Clean the shaft where there is corrosion using a brush
until it is clean, then clean the former brush using a
2. The shaft is not lubricated √
cleaner and continue with applying lubricant or grease
to the shaft
Clean the paint by sanding the surface that feels bad
until it is smooth, then cleaning it with a clean cloth
3. Finishing Painting is not good enough. √
before repainting until the desired specifications are met
(paint thickness).
for an uneven shaft surface, the machining process is
4. Finishing shaft is not good enough (rough) √
carried out again to get maximum results
Filler is added to the shaft that has defects according to
5. There is a hole in the shaft √
the shaft repair procedure that we have

Prepared / Reviewed By, Approved By,

Chandra Bintang
Quality Control

You might also like