SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2014) REV 8 30-Jun-14

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
In-Plant Voice Paging System - Page Party Station -
SAIC-T-5205 31-Dec-14 TELECOM-
Outdoor - Materials Receiving
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A. Page Party Station - Outdoor - Materials Receiving

Schedule “Q”
Verify received materials have been inspected for damage and for
A1 Attachment IV,
compliance to applicable requirements
para. 3.3

Schedule “Q”
Verify equipment handling, storage and protection is as per
A2 Attachment IV,
Manufacturer’s Recommendation.
para. 6
Schedule "G"
A3 Verify that the received materials are new and unused.
Para. 4.1

Verify all equipment and components received comply with the project
Schedule "Q"
PO specification and shall conform to all applicable requirements,
A4 Attachment lV,
standards, and specifications prior to release to be used as part of the
para. 3.3
work.

Verify that all received electrical equipment comply with the NFPA 70
SAES-T-481,
A5 National Electrical Code (NEC), and shall meet the criteria set forth in
para. 6.2
SAES-B-055 and SAES-B-068 for classified areas

Verify received material is a multi-channel in-plant party paging systems


equipment, capable of conducting a minimum of five (5) simultaneous & SAES-T-481,
A6
full-duplex conversations, and each station of the party paging system is para. 5.2.1
equipped with paging capability capable of selecting other stations.

Verify that “in-plant party paging stations” operating voltage shall be 120
SAES-T-481,
A7 Volts AC, 60 Hz and includes speaker amplifier and termination points for
para. 5.2.2 & 3.
powering external speakers.

Verify that all station handsets shall comply with the following;
a.) Designed to be disconnected from the communications network
whenever the handset is on-hook (not in use).
b.) Handset microphone of party paging stations is equipped with noise SAES-T-481,
A8 cancellation device to minimize noise interference. para. 5.2.4 to
c.) Handset cable of party paging stations shall be retractile and para. 5.2.7
extendible to at least 180 cm.
d.) The handset shall be equipped with gain amplifier with adjustable
range.

Verify that speaker amplifier volume level of is internally adjustable. The


input and the output of the speaker amplifier shall be transformer coupled SAES-T-481,
A9
and The output side shall have two taps for both 8-ohms and 16-ohms para. 5.2.8 & 9
output impedance

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2014) REV 8 30-Jun-14
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
In-Plant Voice Paging System - Page Party Station -
SAIC-T-5205 31-Dec-14 TELECOM-
Outdoor - Materials Receiving
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

Ensure that equipment and accessories shall be traceable from the Scheduled “Q”
A10 manufacturer and supplier through delivery, storage, fabrication, Attachment IV,
erection, installation, repair, modification and use. para. 4.3

REMARKS:

REFERENCE DOCUMENTS:
1. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract)
2. Schedule Q -- Quality Requirements (Pro Forma Contract), Project Specific
3. SAES-T-481 -- In-Plant Voice Paging System, Issue 1 December 2014

NOTES:

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Signature and Name, Signature and
Date: Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Signature and Name, Signature and
Date: Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Signature and Name, Organization,
Date: Signature and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use