You are on page 1of 2

November 8, 2022

Gelo Mendoza
Client

RE: S E R V I C E P R O P O S A L
ENGINEERING DRAWING SET

Good day!

Hello Sir,

The Project Requirements for your Two Storey with Loft mixed-use seaside project , have been
carefully studied and its site context. Attached herewith are the services that we see fit to be
rendered for the Client.

I. PROJECT CONTEXT

A. REF. FROM CLIENT; https://drive.google.com/file/d/17PwmntvTQkn5gvAgDTwf_9J2wYCVSPGU/view?usp=sharing

B. DELIVERABLES – Engineering Drawings to be used for Construction & Building Permit.

II. PROJECT DELIVERABLES

A. CONTRACT DOCUMENT PHASE


ENGINEERING DRAWINGS (20X30 Blueprints, 6 sets) – Drawings and documents for Building
Permit Requirements Construction, Duly Signed & Sealed by Professionals.
1. STRUCTURAL (Design Consideration of Retaining Walls & Seaside Property)
-PLANS, STRUCTURAL ANALYSIS, & REPORTS; Structural modeling, Analysis, and
Design using structural software (ETABS 19 and STAAD RCDC)
-With wind and seismic analysis in compliance with NSCP 2015
-Building parameters will be based to the latest National Building Code of the
Philippines (NSCP 2015), and other international book references, such as ACI 318-14
for concrete structure, AISC for steel structure and ASCE 7-10 for loadings.
Requirements for analysis: complete architectural drawings

AR. E L L A S E L O M
0998 - 887 - 7553
S D E S I G N C L I Q U E @ GMAIL.COM
2. PLUMBING
- Sanitary Plans and forms signed and sealed in compliance with NPC 1959
- Revised Plumbing Code of the Philippines. 5
3. ELECTRICAL
- Electrical plans, forms and Analysis signed and sealed in compliance with NEC 2017
Consultation, Correction on Loadings
- Electrical Analysis
DELIVERABLE TIMELINE: The duration of work for the plans and analysis is 2 weeks upon
approved and received required plans and documents.

II. SERVICE FEES

For the above-enumerated Workflow and Deliverables, we would like to stipulate our Respective
Professional Service fees:

Php 45,000.00*
Forty-Five Thousand in Philippine Currency
*Exclusive of Tax

Manner of Payment
A. Signing of Agreement of the Service Proposal (30%) PHP 13,500.00
B. Approval of E-copies for Printing Production (30%) PHP 13,500.00
C. Turn-over of Construction Drawings (40%) PHP 18,000.00
Bank Details: Union Bank
Acc. Name: Gian Ella Selom
Acc. No.: 1093 2058 1753

If you find the Design Service Proposal well, kindly affix your signature in the space provided
below. Thank you!

Kind Regards,

Prepared by: Approved by:

Ar. Gian Ella C. Selom Gelo Mendoza


Project Lead Client

AR. E L L A S E L O M
0998 - 887 - 7553
S D E S I G N C L I Q U E @ GMAIL.COM

You might also like