You are on page 1of 4

SHAUKAT KHANUM MEMORIAL CANCER HOSPITAL & RESEARCH CENTRE, LAHORE

PARKING GARAGE
FOR SUPPLY AND INSTALLATION of PASSANGER LIFTS AS SPECIFIED, INCLUDING ERECTION, TESTING & COMMISSIONING
"SCHEDULE OF PRICES"
PART-A
Employer-Established LC Items
RATE in quoted currency, CNF Karachi Sea Port AMOUNT,
AMOUNT, in
No. SUPPLY of IMPORTED ITEMS Qty UNIT Currency in quoted
In words In Figures Pak Rs
currency
1 3 4 5a 5b 5c 6a 6b

Imported Passenger Lifts of 1600 kg of


Traction Belt type (Car size min 1400mm
1 (w) x 2400 mm (d) x 2300mm height) shaft 2 EACH
size 8x10 ft of 1.0m/sec Speed Door min
(1200mm x 2100mm), Lifts will have
display above doors for all floors, wide jamb
on all the floor for specified 7 Nos of stops
in 7 Floors: Ground,1st, 2nd, 3rd, 4th, (along
with material/parts for 2 floors future
extension 5th & 6th Floor) of total travel of
67'-4’’ as per drawing with Machine Room
above & with Heavy duty SS with bump rail,
Cables, counter weights, control Panel DB,
ARD with battery backup, Earthquake
detection device with Air Conditioner above
the false ceiling with durable vinyl floor.
1.5mm Stainless Steel finish walls, ceiling
and heights in Lift Car including spare parts,
tools etc. as per manufacturer
recommendation. Lifts will have double
packing for transportation purpose. meeting
the Specifications and of approved make
and after getting its details approved from
the Engineer. Cost of Sea freight, insurance
from factory to port, import duties, taxes
clearance from Port etc. will be paid by
Employer.
Total
Carry forward to Item# 1 of SUMMARY OF TENDER PRICES Part-A, Employer-Established LC items Part-A
SHAUKAT KHANUM MEMORIAL CANCER HOSPITAL & RESEARCH CENTRE, LAHORE
PARKING GARAGE
FOR SUPPLY AND INSTALLATION OF EQUIPMENT/MATERIALS AS SPECIFIED, INCLUDING ERECTION,
TESTING & COMMISSIONING OF PASSANGER LIFTS
SCHEDULE OF PRICES - PART-B

No. ITEMS DESCRIPTION Qty UNIT RATE per unit, Rs AMOUNT, Rs

In Word In Figures

1 2 3 4 5a 5b 6
INSTALLATION OF Part-A EQUIPMENT
1 2 EACH
including but not limited to Inspection of
material at port, local insurance,
Transportation to site, unloading at Site, Joint
Inspection of Insurance Surveyor at site, Safe
keeping, rigging, assembly at Site, placing in
position in pit, shaft and machine room,
startup, commissioning and testing of
operation.

2 SUPPLY & INSTALLATION OF NON-LC ITEMS 2 LOT


Supply, installation of all local equipment
(Non-L.C) and materials, Machine room floor,
and all items in the shaft and machine room
necessary civil in machine room and lift shaft
as per specifications, drawings and as
approved by the Engineer/Employer and
including cable 4 core 16sqmm from power
source upto machine room) earthing cable of
6mm in the machine room and small DB with
breakers in the machine room etc. with
operation of Lifts by deploying expert
operators and maintenance with parts for one
year after taking over certificate and during
defect liability period till final completion
Certificate.
(Installation of Part-A items and Supply + Install All Items other than Part-A)