You are on page 1of 2

SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff -March 2013) Rev 7 31-Mar-13

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

General - Channel, Strut, and Support Materials - Material


SAIC-P-3005 30-Apr-13 ELECT
Receiving
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A. General Requirements

Schedule G
A1 Electrical materials shall be new and unused.
Sec. 2.1

Electrical materials shall be in accordance with the Saudi


Schedule G
A2 Aramco-approved project-specific design drawings, diagrams,
Sec. 2
schedules, lists, databases, and associated documents.

Schedule Q
A3 Electrical materials shall be free of damage.
Att. lV

Electrical materials shall conform to all applicable requirements,


Schedule Q
A4 standards, and specifications prior to release to be used as part of the
Att. lV
work.

Electrical materials shall be identified by using tags, stamps, color


Schedule Q
A5 coding, stencils or labels. The location and method of identification shall
Att. lV
not affect the function or quality of the materials.

Electrical materials shall be traceable from the manufacturer and supplier


Schedule Q
A6 through delivery, storage, fabrication, erection, installation, repair,
Att. lV
modification and use.

B. Specific Requirements for Channel, Strut, and Support Materials

Channel erector system components (Unistrut or similar) used to support


conduits, cable trays, enclosures, lighting fixtures and other electrical SAES-P-104
B1
equipment shall be made of steel or iron, either hot-dip galvanized Sec. 8.10.1
(preferably), or zinc electroplated as supplied by the manufacturer.

Channel erector system components (Unistrut or similar) used to support


conduits, cable trays, enclosures, lighting fixtures and other electrical
SAES-P-104
B2 equipment in severe corrosive environments shall be: (A) as specified in
Sec. 8.10.2
Paragraph 8.10.1 of SAES-P-104, and in addition, protected by the
methods outlined in Paragraphs 8.9.2 (a) or (b).

Channel erector system components (Unistrut or similar) used to support


conduits, cable trays, enclosures, lighting fixtures and other electrical SAES-P-104
B3 equipment in severe corrosive environment shall be made of (1) stainless Sec. 8.10.2
steel or (2) fiberglass

Page 1 of 2
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff -March 2013) Rev 7 31-Mar-13

SAUDI ARAMCO INSPECTION CHECKLIST SAIC NUMBER DATE APPROVED QR NUMBER

General - Channel, Strut, and Support Materials - Material


SAIC-P-3005 30-Apr-13 ELECT
Receiving
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Process piping shall not be used to support conduits, except with the
Proponent's approval. If process piping is used to support conduits, SAES-P-104
B4
adequate corrosion protection at the interface between the piping and Sec. 8.10.3
support fittings shall be provided.

Bare Channel erector system component shall be coated with:


SAES-P-104
B5 (1)PVC patching compound or with SAES-H-101 APCS -22 (offshore) or
Sec. 8.9.2
APCS-26 (onshore) for PVC coated materials.

REMARKS:

REFERENCE DOCUMENTS:
1. Schedule G - Material, Tools and Equipment (Pro Forma MP-IK-LS Contract), March 2006
2. Schedule Q - Quality Requirements (Pro Forma Contract), Nov. 2003 and Feb. 2008
3. SAES-P-104 - Wiring Methods and Materials, 08 August 2010
4. Unistrut Metal Framing - Application, Installation, Specification Guide, 1997

NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).

3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products or
services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing states
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified purpose.

4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
concerned with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the
manufacturer indicates compliance with appropriate standards or performance in a specified manner.

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 2 of 2