Professional Documents
Culture Documents
00 30-Jun-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Copper Tubing & Fittings Installation and
SAIC-J-6006 24-Jul-18 INST
Pre-Commissioning
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A Document Review and Certification
Identification - Instrumentation materials shall be identified by using tags,
Schedule Q
stamps, color coding, stencils or labels. The location and the method of
A1 Att. lV
identification shall not affect the function or quality of the item being
Sec. 4.2
identified.
Schedule G
A2 New and Unused - Instrumentation materials shall be new and unused.
Sec. 2.1
Verify that the contractor or it's Saudi Aramco approved third party
Schedule Q
inspector performed the quality activities at the supplier and sub-supplier
A7 Att. III
locations as required by the inspection level assigned for the materials
3.2
and equipment identified in SAER-1972 Inspection Requirements.